09-cr2
[123doc] - phat-trien-nguon-nhan-luc-cua-cong-ty-co-phan-misa-doc
Type of Pavement 

 

Layer 

Flexible  Rigid (CRCP)  Composite w/ CTB  Composite w/ CRCP Base 

HMA 288 


(11.5) 

- 225 


 

(9) 


175 

(7) 


CRCP  

350 



(14) 

- - 


CTA

a

 - 


150 

(6) 


200 

(8) 


Granular base 

200 

(8) 


- - 

CRCP base 





200 

(8) 


Subbase 225 

(9) 


- 225 

(9) 


225 

(9) 


a

 Note: CTA = cement-treated aggregate 

 

Table 11 shows the work schedule used in the LCCA for this study.  The VDOT (2002) 



guidelines for the flexible, rigid (CRCP), and semi-rigid (composite with CTB) pavement 

structures were used.  A continuous 10-year functional mill and overlay maintenance activity 

was assumed for the composite with CRCP base pavement based on the literature (NCHRP, 

2004; MDSHA, 2002; Smith et al., 2001). 

 

A 50-year analysis period was used as recommended by VDOT.  The unit prices of 



various items were obtained from the average state bid tabulations published on VDOT’s website 

(VDOT, 2007).  The unit weight values for AC, aggregates, and drainage layer remained 

unchanged for the volumetric computations.  All costs computed were based on a 1-mile road 

section.  The present worth (PW) method was selected to compare all the different pavement 

alternatives.  A discount rate of 4%, as recommended by VDOT and the FHWA, was used.   

 


tải về 1.81 Mb.

Chia sẻ với bạn bè của bạn:
1   ...   28   29   30   31   32   33   34   35   ...   42




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương