Table A 37: Local Construction Costs in Project Area
Materials and labor
|
Cost at supply site (VND)
|
Cost at village site
|
Dimension
|
Quantity
|
Thanh Hoa
|
|
|
|
|
Wooden materials
|
|
|
|
|
Sub-pillars
|
120,000
|
150,000
|
5.4mx20cmx20cm
|
28 to 32
|
Main pillars
|
60,000
|
80,000
|
1.3mx20cmx20cm
|
8
|
Semi-pillars
|
40,000
|
60,000
|
1mx14cmx14cm
|
8
|
Main beams
|
140,000
|
160,000
|
6mx20cmx20cm
|
4
|
Sub beams
|
80,000
|
100,000
|
3.5mx20cmx20cm
|
4
|
“That” beam
|
50,000
|
70,000
|
3mx8cmx18cm
|
100
|
“Don Tay” beam
|
6,000
|
10,000
|
9mx14cmx14cm
|
100
|
“Rui” beam
|
4,000
|
8,000
|
7mx3cmx5cm
|
130
|
Semi-beam 33
|
3,000
|
5,000
|
9mx3cmx3cm
|
150
|
“Don Noc” beam
|
90,000
|
100,000
|
9mx5cmx20cm
|
1
|
“Van Thung” beam
|
35,000
|
40,000
|
35cmx220cmx2.5cm
|
200
|
Wooden floor
|
90,000
|
100,000
|
7mx40cmx3cm
|
33
|
Door, window frames
|
5,000
|
7,000
|
2mx7cmx3.5cm
|
28
|
Tile
|
5,000
|
8,000
|
|
2,500
|
Costs of construction materials in Co Luong village
|
Material
|
Unit
|
Cost (VND)
|
Cost of transportation (VND)
|
Note
|
Bim Son ciment
|
100 kg
|
115,000
|
1,500,000
|
By 5 tons truck
|
|
|
|
1,500,000
|
By boat 1.5 tons
|
Brick
|
brick
|
800
|
1,500,000
|
By boat with 2.500 brick
|
Iron 6-8
|
Kg
|
14,000
|
|
|
+ Diameter 10 mm
|
piece
|
110,000
|
|
|
+Diameter 12 mm
|
piece
|
140,000
|
|
|
Iron corrugated roofing
|
piece
|
75,000
|
|
|
Sand
|
m3
|
70,000
|
|
|
Costs of construction materials in Co Luong village
|
Ciment
|
100 kg
|
1,400,000
|
|
Transported to the village by boat, local truck ”cong nong”
|
Brick
|
Brick
|
1,600
|
|
Iron corrugated roofing
|
Piece
|
35,000
|
|
Iron
|
Tone
|
21,000,000
|
|
Sand
|
m3
|
80,000
|
|
Unit costs for constructing local houses with cement and brick by contractors
|
House type 4
|
m2
|
1,750,000
|
|
|
|
m2
|
2,800,000
|
|
|
House type 3
|
m2
|
3,500,000
|
|
|
Unit costs for constructing local house with wooden materials by contractors
|
House on the tilts and with wooden floor
|
m2
|
1,200,000
|
|
In Tam Chung
|
Without wooden floor (earth floor)
|
m2
|
1,000,000
|
|
In Tam Chung
|
House on the tilts
|
m2
|
1,300,000
|
|
In Trung Ly
|
House type 4
|
m2
|
1,900,000
|
|
In Trung Ly
|
Wooden house
|
m2
|
1,000,000
|
|
In Trung Ly
|
House on the tilts
|
m2
|
1,200,000
|
|
In Muong Ly
|
Wooden house
|
m2
|
1,000,000
|
|
In Muong Ly
|
House on the tilts
|
m2
|
1,500,000
|
|
Ta Ban
|
Wooden house
|
m2
|
1,100,000
|
|
Ta Ban
|
House on the tilts
|
m2
|
1,250,000
|
|
Co Me
|
Wooden house
|
m2
|
1,000,000
|
|
Co Me
|
Labor cost
|
day
|
30,000
|
|
Meals supplied by the house owner
|
Moc Chau District (Materials required for house)
|
Sub-pillars
|
200,000
|
|
5m
|
18
|
Main pillars
|
300,000
|
|
1mx50cmx6m
|
11
|
Semi-pillars
|
60,000
|
|
1.5mx40x40
|
14
|
”keo”
|
175,000
|
|
6.2m
|
13
|
Beams
|
60,000
|
|
3m
|
140
|
”Quai giang”
|
160,000
|
|
4m
|
5
|
”Hoan”
|
60,000
|
|
6m
|
120
|
Wodden wall
|
15,000
|
|
2m
|
200
|
Wooden floor
|
80,000
|
|
3.2m
|
90
|
Roofing
|
|
35,000
|
|
200 pieces
|
Chân cột (XM)
|
140,000
|
|
|
200 kg
|
Nail
|
40,000
|
|
|
30 kg
|
Cost of materials (VND)
|
Cement
|
112,000
|
140,000
|
|
Transportation to Xuan Nha
|
Iron
|
|
150,000
|
|
Unit costs for constructing local houses with cement and brick by contractors
|
|
House on the tilts
|
|
|
9m x 7m
|
In Xuan Nha
|
Wooden house
|
m2
|
750,000
|
|
In Xuan Nha
|
Wooden house on the tilts and with wooden floor
|
m2
|
1,300,000
|
|
In Tan Xuan
|
Wooden house
|
m2
|
800,000
|
|
In Tan Xuan
|
Table A 38: Market Prices for Trees and Crops in Project Area (VND)
Tree
|
Cost at planting site
|
Cost along Ma River sites
|
Cost at Co Luong
|
Small ”luong”
|
2,000
|
3,000
|
5,000
|
Medium size ”luong”
|
3,000
|
4,000
|
7,000
|
Tall ”luong”
|
5,000
|
7,000
|
9,000
|
Cassava
|
|
350
|
|
Maize
|
|
1,400
|
|
Rice
|
|
4,000
|
|
Chinese tree
|
|
50,000
|
|