Management, Vol. 2, No 1, pp. 1–12.
Rahimi, G., Ghodusi, N., Zamani, A. and Goli, M. (2013), “Compare the Application of
Symmetry Elements (5S) in the Department of Youth and Sports, Isfahan Province”,
International Journal of Scientific Research in Knowledge, Vol. 1, No. 6, pp. 148–153.
Rahman, M.N.A., Khamis, N.K., Zain, R.M., Deros, B.M. and Mahmood, W.H.W. (2010),
“Implementation of 5S Practices in the Manufacturing Companies: A Case Study”,
American Journal of Applied Sciences, Vol. 7, No. 8, pp. 1182–1189.
Rane, S.B., Bhosale, A.V., Mantha, S.S. and Aravandekar, S.G. (2004), “Effective JIT
implementation using 5S philosophy”, Proceedings of 1st International Conference on
Manufacturing and Management (GCMM–2004), Organized by Queensland University
of Technology, Australia & VIT, Vellore, Narosa Publication, pp. 260–265.
Ravikumar, M.M., Marimuthu, K. and Chandramohan, D. (2009), “Implementation of Lean
Manufacturing in Automotive Manufacturing Plant [TEL]”, International Journal of
Applied Engineering Research, Vol. 4, No. 10, pp. 2041–2050.
Rich et al. (2006), Lean evolution: Lessons from the workplace, Cambridge University Press.
New York.
Salunkhe, R.T., Kamble, G.S. and Malage, P. (2009), “Inventory Control and Spare Part
Management through 5S, KANBAN and Kaizen at ABC Industry”, IOSR Journal of
Mechanical and Civil Engineering (IOSR-JMCE), Proceedings of 2nd International
Conference on Emerging Trends in Engineering and Technology (ICETET-09), G.H.
Raisoni College of Engineering, Nagpur & G.H.R. Labs, December 16-18, pp. 43–47.
Shah, R. and Ward, P.T. (2007), “Defining and developing measures of lean production”,
Journal of Operations Management, Vol. 25, No. 4, pp. 785–805.
Downloaded by University of Colorado Boulder At 23:40 17 January 2017 (PT)
43 of 45
Shangyou, Z. and Yaqing, T. (2011), “Defects and Improvement of 5S Implementation in the
Workshop of MTO Electronic Assembly Industry at the Pearl River Delta Economic
Zone”, International Conference on Management and Service Science (MASS), 12–14
Aug. 2011, Wuhan, IEEE 978–1–4244–6581–1/11, http://ieeexplore.ieee.org/, pp. 1–4.
Shimbun, N.K (1995), Visual control systems – Factory management series visual control
innovations in Japan most advanced companies, Taylor & Francis, N.J.
Singer, E. and Becker, K. (2013), “A single-source content management system for lean
manufacturing”, International Journal of Lean Six Sigma, Vol. 4, No. 1, pp. 83–103.
Singh, J., Rastogi, V. and Sharma, R. (2014), “Implementation of 5S practices: A review”,
Uncertain Supply Chain Management, Vol. 2, No. 3, pp. 155–162.
Singh, R., Gohil, A.M., Shah, D.B. and Desai, S. (2013), “Total Productive Maintenance (TPM)
Implementation in a Machine Shop: A Case Study”, Procedia Engineering, Vol. 51, pp.
592–599.
Skinner, C. (2001), “5S: The Lean Roadmap”, from http: / /www.sae.org/topics/leannovO l.html.
Sorooshian, S., Salimi, M., Bavani, S. and Aminattaheri, H. (2012), “Experience of 5S
Implementation”, Journal of Applied Sciences Research, Vol. 8, No. 7, pp. 3855–3859.
Srinivasan, S. (2010), “ The impact of 5S on the safety climate of manufacturing workers”, A
Master of Science Thesis, Graduate Faculty of Louisiana State University and
Agricultural and Mechanical College, LA, USA.
Steven, I. (2011), “Leak Test Process: Using lean and 5S to drive the manufacturing process
improvements”, Vulcan GMS Inc., pp. 30–33.
Strategic Direction (2005), “The new improvement frontier, Developing lean administration”,
Chia sẻ với bạn bè của bạn: |