Resettlement, Livelihoods and Ethnic Minorities Development Program (rldp) Final version – March 2010 Annexes Annexes



tải về 5.33 Mb.
trang22/34
Chuyển đổi dữ liệu24.07.2016
Kích5.33 Mb.
#3228
1   ...   18   19   20   21   22   23   24   25   ...   34

2.6. Resettlement Site Planning


Table A 21: Relocation Site Capacity

Proposed Resettlement Site

Key Information

1. Trung Son Commune

4 sites: Ta Puc, Co Tong – Ta Ma, Keo Dam (Ta Ban village) and Ban Xuoc village



To relocate about 200 affected HH in Ta Ban and To Xuoc, Come villages within Trung Son commune.

- To Ta Puc site: 42 HH with 175 heads.

- To Co Tong-Ta Ma site: (1) Pom Chon 47 HH with 196 heads

(2) Keo Đau 30 HH With 125 heads

- Keo Dam: 58 HH with 242 heads

- To Xuoc, Ban Co Me: 26 HH with 106 heads



2. Muong Ly Commune

2 sites: Tai Chanh village, Ban Nang,



To relocate for 90 affected HH in Ban Nang 1 and Tai Chanh.

- To Ban Tai Chanh site: 37 HH with 182 heads

- To Ban Nang site: 52 HH with 244 heads

- To Ban Muong 2: Just to move 13 Hmong HH to higher elevation.



3. Trung Ly Commune

2 sites: Ban Lin, Ban Chieng



To relocate for 36 affected HH in Ban Lin (20 HH) and To Chieng, Ban Co Cai (17 HH).

- To Ban Lin site: 21 HH with 109 heads

- To Chieng – Ban Co Cai site: 17 HH with 79 heads;

- For 16 HH of Hmong in Ban Pa Bua just to move up to higher elevation.



4. Tan Xuan Commune

To relocate for 199 affected HH of Dong Ta Lao and Tay Ta Lao within Tan Xuan commune.

- To Tham Ton 1: 54 HH with 234 heads

- To Pom Hien- Suoi Non 1: 68 HH with 295 heads

- To Pom Hien- Suoi Non 2: 69 HH with 299 headsTo Tham Ton 2: 30 HH with 130 heads



Source: Resettlement Masterplan revised after consultations

Table A 22: Land Affected at Planned Resettlement Sites



Locality

Perennial crop land

One crop- paddy

Hilly rice land

Other annual crop land

Natural forest land

Commercial forest

land


Others

Total

Quan Hoa

5.00

7.20

59.00

168.00

281.00

627

1,179.4

2,326.6

Site 1

5.00

7.20

59.00

168.00

281.00

627

1,179.4

2,326.6

Muong Lat

3.60

8.20

97.00

188.00

884.00

51

1,048.2

2,280.0

Site 2

2.60

5.00

68.00

153.00

558.00

18

799.40

1,604.0

Site 3

1.00

3.20

29.00

35.00

326.00

33

248.,80

676.0

Moc Chau

0.00

2.00

0.00

145.00

0.00

514

223.00

884.0

Site 4

0.00

2.00

0.00

145.00

 

514

223.00

884.00

Total

8.60

17.40

156.00

501.00

1,165.00

1.92

2,450.60

5,490.60

Table A 23: Land Use and Land Development in Planned Resettlement Sites

Trung Son site






Current use

Planning

Average per HH (210 HH)

Total

Ta Ban

To Xuoc- Co Me

Total

Ta Ban

To Xuoc-

Co Me

Total area

2,326.6

1,765.4

561.2

2,326.6

1,764.4

562.2

11.08

1. Agricultural land

235.6

204.6

31.0

239.2

208.2

31.0

1.14

2. Forestry land

908.0

452.0

456.0

908.0

452.0

456.0

4.32

3. Non-Agricultural land

195.0

191.0

4.0

235.2

221.0

14.2

1.12

4. Non-use land

988.0

917.8

70.2

944.2

883.2

61.0

4.50

Muong Ly site

Land type

Current use

Planning

Average per HH

Total

Ban Nang

Ban Tai Chanh

Total

Ban Nang

Ban Tai Chanh

Total land area

1,604.0

986.00

618.00

1,604

987.50

616.50

 

