Lines built over the period from 2016 to 2020

 

Northern area

 

 

 

1584

 

1

Mai Dong – Tay Ho

2

x

15

30

Underground cable

2

Trung Son HPS - splitting pointed Hoa Binh – Nho Quan

2

x

77

154

 

3

Me Linh – splitting point Soc Son – Van Tri

2

x

5

10

 

4

Dong Anh - Dong Anh 2

2

x

20

40

 

5

Connection - Dong Anh 500kV substation

4

x

5

20

 

6

Vinh Tuong – splitting point Viet Tri - Son Tay

2

x

3

6

 

7

Tay Ha Noi – Me Linh

2

x

40

80

 

8

Replacing with thermotolerant cable – Ha Dong - Chem

2

x

20

40

Connected to Tay Ha Noi 500kV Substation

9

Van Dien – splitting point Thuong Tin – Ha Dong

2

x

6

12

 

10

Chuong My – splitting point Hoa Binh – Ha Dong

2

x

5

10

 

11

Ung Hoa – splitting point Ha Dong – Phu Ly

2

x

5

10

 

12

Ung Hoa – Phu Ly - Nho Quan

1

x

65

65

For circuit 2 (Upgrading existing lines to double circuit. shall be considered)

13

Hai Ha – Cam Pha

2

x

85

170

For circuit 2

14

An Lao - Hai Phong 500kV substation

2

x

5

10

 

15

Connection to Hai Phong 500kV substation

4

x

2

8

 

16

Tam Hung – Bac Song Gam

2

x

12

24

 

17

Gia Loc – splitting point Hai Duong TPP – Pho Noi

2

x

5

10

 

18

Lines Connected to  Hai Duong 3 switching substation

6

x

4

24

03 double-circuit lines

19

Pho Cao – splitting point Kim Dong - Thai Binh

2

x

8

16

 

20

Yen My - splitting point Thuong Tin – Pho Noi

2

x

7

14

 

21

Nho Quan – Thanh Nghi

2

x

25

50

 

22

Ly Nhan – Thanh Nghi

2

x

23

46

 

23

Thai Binh – Nam Dinh

1

x

25

25

For Circuit 2

24

Nam Dinh - Ninh Binh

1

x

31

31

Double-circuit line shall be considered

25

Hua Na HPS - splitting point Thanh Hoa – Bim Son

2

x

70

140

 

26

Thai Binh – Thai Binh 500/220kV line

2

x

15

30

 

27

Vu Thu – splitting point Thai Binh – Truc Ninh

2

x

5

10

 

28

Splitting point – Quynh Phu

2

x

5

10

 

29

Ninh Binh – Thanh Hoa

1

x

62

62

For circuit 2 (Upgrading existing lines to double circuit. shall be considered)

30

Bac Me HPS – splitting point Ha Giang - Tuyen Quang HPS

2

x

5

10

 

31

Cao Bang – Lang Son

1

x

100

100

 

32

Phu Binh – splitting point Bac Giang – Thai Nguyen

2

x

5

10

 

33

Viet Tri 500kV substation – Ba Thien

2

x

38

76

 

34

Bac Giang – Pha Lai

1

x

27

27

For circuit 2 (Upgrading existing lines to double circuit. shall be considered)

35

Bac Ninh – Bac Ninh 500kV substation

2

x

10

20

 

36

Bac Ninh 500kV substation – splitting point Pho Noi – Tien Son

4

x

5

20

 

37

Thua– splitting point Pho Noi – Tien Son

2

x

4

8

 

38

Lach Huyen Steel – Yen Hung

2

x

18

36

 

39

Ngoc Lac – splitting point Hua Na – Thanh Hoa

2

x

30

60

 

40

Nong Cong – Thanh Hoa

2

x

25

50

 

41

Splitting point Nam Cam substation

2

x

5

10

 

 

Central area

 

 

 

1546

 

1

Dong Ha – Lao Bao

2

x

52

104

 

2

Connecting 220kV line to Thua Thien Hue 500kV substation

4

x

5

20

 

3

Ha Se San 2 - splitting point Se San 4 – Pleiku

2

x

190

380

 

4

Cau Hai– splitting point Hue – Hoa Khanh

4

x

5

20

 

5

Splitting point – Lien Chieu

4

x

6

24

 

6

District 3 - An Don

2

x

6

12

Underground cable shall be considered

7

District 3 – Hoi An

2

x

15

30

 

8

Splitting point Hoai Nhon – Hoai Nhon

4

x

5

20

Using 4-circuit towers

9

Quang Ngai - Doc Soi 500kV substation

2

x

29

58

For circuit 2

10

Quang Ngai – An Nhon

2

x

143

286

For circuit 2

11

Splitting point Song Cau – Song Cau

6

x

5

30

 

12

An Khe – An Nhon

1

x

146

146

For circuit 2

13

An Nhon – Tuy Hoa

2

x

98

196

 

14

Splitting point Khanh Hoa – Khanh Hoa

4

x

5

20

Using 4-circuit towers

15

Establishing connections to HPSs in Southern Laos and Cambodia

2

x

100

200

 

 

Southern area

 

 

 

2175

 

1

Ninh Phuoc – splitting point Vinh Tan – Thap Cham

4

x

2

8

 

2

Phan Ri – splitting point Vinh Tan – Phan Thiet

4

x

2

8

 

3

Splitting point Tan Duc

2

x

5

10

 

4

Splitting point Dat Do

4

x

2

8

 

5

Phu My - Phu My 2 industrial zone

2

x

20

40

Phu My – Ba Ria 110 kV line shall be considered to be used

6

Splitting point Phu My 3 industrial zone

4

x

3

12

 

7

Dong Nai 500kV substation – splitting point Chau Duc - Phu My 2 industrial zone

4

x

20

80

 

8

Thu Thiem – splitting point Cat Lai – Tan Cang

4

x

3

12

220kV underground cable

9

Phu Lam – Dam Sen

3

x

6

18

220kV underground cable

10

Tan Son Nhat - Hiep Binh Phuoc

2

x

8

16

220kV underground cable

11

Hiep Binh Phuoc – Tan Uyen 500kV Substation

2

x

14

28

Using 4-circuit towers. 2 circuits shall be hung first

12

District 9 – splitting point Tan Uyen – Thu Duc

4

x

2

8

Using 4-circuit towers

13

South Hiep Phuoc - splitting point Thu Duc – Hoc Mon

4

x

2

8

Using 4-circuit towers

14

Long Thanh 500kv substation – splitting point Cat Lai – Thu Duc

4

x

17

68

Using 4-circuit towers

15

Nhon Trach TPP - Nhon Trach city

2

x

12

24

 

16

Long Thanh Industrial Zone - Dong Nai 500kV substation – Long Thanh

4

x

2

8

Using 4-circuit towers

17

Tam Phuoc – Long Thanh 500kV substation – Long Binh

4

x

2

8

 

18

An – brance Long Thanh 500kV substation – Long Thanh

4

x

2

8

 

19

Tan Dinh 500kV substation – splitting point Binh Hoa – Thuan An

2

x

11

22

 

20

Splitting point Tay Bac Cu Chi

2

x

3

6

 

21

Splitting point Phu Hoa Dong

2

x

3

6

 

22

Cau Bong 500kV substation – Binh Chanh 1

2

x

13

26

 

23

Binh Duong 1 500kV substation – splitting point Tan Dinh - Uyen Hung

4

x

2

8

 

24

Tan Uyen – splitting poit Binh Duong 1 500kV substation – My Phuoc

4

x

3

12

 

25

My Phuoc 500kV substation – splitting point My Phuoc – Binh Long

4

x

2

8

 

26

My Phuoc 500kV substation – Ben Cat

2

x

3

6

 

27

Lai Uyen – splitting point My Phuoc – Binh Long

4

x

3

12

 

28

Phuoc Long – splitting point Binh Long - Dak Nong

4

x

2

8

 

29

Tay Ninh 2 – splitting point Trang Bang – Tay Ninh

4

x

2

8

 

30

Sam Bo HPS – Tan Bien

2

x

170

340

 

31

Tan Bien – splitting point Tay Ninh 2 – KamPongCham

4

x

150

600

 

32

Sa Dec Industrial Zone – O Mon

2

x

28

56

Replace with big cable

33

Tan An – splitting point Can Duoc– My Tho

4

x

5

20

 

34

Go Cong – Can Duoc

2

x

22

44

 

35

Vinh Long 3 – splitting point Tra Vinh – Vinh Long 2

4

x

3

12

 

36

Lap Vo – Thot Not

2

x

12

24

 

37

Chau Thanh – splitting point Long Xuyen 2 – Chau Doc

4

x

2

8

 

38

My Tu – splitting point Phung Hiep – Soc Trang

2

x

12

24

 

39

Gia Rai – splitting point Bac Lieu 2 – Ca Mau

4

x

2

8

 

40

Ngoc Hien – Ca Mau

2

x

55

110

 

41

Cai Nuoc – Ca Mau

2

x

45

90

 

42

Go Quao – splitting point Ca Mau – Rach Gia

2

x

6

12

 

43

Vi Thanh – splitting point Ca Mau – Bac Lieu 2

2

x

8

16

 

44

Kien Luong TPP – Kien Binh 2

2

x

10

20

Connected to Kien Luong TPP

45

Kien Luong TPP – Chau Doc

3

x

99

297

Connect to Kien Luong TPP (using 4-circuit tower at the beginning part)


tải về 2.28 Mb.

Chia sẻ với bạn bè của bạn:
1   ...   9   10   11   12   13   14   15   16   ...   19




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương