The minister of posts and telematics





  • Pursuant to the Ordinance on Goods Quality of January 04, 2000;

  • Pursuant to the Government's Decree No. 90/2002/ND-CP of November 11, 2002 on the functions, tasks, powers and organizational structure of the Ministry of Posts and Telematics;

  • Pursuant to the Decision No. 27/2001/QD-TCBD of January 09, 2001 of the Department General of Posts and Telecommunications (now the Ministry of Posts and Telematics) on establishing, promulgating and adopting standards;

  • At the proposal of the Director General of the Department of Science - Technology,


Decides

Article 1.- To promulgate together with this Decision 02 technical standards on Telecommunication Terminal Equipment as follows:

  1. ElectroMagnetic Compatibility (EMC) - Electrostatic discharge immunity - Testing and measurement techniques

Code: TCN 68 - 207: 2002

  1. ElectroMagnetic Compatibility (EMC) - Voltage dips, short interruptions and voltage variations immunity - Testing and measurement techniques

Code: TCN 68 - 208: 2002

  1. ElectroMagnetic Compatibility (EMC) - Surge immunity - Testing and measurement techniques

Code: TCN 68 - 209: 2002

  1. ElectroMagnetic Compatibility (EMC) - Power frequency magnetic field immunity - Testing and measurement techniques

Code: TCN 68 - 210: 2002
Article 2.- These technical standards mentioned in the Article 1 take effect 15 (fifteen) days after signing of this Decision.

Article 3.- The Director General of the Ministry’s Office, the Director General of the Department of Science & Technology, the heads of the agencies attached to the Ministry of Posts and Telematics and organizations and individuals engaged shall have to implement this Decision.

For the minister of posts and telematics


Standing deputy minister

(Signed and sealed)

Mai Liem Truc

electromagnetic compatibility (EMC)

Surge immunity

Testing and measurement techniques


(Issued together with Decision No. 28/2002/QD-BBCVT of December 18, 2002
of the Minister of Posts and Telematics)

1. Scope


This standard relates to the immunity requirements, test methods, and range of recommended tests levels for equipment to unidirectional surges caused by overvoltages from switching and lightning transients. Several test levels are defined which relate to different environment and installation conditions. These requirements are developed for and are applicable to electrical and electronic equipment.

The object of this standard is to establish a common reference for evaluating the performance of equipment when subjected to high-energy disturbances on the power and interconnection lines.

This standard defines:

- Range of test levels;

- Test equipment;

- Test set-up;

- Test procedure.

The task of the described laboratory test is to find the reaction of the EUT under specified operational conditions caused by surge voltages from switching and lightning effects at certain threat levels.

It is not intended to test the capability of the insulation to withstand high-voltage stress. Direct lightning is not considered in this standard.

This standard does not intend to specify the tests to be applied to particular apparatus or systems. Its main aim is to give a general basic reference to all concerned product committees. The product committees (or users and manufacturers of equipment) remain responsible for the appropriate choice of the test and the severity level to be applied to their equipment.



Note: This standard is applicable to telecommunication equipments.

2. Normative references

[1] IEC 1000-4-5:1995, Electromagnetic compatibility (EMC) - Part 4: Testing and measurement techniques - Section 5: Surge immunity test

[2] IEC 50(161): 1990, International Electrotechnical Vocabulary (IEV) - Chapter 161: Electromagnetic compatibility

[3] IEC 60-1: 1989, High-voltage test techniques - Part 1: General definitions and test requirements

[4] IEC 469-1: 1987, Pulse techniques and apparatus - Part 1: Pulse terms and definitions

3. General

3.1 Switching transients

System switching transients can be separated into transients associated with:

a) Major power system switching disturbances, such as capacitor bank switching;

b) Minor switching activity near the instrumentation of load changes in the power distribution system;

c) Resonating circuits associated with switching devices, such as thyristors;

d) Various system faults, such as short circuits and arcing faults to the earthing system of the installation.



3.2 Lightning transients

The major mechanisms by which lightning produces surge voltage are the following:

a) A direct lightning stroke to an external circuit (outdoor) injecting high currents producing voltages by either flowing through earth resistance of flowing through the impedance of the external circuit;

b) An indirect lightning stroke (i.e. a stroke between or within clouds or to nearby objects which produces electromagnetic fields) that induces voltages/currents on the conductors outside and/or inside a building;

c) Lightning earth current flow resulting from nearby direct-to-earth discharges coupling into the common earth paths of the earthing system of the installation.

The rapid change of voltage and flow of current which may occur when a protector is excited may couple into internal circuits.



3.3 Simulation of the transients

a) The characteristics of the test generator are such that it simulates the above mentioned phenomena as closely as possible;

b) If the source of interference is in the same circuit, e.g. in the power supply network (direct coupling), the generator may simulate a low impedance source at the ports of the equipment under test;

c) If the source of interference is not in the same circuit (indirect coupling) as the ports of the victim-equipment, then the generator may simulate a higher impedance source.

4. Definitions

4.1 Balanced lines

A pair of symmetrically driven conductors with a conversion loss from differential to common mode of less than 20 dB.



4.2 Coupling network

Electrical circuit for the purpose of transferring energy from one circuit to another.



4.3 Decoupling network

Electrical circuit for the purpose of preventing surges applied to the EUT from affecting other devices, equipment or systems which are not under test.



4.4 Duration

The absolute value of the interval during which a specified waveform or feature exists or continues. [IEC 469-1]



4.5 Front time

Surge voltage: the front time T1 of a surge voltage is a virtual parameter defined as 1.67 times the interval T between the instants when the impulse is 30% and 90% of the peak value (see figure 2).

Current surge: the front time T1 of a surge current is a virtual parameter defined as 1.25 times the interval T between the instants when the impulse is 10% and 90% of the peak value (see figure 3). [IEC 60-1 modified]

4.6 Immunity

The ability of a device, equipment or system to perform without degradation in the presence of an electromagnetic disturbances. [IEV 161-01-20]



4.7 Electrical installation

An assembly of associated electrical equipment to fulfill a specific purpose and purposes and having coordinated characteristics. [IEV 826-01-01]



4.8 Interconnection lines

Interconnection lines consist of:

- I/O lines (input/output lines);

- Communication lines;

- Balanced lines.

4.9 Primary protection

The means by which the majority of stressful energy is prevented from propagating beyond the designated interface.



4.10 Rise time

The interval of time between the instants at which the instantaneous value of a pulse first reaches a specified lower value and then a specified upper value.



Note: Unless otherwise specified, the lower and upper values are fixed at 10% and 90% of the pulse magnitude. [IEV 161-02-05]

4.11 Secondary protection

The means by which the let-through energy from primary protection is suppressed. It may be a special device or an inherent characteristic of the EUT.



4.12 Surge

A transient wave of electrical current, voltage, or power propagating along a line or a circuit and characterized by a rapid increase followed by a slower decrease. [IEV 161-08-11 modified].



4.13 System

Set of interdependent elements constituted to achieve a given objective by performing a specified function.



Note: The system considered to be separated from the environment and other external systems by an imaginary surface which cuts the links between them and the considered system. Through these links, the system is affected by the environment, is acted upon by the external systems, or acts itself on the environment or the external systems. [IEV 351-01-01]

4.14 Time to half-value T­2

The time to half-value T­2 of a surge is a virtual parameter defined as the time interval between the virtual origin O1 and the instant when the voltage current has decreased to half the peak value. [IEC 60-1 modified]



4.15 Transient

Pertaining to or designating a phenomenon or a quantity which varies between two consecutive steady states during a time interval short compared to the time-scale of interest. [IEV 161-02-01]

5. Test levels

The preferential range of test levels is given in Table 1.



Table 1: Test levels

Level

Open-circuit test voltage

10%, kV



1

0.5

2

1.0

3

2.0

4

4.0

x

special

Note: x is an open class. This level can be specified in the product specification.

The test levels shall be selected according to the installation conditions; classes of installation are given in B.3 of annex B.

All voltages of the lower test levels shall be satisfied (see 8.2).

For selection of the test levels for the different interfaces, see annex A.

6. Test instrumentation

6.1 Combination wave (hybrid) generator (1.2/50 s - 8/20 s)

A simplified circuit diagram of the generator is given in figure 1. The values for the different components Rs1, Rs2, Rm, Lr, and Cc are selected so that the generator delivers a 1.2/50 s voltage surge (at open-circuit conditions) and a


8/20 s current surge into a short circuit, i.e. the generator has an effective out-put impedance of 2.

For convenience, an effective output impedance is defined for a surge generator by calculating the ratio of peak open-circuit output voltage and peak short-circuit current.

Such a generator with 1.2/50 s open-circuit voltage waveform 8/20 s short-circuit current waveform is referred to as a combination wave generator (CWG) or hybrid generator.

Notes:

1. The waveform of the voltage and current is a function of the EUT input impedance. This impedance may change during surges to equipment and due either to proper operation of the installed protection devices, or to flashover or component breakdown. If the protection devices are absent or inoperative. Therefore the 1.2/50 s voltage and the 8/20 s current waves have to be available from the same test generator output as instantaneously required by the load.

2. The combination wave generator described in this standard is identical to the hybrid generator sometimes specified in some other standards.

6.1.1 Characteristics and performance of the combination wave generator


Open-circuit output voltage:




At least as low as

Waveform of the surge voltage

Tolerance of the open circuit output voltage


0.5 kV to at least as high as 4.0 kV

see figure 2 and table 2


 10 %

Short-circuit output current:




At least as low as

Waveform of the surge current

Tolerance of the short-circuit output current


0.25 kA to at least as high as 2.0 kA

see figure 3 and table 2


 10 %

Polarity

positive/negative

Phase shifting

in a range between 00 to 3600 versus the AC line phase angle

Repetition rate

at least 1 per min

A generator with floating output shall be used.

Additional resistors (10  or 40 ) shall be included to increase the required effective source impedances for the specified test conditions (see clause 7 and B.1 of annex B).

Under these circumstances, the open-circuit voltage waveform and the short-circuit current waveform in combination with the coupling/decoupling network are no longer 1.2/50 s and 8/20 s respectively (combination wave).

6.1.2 Verification of the characteristics of the generator

In order to compare the test results from different test generators, the test generator characteristic shall be verified. For this purpose, the following procedure is necessary to measure the most essential characteristics of the generator.

The test generator output shall be connected to a measuring system with a sufficient bandwidth and voltage capability to monitor the characteristics of the waveforms.

The characteristics of the generator shall be measured under open-circuit conditions (load greater or equal to 10 k) and under short-circuit conditions (load smaller or equal to 0.1 ) at the same charge voltage.



Note: Short-circuit current: 0.25 kA minimum with the open-circuit voltage set to 0.5 kV and 2.0 kA minimum with the open-circuit voltage set to 4.0 kV.

6.2 Test generator 10/700 s according to CCITT

The simplified circuit diagram of the generator is given in figure 4. The values for the different components Rc, Cc, Rs, Rm1, Rm2 and Cs are defined so that the generator delivers a 10/700 s surge.



6.2.1 Characteristics and performances of the generator

Open-circuit output voltage:




At least as low as

Waveform of the surge voltage

Tolerance of the open-circuit output voltage


0.5 kV to at least as high as 4.0 kV

see figure 5 (IEC 60-1) and Table 3


 10%

Short-circuit output current:




At least as low as

Waveform of the surge current

Tolerance of the short-circuit output current


12.5 A to at least as high as 100 A

see table 3


 10%

Polarity

positive/negative

Repetition rate

at least 1 per min

A generator with floating output shall be used.

6.2.2 Verification of the characteristics of the generator

The verification conditions for the 10/700 s test generator are identical to 6.1.2 with the following note.



Note: Short-circuit current: 12.5 A minimum with the open-circuit voltage set to 0.5 kV and 100 A minimum with the open-circuit voltage set to 4.0 kV.

6.3 Coupling/decoupling networks

Coupling/decoupling networks shall not significantly influence the parameters of the generators e.g. open-circuit voltage, short-circuit current capability as in the specified tolerances.

Exception: Coupling via arrestor.

Each coupling/decoupling network shall satisfy the following requirements:



6.3.1 Coupling/decoupling networks for AC/DC power supply circuits (only used
with combination wave generator)

The front time and surge time to half value shall be verified for voltage under open-circuit conditions and for current under short-circuit conditions.

The test generator output or its coupling network shall be connected to a measuring system with a sufficient bandwidth and voltage capability to monitor the open-circuit voltage waveform.

The short-circuit current waveform can be measured with a current transformer through whose aperture passes a short-circuit link between the output terminals of the coupling network.

All waveform definitions, as well as all other performance parameters of the test generator, should be as specified in 6.1.1 at the output of the coupling/decoupling network as well as at the output of the generator itself.

Note: When the generator impedance is increased from 2  to e.g. 12  or 42  according to the requirements of the test set-up, the duration of the test pulse at the output of the coupling network might be significantly changed.

6.3.1.1 Capacitive coupling for power supply circuits

Capacitive coupling enables the test voltage to be applied line to line or one line to earth while the power supply decoupling network is also connected. The circuit diagrams for single phase systems are shown in figures 6 and 7 and for three-phase systems are shown in figures 8 and 9.

Rated characteristics of the coupling/decoupling network:

Coupling:

Coupling capacitors: C = 9 F or 18 F (see test set-up)

Decoupling:

Decoupling inductance for supply voltage: L = 1.5 mH

The residual surge voltage on unsurged lines shall not exceed 15% of the maximum applicable test voltage when the EUT is disconnected.

The residual surge voltage on the power supply inputs of the decoupling network when the EUT and the power supply network are disconnected, shall not exceed 15% of the applied test voltage or twice peak value of the power line voltage whichever is higher.

The above-mentioned characteristics for single-phase systems (line, neutral, protective earth) are also valid for three-phase systems (three-phase wires, neutral and protective earth).

6.3.1.2 Inductive coupling for power supply

Under consideration.

6.3.2 Coupling/decoupling networks for interconnection lines

The coupling method shall be selected as a function of the circuits and operational conditions. This has to be specified in the product specification.

Examples of the coupling methods are the following:

- Capacitive coupling;

- Coupling via arrestors.

The different set-ups defined in the following subclauses to test a given port of the EUT may not give comparable results. The most suitable set-up has to be selected in the product specification/standard.



Note: RL in figures 10 to 12 represents the resistive part of the inductance L and the value is dependent on negligible attenuation of the transmission signal.

6.3.2.1 Capacitive coupling for interconnection lines

The capacitive coupling is the preferred method for unbalanced unshielded I/O circuits when there is no influence to the functional communication on that line. The application is in accordance with figure 10 for line-to-line coupling and for line-to-earth coupling.

Rated characteristics of the capacitive coupling/decoupling network:

- Coupling capacitor C = 0.5 F

- Decoupling inductors L (not current compensated) = 20 mH



Note: Signal current capability has to be considered and is dependent on the circuits
under test.

6.3.2.2 Coupling via arrestors

Coupling via arrestors is the preferred coupling method for unshielded balanced circuits (telecommunication), as shown in figure 12.

The method can also be used in cases where the capacitive coupling is not possible because of functional problems caused by attachment of capacitors to the EUT (see figure 11).

The coupling network also has the task to accommodate the distribution of the surge current in the case of induced voltages in multiconductor cables.

Therefore the resistances Rm2 in the coupling network shall be, for n composite conductors, n x 25  (for n equal to or greater than 2).

Example: n = 4, Rm2 = 4 x 25 . With the impedance of the generator the total value is approximately 40 , Rm2 shall not exceed 250 .

The coupling via gas-filled arrestors can be improved by capacitors in parallel with the arrestors.

Example: C  0.1 F for frequencies of the transmission signal on the line below 5 kHz. At higher frequencies no capacitors are used.

Rated characteristics of the coupling/decoupling network:



- Coupling resistance Rm2

n x 25  (for n equal to or greater than 2)

- Arrestor (gas-filled)

90 V

- Decoupling inductor L (ring core, current compensated)

20 mH


Notes:

1. In some cases, arrestors with higher activation voltages are used for functional reasons.

2. Other elements than arrestors may be used when the operational conditions are not unduly influenced.

6.3.3 Other coupling methods

Other coupling methods are under consideration

7. Test set-up

7.1 Test equipment


  • The following equipment is part of the test set-up:

  • Equipment under test (EUT);

  • Auxiliary equipment (AE);

  • Cables (of specified type and length);

  • Coupling device (capacitive or arrestors);

  • Test generator (combination wave generator, 10/700 s generator);

  • Decoupling network/protection devices;

  • Additional resistors, 10  and 40  (see B.1 of annex B).

7.2 Test set-up for tests applied to EUT power supply

The surge is to be applied to the EUT power supply terminals via the capacitive coupling network (see figures 6, 7, 8 and 9). Decoupling networks are required in order to avoid possible adverse effects on equipment not under test that may be powered by the same lines and to provide sufficient decoupling impedance to the surge wave so that the specified wave may be developed on the lines under test.

If not otherwise specified the power cord between the EUT and the coupling/decoupling network shall be 2 m in length (or shorter).

To simulate the representative coupling impedances, in some cases additional specified resistors have to be used for the tests (explanations, see B.1 of annex B).



Note: In some countries (e.g. USA) standards for AC lines require the tests according to figures 7 and 9 with a 2  impedance although this is a more severe test. The general requirement is 10 .

7.3 Test set-up for tests applied to unshielded unsymmetrically operated
interconnection lines

In general, the surge is applied to the lines in accordance with figure 10 via capacitive coupling. The coupling/decoupling network shall not influence the specified functional conditions of the circuits to be tested.

An alternative test set-up (coupling via arrestors) is given in figure 11 for circuits with a higher signal transfer rate. Selection shall be made depending on the capacitive load with respect to the transmission frequency.

If not otherwise specified, the interconnection line between the EUT and the coupling/decoupling network shall be 2 m in length (or shorter).



7.4 Test set-up for tests applied to unshielded symmetrically operated
interconnection/telecommunication lines (figure 12)

For balanced interconnection/telecommunication circuits, the capacitive coupling method can normally not be used. In this case, the coupling is performed via gas arrestors (CCITT Recommendation K.17). Test levels below the ignition point of the coupling arrestor (about 300 V for a 90 V arrestors) can not be specified (except in the case of secondary protection without gas arrestors).



Note: Two test configurations are to be considered:

- For the equipment level immunity test with only secondary protection at the EUT at a low test level, e.g. 0.5 kV or 1 kV.

- For the system level immunity test with additional primary protection at a higher test level, e.g. 2 kV or 4 kV.

If not otherwise specified the interconnection line between the EUT and the coupling/decoupling network shall be 2 m in length (or shorter).



7.5 Test set-up for tests applied to shielded lines

In the case of shielded lines a coupling/decoupling network may not be applicable. Thus the surge is applied to the shields (metallic enclosures) of the EUTs and connected shields of the lines in accordance with figure 13. For shields connected at one end figure 14 applies. For decoupling the connected safety earthwire a safety isolating transformer shall be used. Normally, the maximum length of the specified shielded cable shall be used. With respect to the frequency spectrum of the surge 20 m length of the specified shielded cable shall be used in non-inductively bundled configuration for physical reasons.

Rules for application of the surge to shielded lines:

a) Shields earthed at both ends

- The surge injection on the shield shall be carried out according to figure 13.

b) Shields earthed at one end

- The test shall be carried out according to figure 14. The capacitor C represents the cable capacity to earth and the value may be calculated with 100 pF/m. As a representative value 10 nF may be used unless otherwise specified.

The test level applied on shields is the "line-to-earth value" (2  impedance)



7.6 Test set-up to apply potential differences

If it is necessary to apply potential differences which simulate voltages that can occur within a system, the tests may be carried out in accordance with figure 13 for systems with shielded lines, shields earthed at both ends, and in accordance with figure 14 for systems with unshielded lines or shielded lines earthed only at one end.



7.7 Other test set-ups

If one of the specified coupling methods in the test set-up cannot be used for functional reasons, alternative methods (suitable for the special case) shall be specified in the dedicated product standard.



7.8 Test conditions

The operational test conditions and the installation conditions shall be in accordance with the product specification and shall include the:

- Test configuration (hardware);

- Test procedure (software).

8. Test procedure

8.1 Laboratory reference conditions

In order to minimize the impact of the environmental parameters on the test results, the test shall be carried out in climatic and electromagnetic reference conditions as specified in 8.1.1 and 8.1.2.



8.1.1 Climatic conditions

The climatic conditions shall comply with the following requirements:

- Ambient temperature: 150C to 350C

- Relative humidity: 10% to 75%

- Atmospheric pressure: 86 kPa to 106 kPa (860 mbar to 1060 mbar).

Note: Any other value may be specified in the product specification. The EUT should be operated within its intended climatic conditions. The temperature and relative humidity should be recorded in the test report.

8.1.2 Electromagnetic conditions

The electromagnetic environment of the laboratory shall not influence


the test results.

8.2 Application of the surge in the laboratory

The characteristics and performance of the test generators shall be as specified in 6.1.1 and 6.2.1; the calibration of the generators shall be performed according to 6.1.2 and 6.2.2.

The test shall be performed according to the test plan that shall specify (see also B.2 of annex B) the test set-up with

- Generator and other equipment utilized;

- Test level (voltage/current) (see annex A);

- Generator source impedance;

- Polarity of the surge;

- Internal or external generator trigger;

- Number of tests: at least five positive and five negative at the selected points;

- Repetition rate: maximum 1/min.



Note: Most protectors in common use have low average power capabilities, even though their peak power or peak energy handling can deal with high currents. Therefore the maximum repetition rate (the time between two surges and the recovery time) depends on the built-in protection devices of the EUT.

- Inputs and outputs to be tested;



Note: In the case of several identical circuits representative measurements on a selected number of circuits may be sufficient.

- Representative operating conditions of the EUT;

- Sequence of application of the surge to the circuits;

- Phase angle in the case of a.c. power supply;

- Actual installation conditions, for example:

AC: neutral earthed

DC: (+) or (-) earthed to simulate the actual earthing conditions.

Information on the mode to perform the tests is given in B.2 of annex B.

If not otherwise specified the surges have to be applied synchronized to the voltage phase at the zero-crossing and the peak value of the a.c. voltage wave (positive and negative).

The surges have to be applied line to line and line(s) and earth. When testing line to earth the test voltage has to be applied successively between each of the lines and earth, if there is no other specification.



Note: When using the combination wave generator to test two or more lines (telecommunication lines) to earth the duration of the test pulse might be reduced.

The test procedure shall also consider the non-linear current-voltage characteristics of the equipment under test. Therefore the test voltage has to be increased by steps up to the test level specified in the product standard or test plan.

All lower levels including the selected test level shall be satisfied. For testing the secondary protection, the output voltage of the generator shall be increased up to the worst-case voltage breakdown level (let-through level) of the primary protection.

If the actual operating signal sources are not available, they may be simulated. Under no circumstances may the test level exceed the product specification. The test shall be carried out according to a test plan.

To find all critical points of the duty cycle of the equipment, a sufficient number of positive and negative test pulses shall be applied. For acceptance test a previously unstressed equipment shall be used or the protection devices shall be replaced.

9. Test results and test report

This clause gives a guide for the evaluation of the test results and for the test report, related to this standard.

The variety and diversity of equipment and systems to be tested makes the task of establishing the effects of surges on equipment and systems difficult.

The test results shall be classified on the basic of the operating conditions and the functional specifications of the equipment under test, as in the following, unless different specifications are given by product committees or product specifications:

a) normal performance within the specification limits;

b) temporary degradation or loss of function or performance which is self-recoverable;

c) temporary degradation or loss of function or performance which requires operator intervention or system reset;

d) degradation or loss of function which is not recoverable due to damage of equipment (components) or software, or loss of data.

Equipment shall not become dangerous or unsafe as a result of the application of the tests defined in this standard.

In the case of acceptance tests, the test programme and the interpretation of the test results shall be described in the specific product standard.

As a general rule, the test result is positive if the equipment shows its immunity for all the period of application of the surge, and at the end of the tests the EUT fulfils the functional requirements established in the technical specification.

The technical specification may define effects on the EUT that may be considered insignificant and therefore acceptable.

For these conditions it shall be verified that the equipment is able to recover its operative capabilities by itself at the end of application of the surges; the time interval during which the equipment has lost its full functional capabilities shall be therefore recorded. These verifications are binding for the definitive evaluation of the test result.

The test report shall include the test conditions and the test results.





U

Rc

Cc

Rs

Rm

Lr



High-voltage source

Charging resistor

Energy storage capacitor

Pulse duration shaping resistor

Impedance matching resistor

Rise time shaping inductor



Figure 1: Simplified circuit diagram of the combination wave generator

Table 2: Definitions of the waveform parameters 1.2/50 s

Definitions

In accordance with IEC 60-1

In accordance with IEC 469-1

Front time

s



Time to

half value, s

Rise time

(10% - 90%), s

Duration time

(50% - 50%), s

Open-circuit voltage

Short-circuit current



1.2

8


50

20


1

6.4


50

16


Note: In existing IEC publications, the waveforms 1.2/50 s and 8/20 s are generally defined according to IEC 60-1 as shown in figures 2 and 3. Other IEC recommendations are based on waveform definitions according to IEC 469-1 as shown in table 2.

Both definitions are valid for this section of IEC 1000-4 and describe just one single generator.


Front time: T1 = 1.67 x T = 1.2 s  30%

Time to half-value: T2 = 50 s  20%

Figure 2: Waveform of open-circuit voltage (1.2/50 s)
(waveform definition according to IEC 60-1)

Front time: T1 = 1.25 x T = 8 s  20%

Time to half-value: T2 = 20 s  20%

Figure 3: Waveform of short-circuit current (8/20 s)
(waveform definition according to IEC 60-1)





U

Rc

Cc

Rs

Rm

Cs

S1


High-voltage source

Charging resistor

Energy storage capacitor (20 F)

Pulse duration shaping resistor (50 )

Impedance matching resistors (Rm1 = 15 ; Rm1 = 25 )

Rise time shaping capacitor (0.2 F)

Switch load when using external matching resistors




Figure 4: Simplified circuit diagram of the 10/700 s impulse generator. (according to ITU-T, figure 1/K.17)
Table 3: Definitions of the waveform parameters 10/700 s

Definitions

In accordance with ITU-T

In accordance with

IEC 469-1

Front time

s



Time to

half value, s

Rise time

(10% - 90%), s

Duration time

(50% - 50%), s

Open-circuit voltage

Short-circuit current



10

-


700

-


6.5

4


700

300


Note: In existing IEC and ITU-T publications, the waveform 10/700 s are generally defined according to IEC 60-1 as shown in figure 5. Other IEC recommendations are based on waveform definitions according to IEC 469-1 as shown in table 3.

Both definitions are valid for this section of IEC 1000-4 and describe just one single generator.


Front time: T1 = 1.67 x T = 10 s  30%

Time to half-value: T2 = 700 s  20%
Figure 5: Waveform of open-circuit voltage (10/700 s)
(waveform definition according ITU-T)



Figure 6: Example of test set-up for capacitive coupling on AC/DC lines;
line-to-line coupling (according to 7.2)




Figure 7: Example of test set-up for capacitive coupling on AC/DC lines;
line-to-earth coupling (according to 7.2)




Figure 8: Example of test set-up for capacitive coupling on AC lines (3 phases); line L3 to line L1 coupling (according to 7.2)

1) Switch S1

- line to earth: position 0

2) Switch S2

- during test positions 1 to 4
Figure 9: Example of test set-up for capacitive coupling on AC lines (3 phases); line L3 to earth coupling (according to 7.2); generator output earthed

1) Switch S1

- line to earth: position 0

- line to line: positions 1 to 4

2) Switch S2

- during test positions 1 to 4, but not in the same position with switch S1

3) L = 20 mH, RL represents the resistive part of L
Figure 10: Example of test set-up for unshielded interconnection on AC lines;
line-to-line/line-to-earth coupling (according to 7.3), coupling via capacitors


1) Switch S1

- line to earth: position 0

- line to line: positions 1 to 4

2) Switch S2

- during test positions 1 to 4, but not in the same position with switch S1

3) L = 20 mH, RL represents the resistive part of L
Figure 11: Example of test set-up for unshielded unsymmetrically operated lines; ine-to-line/line-to-earth coupling (according to 7.3), coupling via arrestors

a) Switch S1

- line to earth: position 0

- line to line: positions 1 to 4 (1 line in turn earthed)

b) Calculation of Rm2 when using CWG (1.2/50 s generator)

Example for n = 4:

Rm2 = 4 x 40  = 160 , max. 250 

Calculation of Rm2 when using 10/700 s generator

The internal matching resistor Rm2 (25 ) is replaced by external Rm2 = n x 25  per conductor (for n conductors with n equal or greater than 2)

Example for n = 4:

Rm2 = 4 x 25  = 100 , Rm2 shall not exceed 250 

c) C = 0.1 F for frequencies of the transmission signal below 5 kHz;

at higher frequencies no capacitors are used

d) L = 20 mH, RL: value depending on negligible attenuation of the transmission signal


Figure 12: Example of test set-up for unshielded symmetrically operated lines telecommunication lines); line-to-line/line-to-earth coupling (according to 7.4), coupling via arrestors


Figure 13: Example of test set-up for tests applied to shielded lines
(according to 7.5) and to apply potential differences
(according to 7.6), conductive coupling


Safety insulation transformer

Safety insulation transformer


L


L

N


N

PE


PE





EUT 2

EUT 1


l = 20 m








C = 10 nF

Test generator






Earth reference



Figure 14: Example of test set-up for tests applied to unshielded lines
and shielded lines earthed only at one end (according to 7.5)
and to apply potential differences (according to 7.6), conductive coupling

Annex A


(Normative)

Selection of generators and test levels


The selection of the test levels shall be based on the installation conditions. For this purpose table A.1 should be used, together with information and examples given in B.3 of annex B where:

Class 0: Well-protected electrical environment, often within a special room

Class 1: Partly protected electrical environment.

Class 2: Electrical environment where the cables are well separated, even at short runs

Class 3: Electrical environment where the cables run in parallel.

Class 4: Electrical environment where the interconnections are running as outdoor cables along with power cables, and cables are used for both electronic and electric circuits.

Class 5: Electrical environment electronic equipment connected to telecommunication cables and overhead power lines in a non-densely populated area.

Class x: Special conditions specified in the product specification.

Additional information is given in figures B.1 to B.3 of annex B.

To demonstrate the system level immunity, additional measures relevant to the actual installation conditions, e.g. primary protection, should be taken.

The surges (and test generator) related to the different classes are as in the following:

Classes 1 to 4: 1.2/50 s (8/20 s)

Class 5: 1.2/50 s (8/20 s) for ports of power lines and short-distance signal circuits/lines.

10/700 s for ports of long-distance signal circuits/lines.

The source impedances shall be as indicated in the figures of the test set-ups concerned.



Table A.1: Selection of the test levels (depending on the installation conditions)

Installation

class

Test levels

Power supply

Coupling mode

Unbalanced operated circuits/lines, LDB

Coupling mode

Balanced operated

circuits/lines

Coupling mode

SDB.DB1)

Coupling mode

Line

to line

kV

Line

to earth

kV

Line

to line

kV

Line

to earth

kV

Line

to line

kV

Line

to earth

kV

Line

to line

kV

Line

to earth

kV

0

1

2



3

4

5



x

NA

NA

0.5



1.0

2.0


2)

NA

0.5


1.0

2.0


4.03)

2)

NA

NA

0.5



1.0

2.0


2.0

NA

0.5


1.0

2.03)

4.03)

4.03)



NA

NA

NA



NA

NA

NA



NA

0.5


1.0

2.03)

2.03)

4.03)



NA

NA

NA



NA

NA

NA



NA

NA

0.5



NA

NA

NA



1) Limited distance, special configuration, special layout, 10 m to max. 30 m: no test is advised at interconnection cables up to 10 m, only class 2 is applicable.

2) Depends on the class of the local power supply system.

3) Normally tested with primary protection


Explanation:

DB = data bus (data line)

SDB = short-distance bus

LDB = long-distance bus

NA = not applicable

Annex B


(Informative)

Explanatory notes

B.1 Different source impedances

The selection of the source impedance of the generator depends on:

- The kind of cable/conductor/line (AC power supply, DC power supply, interconnection, etc.);

- The length of the cables/lines;

- Indoor/outdoor conditions;

- Application of the test voltage (line to line or lines to earth)

The impedance of 2  represents the source impedance of the low-voltage power supply network. The generator with its effective output impedance of
2  is used.

The impedance of 12  (10  + 2 ) represents the source impedance of the low-voltage power supply network and earth.

The generator with an additional resistor of 10  in series is used.

The impedance of 42  (40  + 2 ) represents the source impedance between all other lines and earth.

The generator with an additional resistor of 40  in series is used.

In some countries (for instance, USA) standards for AC lines require the tests according to figures 7 and 9 with a 2  impedance; this is a more severe test. The general requirement is 10 .

B.2 Application of the tests

Two different kinds of tests are to be distinguished: at equipment level and at system level.



B.2.1 Equipment level immunity

The test shall be carried out in the laboratory on a single EUT. The immunity of the EUT thus tested is referred to equipment level immunity.

The test voltage shall not exceed the specified capability of the insulation to withstand high-voltage stress.

B.2.2 System level immunity

The test carried out in the laboratory refers to the EUT. The equipment level immunity does not assure the immunity of a system in all cases. For that reason a test on system level is advised which simulates the real installation. The simulated installation comprises protective devices (arrestors, varistors, shielded lines, etc.) and the real length and type of the interconnection lines.

This test is aimed at simulating as closely as possible the installation conditions in which the EUT or EUT's are intended to function later on.

In the case of the immunity under real installation conditions, higher voltage levels can be applied, but the energy involved will be limited by the protective devices according to their current-limiting characteristics.

The test is also intended to show that secondary effects produced by the protective devices (change of waveform, mode, amplitude of voltages or currents) do not cause unacceptable effects on the EUT.

B.3 Installation classification



Class 0: Well-protected electrical environment, often within a special room

All incoming cables are provided with overvoltage (primary and secondary) protection. The units of the electronic equipment are interconnected by a well-designed earthing system, which is not essentially influenced by the power installation or lightning.

The electronic equipment has a dedicated power supply (see table A.1)

Surge voltage may not exceed 25 V.



Class 1: Partly protected electrical environment

All incoming cables to the room are provided with overvoltage (primary) protection. The units of the equipment are well interconnected by an earth-line network, which is not essentially influenced by the power installation or lightning.

The electronic equipment has its power supply completely separated from the other equipment.

Switching operations can generate interference voltages within the room.

Surge voltage may not exceed 500 V.

Class 2: Electrical environment where the cables are well separated, even at short runs

The installation is earthed via a separate earth line to the earthing system of the power installation which can be essentially subjected to interference voltages generated by the installation itself or by lightning. The power supply to the electronic equipment is separated from other circuits, mostly by a special transformer for the power supply.

Non-protected circuits are in the installation, but well separated and in restricted numbers.

Surge voltage may not exceed 1 kV.

Class 3: Electrical environment where power and signal cables run in parallel

The installation is earthed to the common earthing system of the power installation which can be essentially subjected to interference voltages generated by the installation itself or by lightning.

Current due to earth faults, switching operations and lightning in the power installation may generate interference voltages with relatively high amplitudes in the earthing system. Protected electronic equipment and less sensitive electric equipment are connected to the same power supply network. The interconnection cables can be partly outdoor cables, but close to the earthing network.

Unsuppressed inductive loads are in the installation and usually there is no separation of the different field cables.

Surge voltage may not exceed 2 kV.

Class 4: Electrical environment where the interconnections are running as outdoor cables along with power cables, and cables are used for both electronic and electric circuits.

The installation is connected to the earthing system of the power installation which can be subjected to interference voltages generated by the installation itself or by lightning.

Current in the kA range due to earth faults, switching operations and lightning in the power supply installation may generate interference voltages with relatively high amplitudes in the earthing system. The power supply network can be the same for both the electronic and the electric equipment. The interconnection cables are running as outdoor cables even to the high-voltage equipment

A special case of this environment is when the electronic equipment is connected to the telecommunication network within a densely populated area. There is no systematically constructed earthing network outside the electronic equipment, and the earthing system consists of pipes, cables etc. only.

Surge voltage may not exceed 4 kV.

Class 5: Electrical environment electronic equipment connected to telecommunication cables and overhead power lines in a non-densely populated area.

All these cables and lines are provided with overvoltage (primary) protection. Outside the electronic equipment there is no widespread earthing system (exposed plant). The interference voltages due to earth faults (currents up to 10 kA) and lightning (currents up to 100 kA) can be extremely high.

The requirements of this class are covered by the test level 4 (see annex A).

Class x: Special conditions specified in the product specifications.

Examples for the installation of electronic equipment in different areas are given in figures B.1, B.2 and B.3.



B.3.1 Equipment level immunity of ports connected to the power supply network

The minimum immunity level for connection to the public supply network is:

Line-to-line coupling: 0.5 kV (test set-up see figures 6 and 8)

Line-to-earth coupling: 1 kV (test set-up see figures 7 and 9)



B.3.2 Equipment level immunity of ports connected to interconnection lines

Surge tests on interconnection circuits are only required for external connections (outside of the cabinet/housing).

If it is possible to test at the system level (EUT with interconnection cables connected) it is not necessary to test at the equipment level (e.g. ports of the process-control/signal inputs/outputs) especially in cases where the shield of the interconnection cable is part of the protection measure. If the installation of the plant is carried out by someone other than the manufacturers of the equipment, the admissible voltage for the inputs/outputs (especially for the process interface) of the EUT should be specified.

The manufacturer should test his equipment on the basic of the specified test levels to confirm the equipment level immunity, e.g. with secondary protection at the ports of the EUT for a level of 0,5 kV. The user of the plant or those responsible for the installation should then apply measures (e.g. shielding, bonding, earthing protection) necessary to ensure that the interference voltage caused by, for example, lightning strokes does not exceed the chosen immunity level.




Figure B.1: Example for surge protection by shielding in buildings
with common earth reference system




Figure B.2: Example for secondary surge protection by shielding in buildings
with separate common earth reference systems




Figure B.3: Example for primary and secondary surge protection
of indoor-outdoor equipment

T­¬ng thÝch ®iÖn tõ (EMC) - miÔn nhiÔm ®èi víi c¸c xung

Ph­¬ng ph¸p ®o vµ thö

Electromagnetic compatibility (EMC) - Surge immunity

Testing and measurement techniques



ChÞu tr¸ch nhiÖm xuÊt b¶n

Production Editor


L­u ®øc v¨n

ChÞu tr¸ch nhiÖm b¶n th¶o

Copy Editor

Lª xu©n C«ng

Biªn tËp/Editorial Assistants: §µo thÞ minh - ng« Mü h¹nh

®ç xu©n b×nh

ChÕ b¶n/Printout design: §¹t b¸ch - ngäc khoa

Söa b¶n in/Printout correct: ng« mü h¹nh

Tr×nh bµy b×a/Cover design: Vò hång nhung



Nhµ xuÊt b¶n B­u ®iÖn

Posts and Telematics Publishing House


Trô së/Headoffice: 18 - NguyÔn Du, Hµ Néi

§iÖn tho¹i/Tel: 04-9431283, 9432438 Fax: 04-9431285

E-mail: bientap@hn.vnn.vn

Chi nh¸nh/Branch: 27 NguyÔn BØnh Khiªm, QuËn 1, TP. Hå ChÝ Minh

§iÖn tho¹i/Tel: 08-9100925 Fax: 08-9100924



E-mail: chinhanh-nxbbd@hcm.vnn.vn




Каталог: Lists -> QuanLyVanBan -> Attachments
Attachments -> CỘng hoà XÃ HỘi chủ nghĩa việt nam độc lập Tự do -hạnh phúc
Attachments -> THỦ TƯỚng chính phủ Số: 118
Attachments -> Tcn 68-187: 1999 MỤc lục lời nóI ĐẦU
Attachments -> Lêi nãi ®Çu Tiªu chuÈn Ngµnh tcn 68-176: 2003 "DÞch vô ®iÖn tho¹i trªn m¹ng ®iÖn tho¹i c ng céng Tiªu chuÈn chÊt l­îng"
Attachments -> Môc lôc Lêi nãi ®Çu 5 QuyÕt ®Þnh ban hµnh cña Tæng côc tr­ëng Tæng côc B­u ®iÖn 7 Ph¹m vi ¸p dông
Attachments -> Lêi nãi ®Çu Tiªu chuÈn Ngµnh tcn 68-186: 2003 "DÞch vô ®iÖn tho¹i trªn m¹ng di ®éng mÆt ®Êt c ng céng Tiªu chuÈn chÊt l­îng"
Attachments -> T­¬ng thÝch ®iÖn tõ (emc) miÔn nhiÔm ®èi víi hiÖn t­îng phãng tÜnh ®iÖn ph­¬ng ph¸p ®o vµ thö
Attachments -> 1. Ph¹m vi 9 Tµi liÖu tham kh¶o
Attachments -> * QuyÕt ®Þnh ban hµnh cña bé tr­ëng bé b­u chÝnh viÔn th ng 7
Attachments -> Adsl internet access service

tải về 482.59 Kb.

Chia sẻ với bạn bè của bạn:
1   2




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương