III Onshore high-pressure gas pipeline system and gas distribution station



tải về 486 Kb.
trang3/5
Chuyển đổi dữ liệu01.05.2023
Kích486 Kb.
#54618
1   2   3   4   5
60 QD-TTg 340588

III

Onshore high-pressure gas pipeline system and gas distribution station





1

LFS Long Hai – GPP2 gas transmission pipeline

2019

7

9

26

2

GPP2 – GDC Phu My gas transmission pipeline

2019

7

30

30

3

Ethane transmission pipeline for connection between ethane fractionation plant to Long Son petrochemical refining complex

2019

300,000 tons

23

8

4

GPP2 – Thi Vai LPG transmission pipeline

2019


24

8

5

GPP2 – Thi Vai condensate transmission pipeline

2019


24

6

6

Improvement/ alteration of Thi Vai port storage facility

2019




7

Improvement/ alteration of GDC Phu My

2019




8

Alteration of GDS Nhon Trach, Hiep Phuoc

2019




IV

Low-pressure gas/CNG/LNG pipeline system





1

Phu My 2, Phu My 3 - Cai Mep low-pressure gas pipeline system for distribution of gases to households for industrial uses

2019

0.1 – 0.5

30

6 - 10

2

Gas supply pipeline system for Hiep Phuoc industrial park (2nd stage) - Long Hau

2017

0.3

20

6 - 8

3

Gas supply pipeline system for Nhon Trach industrial park (2nd stage) – Ong Keo

2017

0.3

-

-

4

Gas supply pipeline system for household uses at Long Thanh district’s IPs

2019

0.2

-

-

5

Gas supply system for Nhon Duc – Phuoc Kien – Phu My Hung – Thu Thiem (HCMC) residential zones

2020

0.3

-

-

6

Gas (CNG/LNG) supply pipeline system for Long Thanh airport

2020 - 2025

0.2

-

-

7

Gas supply pipeline system for Tan Thanh’s residential zones

2020

0.1

-

-

V

Gas treatment plant





1

Dinh Co (GPP2) gas treatment plant integrated with ethane fractionation complex

2019

7

-

-

2

Ethane fractionation plant at Dinh Co (integrated with GPP2)

2019

2

-

-

3

LNG plant and system for supply of gases to means of transport

2018

0.17 – 0.33

-

-

+ 2026 – 2035 period:

No.

Name of pipeline

Operation commencement period

Expected capacity (billion m3/year)

Length (km)

Diameter (inch)

I

Main offshore high-pressure gas pipeline system





1

Gas transmission pipeline system from Phu Khanh basin to Binh Thuan/ Ba Ria – Vung Tau province

2030 - 2035

3

250

20

2

Gas transmission pipeline system from Tu Chinh – Vung May basin to Nam Con Son 1/ Nam Con Son 2

2030 - 2035

2

150

18

II

Gas gathering pipelines





1

Ha Ma Xam – Rong/ Doi Moi gas gathering pipeline

2026 - 2035

0.3

18

12

2

Doi Nau – Ha Ma Xam gas gathering pipeline

2026 - 2035

0.15

25

10

3

Rong Vi Dai (Block 11-2) – Rong Doi gas field gathering pipeline

2026 - 2035

0.26

15

12

4

12C gas field (Block 12E) – Rong Doi gas gathering pipeline

2026 - 2035

0.47

20

16

5

Thien Nga gas field (Block 12W) – Chim Sao/ Dua gas gathering pipeline

2026 - 2035

0.26

10

10

6

Gas gathering pipeline from gas wells at Block 06.1, 05-2 & 05-3, 11-2 to Nam Con Son 1

2026 - 2035

1.8

60

16

7

Gas gathering pipeline from Than Nong gas field, Block 04-1, 04-2, 04-3, 05-1 to Nam Con Son 2 gas pipeline

2026 - 2035

1.4

50

16

- Southwest region:

No.

Project

Operation commencement period

Expected capacity (billion m3/year)

Length (km)

Diameter (inch)

I

Main offshore high-pressure gas pipeline system





1

Block B – O Mon gas transmission pipeline system

2021 - 2022

6.4

292

28

2

Pipeline (from KP209 of Block B pipeline) for supplementary supply of gases to PM3 – Ca Mau

2020

2.4

37

18

II

Gas gathering pipeline system





1

Khanh My – BOD WHP/BOA CPP gas transmission pipeline

2020

2.2

20

20

2

Dam Doi gas field – Khanh My pipeline

2020

0.65

7.5

12

3

Hoa Mai gas field – Dam Doi gathering pipeline

2020

0.4

14

8

4

U Minh/Minh Hai gas field – Khanh My pipeline

2022

1.1

23

16

5

Nam Du gas field – U Minh/Minh Hai pipeline

2024

0.5

27

12

III

Onshore high-pressure gas pipeline system





1

Block B gas transmission pipeline from the landfall point to the landfall station (LFS) & GDS Kien Giang

2021

6.4

30

28

2

Block B – O Mon gas transmission pipeline from Kien Giang to O Mon

2021

6.4

72

22

3

Low-pressure gas supply system in Ca Mau

After 2021

0.1 – 0.2

15 - 25

6 - 10

4

Low-pressure gas supply system in Can Tho

After 2025

0.1 – 0.3

20 - 30

6 - 10

5

Low-pressure gas supply system in Kien Giang

After 2025

0.1 – 0.3

30 - 50

8 - 12

IV

Gas treatment plant





1

Gas treatment plant in Ca Mau

2017

2.2



2

Gas treatment plant in Kien Giang

2021 - 2025

6.4



b) LNG import projects
- 2016 – 2025 period:

No.

Project

Operation commencement period

Expected capacity (million ton/year)

Length (km)

Diameter (inch)

I

Storage unit at LNG import terminal





1

Thi Vai LNG storage unit

2020 - 2022

1 - 3



2

Southwest region (Ca Mau) LNG storage unit – 1st stage

2022 - 2025

1



3

Son My (Binh Thuan) LNG storage unit – 1st stage

2023 - 2025

1 - 3



4

Southeast region LNG storage unit (maybe in Tien Giang province)

2022 - 2025

4 - 6



II

Regasification pipelines





1

Gas pipeline from the existing Thi Vai LNG regasification storage unit – the existing GDC

2020 - 2022

4.5 billion m3/year

12

18

2

Southwest LNG storage unit – Ca Mau pipeline

2022 - 2025

5 billion m3/year

85

20 - 28

3

Gas pipeline from Son My LNG storage unit to Son My electricity center

2023 - 2025

5 – 11 billion m3/year

10

38 - 45

- 2026 – 2035 period:

No.

Project

Operation commencement period