1
|
Dong Hoi – Dong Ha
|
2
|
x
|
108
|
216
|
Upgrade to double-circuit. Existing lines shall be considered to be used
|
2
|
Dong Ha - Hue
|
2
|
x
|
68
|
136
|
Ugrade to double-circuit. Existing lines shall be considered to be used
|
3
|
A Luoi HPS – splitting point Dong Ha - Hue
|
2
|
x
|
28
|
56
|
Connected to A Luoi HPS
|
4
|
Phong Dien – splitting point Hue – Hoa Khanh
|
4
|
x
|
5
|
20
|
|
5
|
Chan May – splitting point Hue – Hoa Khanh
|
4
|
x
|
8
|
32
|
Using 4-circuit towers
|
6
|
Hue - Hoa Khanh
|
2
|
x
|
110
|
220
|
Build new line of split-phase double circuit or upgrade existing line to double circuit line
|
7
|
SeKaman 3 - Thanh My
|
2
|
x
|
120
|
240
|
|
8
|
Splitting point derive from District 3 substation (Ngu Hanh Son)
|
2
|
x
|
12
|
24
|
|
9
|
Doc Soi – Quang Ngai
|
2
|
x
|
60
|
120
|
Hang circuit 1
|
10
|
Tam Hiep – Doc Soi 500kv substation
|
2
|
x
|
20
|
40
|
|
11
|
Son Ha - Doc Soi 500kV substation
|
2
|
x
|
50
|
100
|
|
12
|
Quang Ngai – Quy Nhon
|
2
|
x
|
143
|
286
|
|
13
|
Establishing connections to Song Bung 2 HPS and Song Bung 4 HPS
|
2
|
x
|
20
|
40
|
|
14
|
Dak My 1 – Dak My 4
|
2
|
x
|
15
|
30
|
|
15
|
Dak My 4 – Thanh My 500kV substation
|
2
|
x
|
50
|
100
|
|
16
|
Establishing connection between the group of HPSs in Se San and 220kV substation of Se San 4 HPS
|
2
|
x
|
33
|
66
|
Connected to Ha Se San 2 HPS, Se San 1 HPS
|
17
|
Buon Kuop – Dak Nong
|
1
|
x
|
85
|
85
|
|
18
|
PleiKu – Kon Tum
|
2
|
x
|
30
|
60
|
Under construction
|
19
|
Thuong Kon Tum – Quang Ngai
|
2
|
x
|
76
|
152
|
|
20
|
An Khe – An Nhon
|
2
|
x
|
30
|
60
|
For circuit 2
|
21
|
Establishing 220kv connection to Van Phong TPP – Ninh Hoa switching substation
|
2
|
x
|
20
|
40
|
Using big cable
|
22
|
Splitting point Ninh Hoa switching substation - Ninh Hoa switching substation
|
4
|
x
|
6
|
24
|
Using 4-circuit towers
|
23
|
Splitting point An Nhon
|
2
|
x
|
6
|
12
|
|
24
|
Tuy Hoa – Nha Trang
|
2
|
x
|
147
|
294
|
For circuit 2
|
25
|
Nha Trang - Cam Ranh
|
2
|
x
|
60
|
120
|
|
26
|
Krong Buk - Nha Trang
|
1
|
x
|
147
|
147
|
Circuit 2 started building in quarter III/2010
|
27
|
Splitting point Van Phong
|
2
|
x
|
2
|
4
|
|
28
|
Pleiku - Krong Buk
|
1
|
x
|
143
|
143
|
Replace with big cable
|
|
Southern area
|
|
|
|
3906
|
|
1
|
Cam Ranh – Thap Cham
|
2
|
x
|
45
|
90
|
|
2
|
Thap Cham – Vinh Tan
|
2
|
x
|
44
|
88
|
Connected to Vinh Tan TPP
|
3
|
Thap Cham – Da Nhim
|
1
|
x
|
40
|
40
|
|
4
|
Vinh Tan – Phan Thiet
|
2
|
x
|
100
|
200
|
Connected to Vinh Tan TPP
|
5
|
Phan Thiet - Ham Tan
|
2
|
x
|
63
|
126
|
Connected to Vinh Tan TPP
|
6
|
Ham Tan – Chau Duc
|
2
|
x
|
62
|
124
|
Connected to Vinh Tan TPP
|
7
|
Chau Duc - Phu My 2 industrial zone
|
2
|
x
|
21
|
42
|
Connected to Vinh Tan TPP
|
8
|
Splitting point - Phu My 2 industrial zone
|
2
|
x
|
14
|
28
|
|
9
|
Ba Ria – Vung Tau
|
2
|
x
|
14
|
28
|
|
10
|
Binh Long - Tay Ninh 2
|
2
|
x
|
64
|
128
|
|
11
|
Dong Nai 2 – Di Linh
|
2
|
x
|
15
|
30
|
Connected to Dong Nai 2 HPS
|
12
|
Di Linh – Da Nhim
|
1
|
x
|
80
|
80
|
For circuit 2
|
13
|
Di Linh – Tan Rai
|
2
|
x
|
10
|
20
|
Connected to Aluminum processing
|
14
|
Song May – Uyen Hung
|
2
|
x
|
21
|
42
|
|
15
|
Uyen Hung - Tan Dinh
|
2
|
x
|
18
|
36
|
|
16
|
Song May - Bao Loc
|
1
|
x
|
124
|
124
|
For circuit 2 (Upgrading existing lines to double circuit. shall be considered)
|
17
|
Di Linh – Bao Loc
|
1
|
x
|
37
|
37
|
For circuit 2 (Upgrading existing lines to double circuit. shall be considered)
|
18
|
Ham Thuan – Bao Loc
|
1
|
x
|
39
|
39
|
For circuit 2
|
19
|
Duc Trong – splitting point Da Nhim – Di Linh
|
2
|
x
|
2
|
4
|
|
20
|
Splitting point Xuan Loc
|
4
|
x
|
5
|
20
|
Using 4-circuit towers
|
21
|
Splitting point Hiep Binh Phuoc
|
2
|
x
|
2
|
4
|
|
22
|
Splitting point Nam Sai Gon
|
4
|
x
|
3
|
12
|
Using 4-circuit towers
|
23
|
Splitting point Binh Tan
|
4
|
x
|
3
|
12
|
Using 4-circuit towers
|
24
|
Splitting point Thuan An
|
4
|
x
|
3
|
12
|
Using 4-circuit towers
|
25
|
Song May – splitting point Tri An – Long Binh
|
2
|
x
|
5
|
10
|
|
26
|
Song May – splitting point Bao Loc – Long Binh
|
4
|
x
|
10
|
40
|
Using 4-circuit towers
|
27
|
Splitting point Song May – Long Binh
|
2
|
x
|
15
|
30
|
Upgrade 2 circuits
|
28
|
Splitting point – My Xuan
|
4
|
x
|
2
|
8
|
Using 4-circuit towers
|
29
|
Splitting point Phu My - Ba Ria - Phu My 2 industrial zone
|
4
|
x
|
2
|
8
|
Using 4-circuit towers
|
30
|
Thu Duc Bac – splitting point Thu Duc – Long Binh
|
4
|
x
|
3
|
12
|
Using 4-circuit towers
|
31
|
Tan Uyen 500kV substation - splitting point Thu Duc Bac – Thu Duc
|
4
|
x
|
8
|
32
|
Using 4-circuit towers
|
32
|
Tan Uyen 500kV substation - Uyen Hung
|
2
|
x
|
15
|
30
|
|
33
|
Dak Nong – Phuoc Long – Binh Long
|
2
|
x
|
130
|
260
|
|
34
|
Ben Cat – splitting point My Phuoc – Binh Long
|
2
|
x
|
11
|
22
|
|
35
|
Cu Chi – splitting point Tan Dinh – Trang Bang
|
4
|
x
|
3
|
12
|
Using 4-circuit towers
|
36
|
Cau Bong 500kV substation – Hoc Mon
|
6
|
x
|
16
|
96
|
Using 6-circuit towers, with 2 110kv circuits
|
37
|
Cau Bong 500kV substation – Cu Chi
|
6
|
x
|
22
|
132
|
Using 6-circuit towers, with 2 110kv circuits
|
38
|
Establishing connection between Vinh Loc to 2 circuits Cau Bong – Hoc Mon
|
2
|
x
|
5
|
10
|
|
39
|
Splitting point Vinh Loc – Phu Lam – Binh Tan
|
4
|
x
|
3
|
12
|
Using 4-circuit towers
|
40
|
Nha Be – Phu Lam
|
2
|
x
|
15
|
30
|
Replace with big cable
|
41
|
Phu Lam – Hoc Mon
|
2
|
x
|
19
|
38
|
Replace with big cable
|
42
|
Cat Lai – Thu Duc
|
2
|
x
|
9
|
18
|
Replace with big cable
|
43
|
Tan Cang – Cat Lai
|
2
|
x
|
12
|
24
|
Install underground 220kV line with 3 circuits
|
44
|
Nam Sai Gon – District 8
|
2
|
x
|
6
|
12
|
Install underground 220kV line
|
45
|
Duc Hoa 500kV substation – Duc Hoa 1
|
4
|
x
|
22
|
88
|
Using 4-circuit towers
|
46
|
Duc Hoa 1 - Cu Chi
|
4
|
x
|
8
|
32
|
Using 4-circuit towers
|
47
|
Duc Hoa 500kV substation – splitting point Phu Lam – Long An
|
2
|
x
|
20
|
40
|
|
48
|
Nhon Trach TPP - Nhon Trach city
|
2
|
x
|
12
|
24
|
|
49
|
Trang Bang - Tay Ninh
|
2
|
x
|
44
|
88
|
|
50
|
Tay Ninh – KamPong Cham
|
2
|
x
|
116
|
232
|
For Cambodia
|
51
|
Ben Luc – splitting point Phu Lam – Long An
|
2
|
x
|
5
|
10
|
|
52
|
Can Duoc - Splitting point Phu My – My Tho
|
4
|
x
|
7
|
28
|
Using 4-circuit towers
|
53
|
My Tho 500kV substation – splitting point – Cai Lay
|
4
|
x
|
2
|
8
|
|
54
|
My Tho 500kV substation – splitting point My Tho – Cai Lay
|
4
|
x
|
2
|
8
|
|
55
|
Duyen Hai TPP – Mo Cay
|
2
|
x
|
77
|
154
|
Connected to Duyen Hai TPP
|
56
|
Mo Cay – Ben Tre
|
2
|
x
|
20
|
40
|
Connected to Duyen Hai TPP
|
57
|
My Tho – Ben Tre
|
1
|
x
|
18
|
18
|
Under construction
|
58
|
Duyen Hai TPP – Tra Vinh
|
2
|
x
|
45
|
90
|
Connected to Duyen Hai TPP
|
59
|
Vinh Long – Tra Vinh
|
2
|
x
|
62
|
124
|
Connected to Duyen Hai TPP
|
60
|
Sa Dec Industrial Zone – splitting point Vinh Long 2 – O Mon
|
2
|
x
|
5
|
10
|
|
61
|
Cao Lanh – Cai Lay
|
1
|
x
|
54
|
54
|
Double-circuit line shall be considered
|
62
|
Cao LAnh – Thot Not
|
1
|
x
|
27
|
27
|
Double-circuit line shall be considered
|
63
|
Long Phu TPP – Soc Trang
|
4
|
x
|
25
|
100
|
Connected to Long Phu TPP
|
64
|
Long Phu TPP – Can Tho – Tra Noc
|
2
|
x
|
95
|
190
|
Connected to Long Phu TPP
|
65
|
Phung Hiep – splitting point O Mon – Soc Trang
|
4
|
x
|
6
|
24
|
|
66
|
Long Xuyen 2 – splitting point Chau Doc – Thot Not
|
4
|
x
|
5
|
20
|
|
67
|
Ca Mau TPP – Ca Mau
|
1
|
x
|
5
|
5
|
Circuit 2
|
68
|
Phu Lam – Cai Lay
|
2
|
x
|
70
|
140
|
Replace with big cable
|
69
|
Phu My - Long Thanh
|
2
|
x
|
25
|
50
|
Replace with big cable
|
70
|
Long Thanh – Long Binh
|
4
|
x
|
25
|
100
|
Replace with big cable
|
|
|