steel cargo guide

8.3 Condition of cargo upon arrival onboard the vessel
8.3.1 The condition of the cargo, when presented for loading onboard the vessel, should be thoroughly
inspected and documented contemporaneously. Steel cargoes frequently exhibit some rusting or
physical damage and it is strongly recommended that a pre-load survey is performed on the cargo
prior to its being loaded onboard in order to establish the actual loaded condition of the cargo and
protect against any potential cargo claims brought by cargo interests against vessel interests.
8.3.2 It is recommended that the following steps should be taken by the vessel’s officers and crew before
the cargo is loaded onboard:
(1)
conduct a pre-shipment inspection of the cargo prior to and after loading to check for any
pre-shipment damages;
(2)
make a note of the location and type of storage area provided for the cargo, and the
weather conditions to which the cargo has been subjected while in storage;
(3)
make note of the cargo packaging and packaging defects, if any;
(4)
if the cargo is loaded in very low temperatures and to be shipped to warmer climates, the
Master should make a note of this point and of the ambient temperatures during loading
(see Section 6.9.1(1)). It is, in any case, prudent to record ambient temperatures during loading;


American Club: Transport Guidance for Steel Cargoes
79
(5)
note any atmospheric corrosion observed on the cargo;
(6)
continuously monitor the loading of cargo;
(7)
ensure that any remarks regarding physical condition, quantity, type and/or misdescription
of the steel cargo is properly reflected on any Mate’s Receipts and/or bills of lading;
(8)
in advance of their arrival, ascertain precisely which persons/third parties, such as
surveyors, supercargo, etc., will be attending the vessel during loading operations and
that appropriate protocols regarding their attendances be agreed to ensure safety and
security of the vessel; and
(9)
continuously monitor the pre-load survey.

tải về 1.97 Mb.

Chia sẻ với bạn bè của bạn:
1   ...   40   41   42   43   44   45   46   47   ...   57




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương