No.
|
Name of pipeline
|
Operation commencement period
|
Expected capacity (billion m3/year)
|
Length (km)
|
Diameter (inch)
|
I
|
Main offshore gas pipeline system
|
|
|
|
|
1
|
Pipeline for gathering of gases from other potential gas fields at Block 102/106 & 103/107 to Tien Hai’s shore
|
2030 - 2035
|
2
|
80 - 100
|
10 - 16
|
II
|
Gas gathering pipelines
|
|
|
|
|
1
|
Pipelines for gathering of gases produced from potential gas fields such as Hong Long, Hac Long, Bach Long, Dia Long, etc. at Blocks 102/106&103/107
|
2030 - 2035
|
0.2 – 0.5
|
70 - 80
|
8 - 10
|
2
|
Pipeline for gathering of gases from potential gas fields at Blocks 102/106 & 103/107 linked with Ham Rong, Thai Binh gas gathering pipelines
|
2032 - 2035
|
0.2 – 0.5
|
40 - 50
|
8 - 10
|
III
|
Onshore high-pressure gas pipeline system
|
|
|
|
|
1
|
High-pressure pipeline system for transportation of gases produced by potential gas wells at Blocks/ gas fields in the Red River basin area from LFS Tien Hai to Thai Binh area
|
2032
|
1.5 - 2
|
6
|
16
|
2
|
Pipeline system for transmission of gases from Northern region’s LNG storage unit to Northern region’s power plants
|
2025 - 2030
|
2
|
15 - 20
|
20
|
IV
|
Low-pressure gas distribution pipeline and CNG manufacturing system
|
|
|
|
|
1
|
Pipeline system for distribution of low-pressure gases to Tien Hai area (3rd stage)
|
2026 - 2035
|
0.25
|
30 - 50
|
6 - 10
|
2
|
CNG manufacturing system at Tien Hai (3rd stage)
|
2026 - 2035
|
0.25
|
|
|
No.
|
Project
|
Operation commencement period
|
Expected capacity (billion m3/year)
|
Length (km)
|
Diameter (inch)
|
I
|
Main offshore high-pressure gas pipeline system
|
|
|
|
|
1
|
Pipeline for gas transmission from Ca Voi Xanh gas field to Quang Nam province
|
2023 - 2025
|
9 - 11
|
80 - 100
|
32 - 36
|
2
|
Pipeline system for transmission of gases from Bao Vang gas field to Quang Tri province
|
2023 - 2025
|
2 - 3
|
120
|
16
|
II
|
Onshore gas pipeline system
|
|
|
|
|
1
|
High-pressure gas pipeline from GTP at Tam Quang to Quang Nam, Quang Ngai power plant and the petrochemical complex located at Dung Quat Economic Zone
|
2023 - 2025
|
8
|
25
|
26
|
2
|
Pipeline system from gas distribution center (GDC) in Tam Quang to industrial parks (IP) in Quang Nam province
|
2023 - 2025
|
0,6 - 0,9
|
10 - 15
|
8 - 10
|
3
|
Pipeline system from the gas distribution station (GDS) in Dung Quat to Dung Quat industrial park
|
2023 - 2025
|
0.7
|
10 - 15
|
8 - 10
|
III
|
Low-pressure gas distribution pipeline system
|
|
|
|
|
1
|
Low-pressure gas distribution pipeline system
|
2023 - 2025
|
0.3
|
|
|
IV
|
Gas treatment plant
|
|
|
|
|
1
|
Gas treatment plant (GTP) in Quang Nam province
|
2023 - 2025
|
9 - 11
|
|
|
V
|
CNG and petrochemical plant/station
|
|
|
|
|
1
|
CNG/LNG plant in the Central region
|
2023 - 2025
|
0.20 – 0.25
|
|
|
No.
|
Name of pipeline
|
Operation commencement period
|
Expected capacity (billion m3/year)
|
Length (km)
|
Diameter (inch)
|
I
|
Main offshore high-pressure gas pipeline system
|
|
|
|
|
1
|
Nam Con Son 2 gas pipeline system – 2nd stage – from KP 207 - LFS
|
2019
|
7
|
117
|
26
|
2
|
Nam Con Son 2 gas pipeline system – 2nd stage – from KP 207 - LFS
|
2019 - 2025
|
7
|
50 - 60
|
26
|
II
|
Gas gathering pipelines
|
|
|
|
|
1
|
Gas transmission pipeline for gathering of gases from Su Tu Trang gas field to Nam Con Son 2
|
2019 - 2020
|
2 - 4
|
75 - 125
|
16 - 20
|
2
|
King Ngu – Rang Dong gas field gathering pipeline system
|
2017
|
0.35
|
18
|
12
|
3
|
Increase in compression capacity at Bach Ho
|
2018 - 2019
|
0.6 – 1.2
|
-
|
-
|
4
|
Ca Rong Do – Nam Con Son 1 gas field gathering pipeline
|
2018 - 2019
|
2.4
|
83 - 157
|
16
|
5
|
Pipeline for gathering of gases from Cobia gas field linked to Ca Rong Do – Lan Tay pipeline
|
2020 - 2025
|
1
|
5
|
16
|
6
|
Pipeline for gathering of gases from Ca Kiem Den gas field linked to Ca Rong Do – Lan Tay pipeline
|
2020 - 2025
|
1
|
10 - 15
|
12 - 14
|
7
|
Pipeline for gathering of gases from Ca Kiem Nau gas field linked to Ca Rong Do – Lan Tay pipeline
|
2020 - 2025
|
1.5
|
30 - 35
|
12 - 16
|
8
|
Phong Lan Dai – Lan Tay gas field gathering pipeline
|
2020 - 2025
|
1.5
|
20 - 25
|
12 - 16
|
9
|
Song Ngu – Kinh Ngu Trang gas field gathering pipeline system
|
2021
|
-
|
17
|
12
|
10
|
Lead A – Kinh Ngu Trang gas field gathering pipeline system
|
2025
|
-
|
29
|
12
|
11
|
Pipeline linking the central compression platform at Bach Ho to Nam Con Son 2
|
2019
|
7
|
14
|
26
|
12
|
Sao Vang/Dai Nguyet - Nam Con Son 2 gas transmission pipeline system – 1st stage
|
2019 - 2021
|
2 - 3
|
25 - 50
|
16 - 26
|
13
|
Sao Vang/Dai Nguyet - Nam Con Son 1 gas transmission pipeline system (KP75)
|
2021 - 2025
|
2 - 3
|
35
|
20 - 26
|
14
|
Pipeline for connection between BK platform – Thien Ung and Sao Vang/Dai Nguyet
|
2019 - 2021
|
1 - 2
|
25
|
16
|
|