1. Agricultural land

228.6

105.00

123.60

231.10

106.00

125.10

2.24

2. Forestry land

596.0

438.00

158.00

596.00

438.00

158.00

5.79

3. Non-Agricultural land

174.0

82.50

91.50

194.10

93.00

101.10




4. Unused land

605.4

360.50

244.90

582.80

350.50

232.30




Trung Ly site

Land type

Current

Planning

Average per HH

Total

Ban Lin

To Chieng

Total

Ban Lin

To Chieng

Total land area

676.0

419.0

257.0

676.0

419.0

257.0




1. Agricultural land

68.20

34.20

34.00

68.60

34.60

34.00

1.33

2. Forestry land

359.00

255.00

104.00

359.00

255.00

104.00

7.04

3. Non-Agricultural land

76.70

35.20

41.50

88.00

39.00

49.00




4. Unused land

172.10

94.60

77.50

160.40

90.40

70.00




Tan Xuan site

Land type

Current use

Planning

Average per HH

Total

Dong, Tay Ta Lao

Total

Dong, Tay Ta Lao

Total land area

884.0

884.0

884.0

884.0




1. Agricultural land area

147,00

147,00

197,00

197,00

1.03

2. Forestry land area

514,00

514,00

675,00

675,00

3.52

3. Non-agricultural land

0,00

0,00

12,00

12,00




4. Unused land

223,00

223,00

 

 




Table A 24: Infrastructure in Planned Resettlement Sites

Trung Son Commune: Ta Puc, Co-Tong-Ta Ma and Keo Dam sites



Schools and culture

One class at Co Tong- Ta Ma (100 m2), 2 kindergartens (100 m2), accommodation for teachers (50 m2), cultural house (100 m2).

Kindergarten, village class and one community cultural house (2,000 m²) in Ta Ban

Kindergarten, village class and one community cultural house with 1,000 m² in To Xuoc



Transportation

New access road from Co Me bridge to the resettlement site, 4.2 km long, class A.

New rural road type B from Co Tong to Ta Ma – Ta Puc, 9 km, class B.

New road from junction of Xuoc (at Keo Dam) to Suoi Quang wharf and to resettlement site Ban Xuoc, 3.5 km, class B.

Inter-road at Ta Puc resettlement site, 1 km, class B.

Inter-road at Co Tong-Ta Ma, 2 km, class B.

New access roads to farming site, 6 km, class B.

Two wharfs for boats crossing the reservoir/ river;



Electricity

Power supply (i) Transmission line of 35 kv from Co Tong to Ta Ma of 4 km long; (ii) Transmission line of 0.4 kv of 4 km long and one transformer of 100 KVA for 83 HH; (iii) Transmission line of 35 kv from Ta Puc to To Xuoc of 3.5 km long; (iv) Transmission line of 0.4 kv of 01 km long and two transformers of 35 KVA for 40 HH at Keo Dam site and 26 at Ban Xuoc site



Water supply for domestic use and irrigation

(i) new weir on Cap creek, 8 km long of diversion pipe to supply water for domestic, 3 km of pipe to supply water for irrigation of 6.5 ha of rice with two crops at Co Tong-Ta Ma; (ii) new weir on Ta Puc creek, 3 km long of diversion pipe to supply water to 60 HH at Ta Puc site, 2 km of pipe for irrigation to 3.5 ha of rice; (iii) new weir on Xuoc creek and 3 km long of diversion pipe to supply water for domestic use and 1 km of pipe to irrigate 2.0 ha of rice



Paddy field opening

12.2 ha will be developed for rice. Ta Puc (3.5 ha), Cap creek (6.7 ha) and Phuoc creek (2 ha).



Muong Ly Commune: Ban Nang and Tai Chanh sites

Schools and culture

2 kindergartens with 100 m2; 2 community cultural houses with an area of 120 m2.



Transportation

New access road from Tam Chung to Muong Ly, 4.0 km long, class A

New road of 4 km of inter roads at the sites, class B


Electricity

The line 35 kV and 0.4 kV from the center of commune to each household, and The line 35Kv and 0.4kV will connect the construction site to each HH.



Water supply for domestic and irrigation

Two weirs, one on Tai Chanh (Nun creek) and 2.5 km long of diversion pipe to supply water for irrigation for 4 ha with two rice crops per year, 4 km of pipe for domestic use. One weir on Nay creek with 3 km long of diversion pipe to supply water for irrigation to 3.5 ha of rice with two crops per year, 04 km of pipe for domestic water use



Paddy field opening

7.5 ha will be developed for rice with two crops per year at Ban Nang and Ban Tai Chanh.



Trung Ly Commune: To Chieng and Co Cai sites

Schools and culture

One Kindergarten; one primary class and community cultural house with total construction area of about 1,000 m2.



Transportation

New access to the resettlement sites with 3.0 km long and with class B of rural road type



Electricity

Lines, 35 kV and 0.4 kV, from the center of commune to each household, and from construction site to each HH



Water supply for domestic and other purposes

(i) construct a weir on Lin creek with a length of about 30 m and 2 km long of irrigation canal to supply water for 3.6 ha of paddy, 2.5 km long of diversion pipe to supply water domestic; (ii) construct a weir on Huoi creek and 4 km long of diversion pipe to supply water domestic to To Chieng resettlement site.



Paddy field opening

3.6 ha for rice with two crops per year



Tan Xuan Commune: Pom Hien- Suoi Non, Tam Ton 1 and Tam Ton 2 sites

Schools and culture

3 kindergartens with an area of 190 m2, 3 primary classes with an area of 190 m2; accommodation for teachers with an area of 130 m2 and 02 community cultural houses with an area of 160 m2



Transportation

New road, 4.0 km long from Tan Xuan commune center to a junction of Cay Da, rural class A;

New road, 2.0 km long, from a junction of Pom Hien to Tham Ton 2, rural class B;

New road, 2.0 km long, from a junction of Pom Hien to Tham Ton 1, rural class B;

New road, 6.0 km long to support for farming, rural class B;

One bridge to connect Tay Ta Lao to Center of Tan Xuan commune and one wharf to connect with farming sites in Ban Cam.



Electricity

To Pom Hien- Suoi Non site: transmission line of 35 kV with 4.5 km and 1 km of 0.4 kV from center of Xuan Nha commune to the relocation site and a transformer 50 KVA.

To Tham Ton 1 site: transmission line of 35 kV with 2 km and02 km of 0.4 kV and a transformer 100 KVA.

To Tham Ton 2 site: transmission line of 35 kV with 0.5 km and 0.5 km of 0.4 kV and a transformer 35 KVA



Water supply for domestic and other purposes

Water supply for domestic and other purposes: construct a weir on the Co Nao creek and 10 km pipe to supply water to area of rice with one crop per year and 4 km of pipe for domestic use



Paddy field opening

None


Table A 25: Water Supply in the Four Planned Resettlement Sites

Resettlement site

Name of water source

Discharge

Distance to resettlement site

Heigh difference / reset-tlement site

Number of households to be supplied

Type of water supply

Resettlement site No.1

Keo đắm-Keo đau-Pom chon

Cáp stream

9 (l/s)

6.6 Km

142 m

136

Gravity - individual

Tà pục

Tà Pục stream

4 (l/s)

1.1 Km

49 m

51

Gravity - individual

Xước

Xước stream

1.1 (l/s)

0.3 Km

53 m

34

Gravity - individual

Resettlement site No.2

Tài chánh

Tài Chánh stream

9 (l/s)

2.5 Km

98 m

37

Gravity -individual

Nàng

Nang village

4 (l/s)

3.8 Km

53 m

57

Gravity - individual

Resettlement Site No.3

Lìn

Lin village

8 (l/s)

1.1 Km

54 m

20

Gravity - individual

Chiềng subvillage

Mó nước
Tà Buông

1 (l/s)

0.4 Km

40 m

17

Gravity -individual

Resettlement site No.4

Tham Ton


Mó nước Co Nào 1

0.7 l/s (60m3/ day & night)

0,5 Km

3m

54

Gravity system - public tank

Mó nước Co Nào 3

0.15 l/s (12m3/ day & night)

1 Km

15

Tham Ton 2

Mó nước Co Nào 2

0.6 l/s (50m3/ day & night)

1 Km

24m

31

Gravity – individual

Pom Hiến –

Suối Nón



 

 

 

 

 

 

Pom Hiến - Suối Nón (agglomeration 1)

Mó nước Pom Hiến

1 l/s (80m3/day & night)

3 Km

120 m

60

Gravity - individual

Tà Lót water source

0,3 l/s (26m3/ day & night)

1.5 Km

150 m

Pom Hiến - Suối Nón water source (agglomeration 2)

Pươi stream

0,8 l/s (70 m3/ day & night)

1.5 Km

100 m

40 relocated hh and 20 hosting hh

Gravity - individual

Source: water supply survey in resettlement sites (baseline design).
Based on 80 l/person/24 hours, which is higher than the Construction standard of Vietnam TCXDVN 33: 2006: water supply - pipe line network and work, 60 l/person/24 hours.

Каталог: images -> home -> files
images -> BÀi thuyết trình cách xáC ĐỊnh và chế ĐỘ pháp lý CỦa các vùng biển theo công ưỚc của liên hiệp quốc về luật biển năM 19821
images -> Céng hßa x· héi chñ nghÜa viÖt nam Độc lập tự do hạnh phúc
images -> Lúa gạo Việt Nam Giới thiệu
images -> Trung Tâm kt tc-đl-cl
images -> Số: 105/2008/QĐ-ttg CỘng hòa xã HỘi chủ nghĩa việt nam độc lập Tự do Hạnh phúc
images -> ChuyêN ĐỀ ĐẠi số TỔ HỢP, XÁc suất kiến thức cơ bản Đại số tổ hợp
images -> BỘ giáo dục và ĐÀo tạo trưỜng đẠi học luật tp. HỒ chí minh dưƠng kim thế nguyên thủ TỤc phá SẢn các tổ chức tín dụng theo pháp luật việt nam
images -> Review of Condor, Sun Grid Engine and pbs
files -> TẬP ĐOÀN ĐIỆn lực việt nam công ty tnhh mtv thủY ĐIỆn trung sơN

tải về 5.33 Mb.

Chia sẻ với bạn bè của bạn:
1   ...   18   19   20   21   22   23   24   25   ...   34




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương