Table A 21: Relocation Site Capacity
Proposed Resettlement Site
|
Key Information
|
1. Trung Son Commune
4 sites: Ta Puc, Co Tong – Ta Ma, Keo Dam (Ta Ban village) and Ban Xuoc village
|
To relocate about 200 affected HH in Ta Ban and To Xuoc, Come villages within Trung Son commune.
- To Ta Puc site: 42 HH with 175 heads.
- To Co Tong-Ta Ma site: (1) Pom Chon 47 HH with 196 heads
(2) Keo Đau 30 HH With 125 heads
- Keo Dam: 58 HH with 242 heads
- To Xuoc, Ban Co Me: 26 HH with 106 heads
|
2. Muong Ly Commune
2 sites: Tai Chanh village, Ban Nang,
|
To relocate for 90 affected HH in Ban Nang 1 and Tai Chanh.
- To Ban Tai Chanh site: 37 HH with 182 heads
- To Ban Nang site: 52 HH with 244 heads
- To Ban Muong 2: Just to move 13 Hmong HH to higher elevation.
|
3. Trung Ly Commune
2 sites: Ban Lin, Ban Chieng
|
To relocate for 36 affected HH in Ban Lin (20 HH) and To Chieng, Ban Co Cai (17 HH).
- To Ban Lin site: 21 HH with 109 heads
- To Chieng – Ban Co Cai site: 17 HH with 79 heads;
- For 16 HH of Hmong in Ban Pa Bua just to move up to higher elevation.
|
4. Tan Xuan Commune
|
To relocate for 199 affected HH of Dong Ta Lao and Tay Ta Lao within Tan Xuan commune.
- To Tham Ton 1: 54 HH with 234 heads
- To Pom Hien- Suoi Non 1: 68 HH with 295 heads
- To Pom Hien- Suoi Non 2: 69 HH with 299 headsTo Tham Ton 2: 30 HH with 130 heads
|
Source: Resettlement Masterplan revised after consultations
Table A 22: Land Affected at Planned Resettlement Sites
Locality
|
Perennial crop land
|
One crop- paddy
|
Hilly rice land
|
Other annual crop land
|
Natural forest land
|
Commercial forest
land
|
Others
|
Total
|
Quan Hoa
|
5.00
|
7.20
|
59.00
|
168.00
|
281.00
|
627
|
1,179.4
|
2,326.6
|
Site 1
|
5.00
|
7.20
|
59.00
|
168.00
|
281.00
|
627
|
1,179.4
|
2,326.6
|
Muong Lat
|
3.60
|
8.20
|
97.00
|
188.00
|
884.00
|
51
|
1,048.2
|
2,280.0
|
Site 2
|
2.60
|
5.00
|
68.00
|
153.00
|
558.00
|
18
|
799.40
|
1,604.0
|
Site 3
|
1.00
|
3.20
|
29.00
|
35.00
|
326.00
|
33
|
248.,80
|
676.0
|
Moc Chau
|
0.00
|
2.00
|
0.00
|
145.00
|
0.00
|
514
|
223.00
|
884.0
|
Site 4
|
0.00
|
2.00
|
0.00
|
145.00
|
|
514
|
223.00
|
884.00
|
Total
|
8.60
|
17.40
|
156.00
|
501.00
|
1,165.00
|
1.92
|
2,450.60
|
5,490.60
|
Table A 23: Land Use and Land Development in Planned Resettlement Sites
Trung Son site
|
Current use
|
Planning
|
Average per HH (210 HH)
|
Total
|
Ta Ban
|
To Xuoc- Co Me
|
Total
|
Ta Ban
|
To Xuoc-
Co Me
|
Total area
|
2,326.6
|
1,765.4
|
561.2
|
2,326.6
|
1,764.4
|
562.2
|
11.08
|
1. Agricultural land
|
235.6
|
204.6
|
31.0
|
239.2
|
208.2
|
31.0
|
1.14
|
2. Forestry land
|
908.0
|
452.0
|
456.0
|
908.0
|
452.0
|
456.0
|
4.32
|
3. Non-Agricultural land
|
195.0
|
191.0
|
4.0
|
235.2
|
221.0
|
14.2
|
1.12
|
4. Non-use land
|
988.0
|
917.8
|
70.2
|
944.2
|
883.2
|
61.0
|
4.50
|
Muong Ly site
Land type
|
Current use
|
Planning
|
Average per HH
|
Total
|
Ban Nang
|
Ban Tai Chanh
|
Total
|
Ban Nang
|
Ban Tai Chanh
|
Total land area
|
1,604.0
|
986.00
|
618.00
|
1,604
|
987.50
|
616.50
|
|
1. Agricultural land
|
228.6
|
105.00
|
123.60
|
231.10
|
106.00
|
125.10
|
2.24
|
2. Forestry land
|
596.0
|
438.00
|
158.00
|
596.00
|
438.00
|
158.00
|
5.79
|
3. Non-Agricultural land
|
174.0
|
82.50
|
91.50
|
194.10
|
93.00
|
101.10
|
|
4. Unused land
|
605.4
|
360.50
|
244.90
|
582.80
|
350.50
|
232.30
|
|
Trung Ly site
Land type
|
Current
|
Planning
|
Average per HH
|
Total
|
Ban Lin
|
To Chieng
|
Total
|
Ban Lin
|
To Chieng
|
Total land area
|
676.0
|
419.0
|
257.0
|
676.0
|
419.0
|
257.0
|
|
1. Agricultural land
|
68.20
|
34.20
|
34.00
|
68.60
|
34.60
|
34.00
|
1.33
|
2. Forestry land
|
359.00
|
255.00
|
104.00
|
359.00
|
255.00
|
104.00
|
7.04
|
3. Non-Agricultural land
|
76.70
|
35.20
|
41.50
|
88.00
|
39.00
|
49.00
|
|
4. Unused land
|
172.10
|
94.60
|
77.50
|
160.40
|
90.40
|
70.00
|
|
Tan Xuan site
Land type
|
Current use
|
Planning
|
Average per HH
|
Total
|
Dong, Tay Ta Lao
|
Total
|
Dong, Tay Ta Lao
|
Total land area
|
884.0
|
884.0
|
884.0
|
884.0
|
|
1. Agricultural land area
|
147,00
|
147,00
|
197,00
|
197,00
|
1.03
|
2. Forestry land area
|
514,00
|
514,00
|
675,00
|
675,00
|
3.52
|
3. Non-agricultural land
|
0,00
|
0,00
|
12,00
|
12,00
|
|
4. Unused land
|
223,00
|
223,00
|
|
|
|
Table A 24: Infrastructure in Planned Resettlement Sites
Trung Son Commune: Ta Puc, Co-Tong-Ta Ma and Keo Dam sites
Schools and culture
One class at Co Tong- Ta Ma (100 m2), 2 kindergartens (100 m2), accommodation for teachers (50 m2), cultural house (100 m2).
Kindergarten, village class and one community cultural house (2,000 m²) in Ta Ban
Kindergarten, village class and one community cultural house with 1,000 m² in To Xuoc
|
Transportation
New access road from Co Me bridge to the resettlement site, 4.2 km long, class A.
New rural road type B from Co Tong to Ta Ma – Ta Puc, 9 km, class B.
New road from junction of Xuoc (at Keo Dam) to Suoi Quang wharf and to resettlement site Ban Xuoc, 3.5 km, class B.
Inter-road at Ta Puc resettlement site, 1 km, class B.
Inter-road at Co Tong-Ta Ma, 2 km, class B.
New access roads to farming site, 6 km, class B.
Two wharfs for boats crossing the reservoir/ river;
|
Electricity
Power supply (i) Transmission line of 35 kv from Co Tong to Ta Ma of 4 km long; (ii) Transmission line of 0.4 kv of 4 km long and one transformer of 100 KVA for 83 HH; (iii) Transmission line of 35 kv from Ta Puc to To Xuoc of 3.5 km long; (iv) Transmission line of 0.4 kv of 01 km long and two transformers of 35 KVA for 40 HH at Keo Dam site and 26 at Ban Xuoc site
|
Water supply for domestic use and irrigation
(i) new weir on Cap creek, 8 km long of diversion pipe to supply water for domestic, 3 km of pipe to supply water for irrigation of 6.5 ha of rice with two crops at Co Tong-Ta Ma; (ii) new weir on Ta Puc creek, 3 km long of diversion pipe to supply water to 60 HH at Ta Puc site, 2 km of pipe for irrigation to 3.5 ha of rice; (iii) new weir on Xuoc creek and 3 km long of diversion pipe to supply water for domestic use and 1 km of pipe to irrigate 2.0 ha of rice
|
Paddy field opening
12.2 ha will be developed for rice. Ta Puc (3.5 ha), Cap creek (6.7 ha) and Phuoc creek (2 ha).
|
Muong Ly Commune: Ban Nang and Tai Chanh sites
Schools and culture
2 kindergartens with 100 m2; 2 community cultural houses with an area of 120 m2.
|
Transportation
New access road from Tam Chung to Muong Ly, 4.0 km long, class A
New road of 4 km of inter roads at the sites, class B
|
Electricity
The line 35 kV and 0.4 kV from the center of commune to each household, and The line 35Kv and 0.4kV will connect the construction site to each HH.
|
Water supply for domestic and irrigation
Two weirs, one on Tai Chanh (Nun creek) and 2.5 km long of diversion pipe to supply water for irrigation for 4 ha with two rice crops per year, 4 km of pipe for domestic use. One weir on Nay creek with 3 km long of diversion pipe to supply water for irrigation to 3.5 ha of rice with two crops per year, 04 km of pipe for domestic water use
|
Paddy field opening
7.5 ha will be developed for rice with two crops per year at Ban Nang and Ban Tai Chanh.
|
Trung Ly Commune: To Chieng and Co Cai sites
Schools and culture
One Kindergarten; one primary class and community cultural house with total construction area of about 1,000 m2.
|
Transportation
New access to the resettlement sites with 3.0 km long and with class B of rural road type
|
Electricity
Lines, 35 kV and 0.4 kV, from the center of commune to each household, and from construction site to each HH
|
Water supply for domestic and other purposes
(i) construct a weir on Lin creek with a length of about 30 m and 2 km long of irrigation canal to supply water for 3.6 ha of paddy, 2.5 km long of diversion pipe to supply water domestic; (ii) construct a weir on Huoi creek and 4 km long of diversion pipe to supply water domestic to To Chieng resettlement site.
|
Paddy field opening
3.6 ha for rice with two crops per year
|
Tan Xuan Commune: Pom Hien- Suoi Non, Tam Ton 1 and Tam Ton 2 sites
Schools and culture
3 kindergartens with an area of 190 m2, 3 primary classes with an area of 190 m2; accommodation for teachers with an area of 130 m2 and 02 community cultural houses with an area of 160 m2
|
Transportation
New road, 4.0 km long from Tan Xuan commune center to a junction of Cay Da, rural class A;
New road, 2.0 km long, from a junction of Pom Hien to Tham Ton 2, rural class B;
New road, 2.0 km long, from a junction of Pom Hien to Tham Ton 1, rural class B;
New road, 6.0 km long to support for farming, rural class B;
One bridge to connect Tay Ta Lao to Center of Tan Xuan commune and one wharf to connect with farming sites in Ban Cam.
|
Electricity
To Pom Hien- Suoi Non site: transmission line of 35 kV with 4.5 km and 1 km of 0.4 kV from center of Xuan Nha commune to the relocation site and a transformer 50 KVA.
To Tham Ton 1 site: transmission line of 35 kV with 2 km and02 km of 0.4 kV and a transformer 100 KVA.
To Tham Ton 2 site: transmission line of 35 kV with 0.5 km and 0.5 km of 0.4 kV and a transformer 35 KVA
|
Water supply for domestic and other purposes
Water supply for domestic and other purposes: construct a weir on the Co Nao creek and 10 km pipe to supply water to area of rice with one crop per year and 4 km of pipe for domestic use
|
Paddy field opening
None
|
Table A 25: Water Supply in the Four Planned Resettlement Sites
Resettlement site
|
Name of water source
|
Discharge
|
Distance to resettlement site
|
Heigh difference / reset-tlement site
|
Number of households to be supplied
|
Type of water supply
|
Resettlement site No.1
|
Keo đắm-Keo đau-Pom chon
|
Cáp stream
|
9 (l/s)
|
6.6 Km
|
142 m
|
136
|
Gravity - individual
|
Tà pục
|
Tà Pục stream
|
4 (l/s)
|
1.1 Km
|
49 m
|
51
|
Gravity - individual
|
Xước
|
Xước stream
|
1.1 (l/s)
|
0.3 Km
|
53 m
|
34
|
Gravity - individual
|
Resettlement site No.2
|
Tài chánh
|
Tài Chánh stream
|
9 (l/s)
|
2.5 Km
|
98 m
|
37
|
Gravity -individual
|
Nàng
|
Nang village
|
4 (l/s)
|
3.8 Km
|
53 m
|
57
|
Gravity - individual
|
Resettlement Site No.3
|
Lìn
|
Lin village
|
8 (l/s)
|
1.1 Km
|
54 m
|
20
|
Gravity - individual
|
Chiềng subvillage
|
Mó nước
Tà Buông
|
1 (l/s)
|
0.4 Km
|
40 m
|
17
|
Gravity -individual
|
Resettlement site No.4
|
Tham Ton
|
Mó nước Co Nào 1
|
0.7 l/s (60m3/ day & night)
|
0,5 Km
|
3m
|
54
|
Gravity system - public tank
|
Mó nước Co Nào 3
|
0.15 l/s (12m3/ day & night)
|
1 Km
|
15
|
Tham Ton 2
|
Mó nước Co Nào 2
|
0.6 l/s (50m3/ day & night)
|
1 Km
|
24m
|
31
|
Gravity – individual
|
Pom Hiến –
Suối Nón
|
|
|
|
|
|
|
Pom Hiến - Suối Nón (agglomeration 1)
|
Mó nước Pom Hiến
|
1 l/s (80m3/day & night)
|
3 Km
|
120 m
|
60
|
Gravity - individual
|
Tà Lót water source
|
0,3 l/s (26m3/ day & night)
|
1.5 Km
|
150 m
|
Pom Hiến - Suối Nón water source (agglomeration 2)
|
Pươi stream
|
0,8 l/s (70 m3/ day & night)
|
1.5 Km
|
100 m
|
40 relocated hh and 20 hosting hh
|
Gravity - individual
|
Source: water supply survey in resettlement sites (baseline design).
Based on 80 l/person/24 hours, which is higher than the Construction standard of Vietnam TCXDVN 33: 2006: water supply - pipe line network and work, 60 l/person/24 hours.