International Journal of Engineering Inventions


 Technical points in draw frame regarding to setting



tải về 1.28 Mb.
Chế độ xem pdf
trang16/27
Chuyển đổi dữ liệu30.09.2023
Kích1.28 Mb.
#55222
1   ...   12   13   14   15   16   17   18   19   ...   27
Analysis on the Defects in Yarn Manufacturing Process

5.3.2 Technical points in draw frame regarding to setting 

If back roller setting is wider then it disturbs the yarn strength. It also affects yarn evenness and 
increases imperfection (neps 200%, thick +50, thin -50). 

If pressure increases in back top roller then yarn strength is decreased and breakage rate is reduced. 

If front roller speed is to be keep more wider then it improve the yarn strength. 

Sliver uniformity can be reduced if draft is more but fiber parallelization is improved.[48] 
5.3.3 Critical success factor 

Auto leveller gauge setting. 

C.V% of output sliver. 

Grains per yard. 
5.3.4 Factor which affect the yarn quality 
Following are the factors which affects the yarn quality: 

Fiber length 

Types of drafting 

Delivery speed 

Fiber fineness 

Auto leveler setting 

Break draft 

Total draft 
5.3.5 How Much Importance for Quality? 
Following points are very important regarding to quality in draw frame: 

For improving quality auto leveller is very necessary. Auto levellers fulfil the requirement according to 
need. 

Draw frame sliver test is very necessary after every ten days. A% (alarm of bad quality) should be less 
than 0.8%. 

1 meter C.V from uster testing machine should be less than 0.6. 

For improvement in quality, top roller buffing (polishing) should be done within a month. 

After every hour there should be cleaning of top roller. If cleaning will not be there then sliver variation 
will be more. 

10 meter sliver should be wasted when start the machine after overlapping, because if it is used in 
process then C.V may be increased. 


Analysis on the Defects in Yarn Manufacturing Process & its Prevention in Textile Industry
 
www.ijeijournal.com
Page | 57 

Machine setting should be proper otherwise that back creel sliver breakage will increase. In this 
condition sliver piecing will be more. 

From quality point of view 10 meter sliver should be wasted.[49] 

tải về 1.28 Mb.

Chia sẻ với bạn bè của bạn:
1   ...   12   13   14   15   16   17   18   19   ...   27




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương