Computational of Temperature and Stresses for Mujib Dam


Analysis  Considering  Actual  RCC  Placement  and  Comparison  with  in-situ



tải về 0.89 Mb.
Chế độ xem pdf
trang13/18
Chuyển đổi dữ liệu27.02.2022
Kích0.89 Mb.
#51056
1   ...   10   11   12   13   14   15   16   17   18
Journal HP 2004 Malakwi

Analysis  Considering  Actual  RCC  Placement  and  Comparison  with  in-situ 

Measurements 

 

In order to have a real case for analysis, the 2D numerical model was used to 



simulate the actual construction process of the dam. The mesh represents the body of 

the dam during construction time (from 143 m to 181.5 m) plus the foundation. The 

dam actually is formed by 153 RCC lifts 0.3 m thick, the last lift is 0.4 m. The fiber 

optic  cables  shown  in  Figure  2  were  installed  in  Mujib  dam  to  monitor  the 

temperature  distribution  in  dam  body.  Figure  21  shows  the  actual  average  daily 

temperature in Mujib site. 

Figure  22  shows  the  placement  of  RCC  schedule  with  time  for  Mujib  Dam 

including the time of installation of fiber optic cables and break period between RCC 

layers. The placement temperature was used as it was recorded for each layer at time 

of  placement  at  the  site.  Other  parameters  for  analysis  including  the  coefficient  of 

thermal expansion, specific heat, heat of hydration, are taken from Tables 1 and 2. 