Foundations of Software Testing ISTQB Certification 3rd ed



CHAPTER ONE
Fundamentals of testing
I
n this chapter, we will introduce you to the fundamentals of testing: why testing is
needed; its limitations, objectives and purpose; the principles behind testing; the
process that testers follow; and some of the psychological factors that testers must
consider in their work. By reading this chapter you
’ll gain an understanding of the
fundamentals of testing and be able to describe those fundamentals.
1 . 1
W H Y I S T E S T I N G N E C E S S A R Y ?
SYLLABUS LEARNING OBJECTIVES FOR
1.1 WHY IS TESTING NECESSARY? (K2)
LO-1.1.1 Describe, with examples, the way in which a defect in software can
cause harm to a person, to the environment or to a company. (K2)
LO-1.1.2 Distinguish between the root cause of a defect and its effects. (K2)
LO-1.1.3 Give reasons why testing is necessary by giving examples. (K2)
LO-1.1.4 Describe why testing is part of quality assurance and give
examples of how testing contributes to higher quality. (K2)
LO-1.1.5 Explain and compare the terms error, defect, fault, failure and
the corresponding terms mistake and bug, using examples. (K2)
In this section, we
’re going to kick off the book with a discussion on why testing
matters. We
’ll describe and illustrate how software defects or bugs can cause problems
for people, the environment or a company. We
’ll draw important distinctions between
defects, their root causes and their effects. We
’ll explain why testing is necessary to find
these defects, how testing promotes quality, and how testing fits into quality assurance.
As we go through this section, watch for the Syllabus terms bug, defect, error,
fails (false-fail result, false-positive result), failure, fault, mistake, passed (false-
negative result, false-pass result), quality, and risk. You’ll find these terms
defined in the glossary.
1.1.1 Software systems context
The last 100 years have seen an amazing human triumph of technology. Diseases
that once killed and paralyzed are routinely treated or prevented
– or even eradicated
entirely, as with smallpox. Some children who stood amazed as they watched the
1


first gasoline-powered automobile in their town are alive today, having seen people
walk on the moon, an event that happened before a large percentage of today
’s
workforce was even born.
Perhaps the most dramatic advances in technology have occurred in the arena of
information technology. Software systems, in the sense that we know them, are a
young innovation, less than 70 years old, but have already transformed daily life
around the world. Thomas Watson, the one-time head of IBM, famously predicted
that only about five computers were needed in the whole world. This vastly inaccurate
prediction was based on the idea that information technology was useful only for
business and government applications, such as banking, insurance, and conducting a
census. (The Hollerith punch-cards used by computers at the time Watson made his
prediction were developed for the United States census.) Now, everyone who drives a
car is using a machine not only designed with the help of computers, but which also
contains more computing power than the computers used by NASA to get Apollo
missions to and from the moon. Billions of mobile phones exist, many of which are
hand-held computers that get smarter and smarter with every new model.
However, in the software world, the technological triumph has not been perfect.
Almost every living person has been touched by information technology, and most of
us have dealt with the frustration and wasted time that occurs when software fails and
exhibits unexpected behaviours. Some unfortunate individuals and companies have
experienced financial loss or damage to their personal or business reputations as a
result of defective software. A highly unlucky few have even been injured or killed by
software failures.
1.1.2 The human (and other) causes of software defects
Why does software fail? Part of the problem is that, ironically, while computerization
has allowed dramatic automation of many professions, software engineering remains
a human-intensive activity. And humans are fallible beings. So, software is fallible
because humans are fallible.
The precise chain of events goes something like this. A programmer makes a
mistake (or error), such as forgetting about the possibility of inputting an excessively
long string into a field on a screen. The programmer thus puts a defect (or fault or
bug) into the program, such as forgetting to check input strings for length prior to
processing them. When the program is executed, if the right conditions exist (or the
wrong conditions, depending on how you look at it), the defect will result in unex-
pected behaviour; i.e. the system exhibits a failure, such as accepting an over-long
input that it should reject.
Other sequences of events can result in eventual failures, too. A business analyst
can introduce a defect into a requirement, which can escape into the design of the
system and further escape into the code. For example, a business analyst might say
that an e-commerce system should support 100 simultaneous users, but actually peak
load should be 1000 users. If that defect is not detected in a requirements review (see
Chapter 3), it could escape from the requirements phase into the design and imple-
mentation of the system. Once the load exceeds 100 users, resource utilization may
eventually spike to dangerous levels, leading to reduced response time and reliability
problems.
A technical writer can introduce a defect into the online help screens. For example,
suppose that an accounting system is supposed to multiply two numbers together, but
the help screens say that the two numbers should be added. In some cases, the system
False-fail result: A test
result in which a defect is
reported although no
such defect actually exists
in the test object.
False-positive result:
See false-fail result.
Error (mistake) A
human action that
produces an incorrect
result.
Defect (bug, fault) A
flaw in a component or
system that can cause the
component or system to
fail to perform its
required function, e.g. an
incorrect statement or
data definition. A defect,
if encountered during
execution, may cause a
failure of the component
or system.
Failure Deviation of the
component or system
from its expected
delivery, service or result.
2
Chapter 1 Fundamentals of testing


will appear to work properly, such as when the two numbers are both 0 or both 2.
However, most frequently the program will exhibit unexpected results (at least based
on the help screens).
So, human beings are fallible and thus, when they work, they sometimes introduce
defects. It
’s important to point out that the introduction of defects is not a purely
random accident, though some defects are introduced randomly, such as when a
phone rings and distracts a systems engineer in the middle of a complex series of
design decisions. The rate at which people make mistakes increases when they are
under time pressure, when they are working with complex systems, interfaces, or
code, and when they are dealing with changing technologies or highly interconnected
systems.
While we commonly think of failures being the result of
‘bugs in the code’, a
significant number of defects are introduced in work products such as requirements
specifications and design specifications. Capers Jones reports that about 20% of
defects are introduced in requirements, and about 25% in design. The remaining
55% are introduced during implementation or repair of the code, metadata, or
documentation [Jones 2008]. Other experts and researchers have reached similar
conclusions, with one organization finding that as many as 75% of defects originate
in requirements and design. Figure 1.1 shows four typical scenarios, the upper stream
being correct requirements, design, and implementation, the lower three streams
showing defect introduction at some phase in the software lifecycle.
Ideally, defects are removed in the same phase of the lifecycle in which they are
introduced. (Well, ideally defects aren
’t introduced at all, but this is not possible, for,
as discussed before, people are fallible.) The extent to which defects are removed in
the phase of introduction is called phase containment. Phase containment is important
because the cost of finding and removing a defect increases each time that defect
escapes to a later lifecycle phase. Multiplicative increases in cost, of the sort seen in
Business
Analyst
Work
Product Is
Design
Require-
ment
System
Architect
Work
Product Is
Program-
mer
Work
Product Is
Code
Correct
Correct
Correct
Business
Analyst
Design
Work
Product Is
Require-
ment
System
Architect
Work
Product Is
Program-
mer
Work
Product Is
Code
Correct
Incorrect
Incorrect
Business
Analyst
Design
Work
Product Is
Require-
ment
System
Architect
Work
Product Is
Program-
mer
Work
Product Is
Code
Incorrect
Incorrect
Incorrect
Business
Analyst
Design
Work
Product Is
Require-
ment
System
Architect
Work
Product Is
Program-
mer
Work
Product Is
Code
Correct
Correct
Incorrect
F I G U R E 1 . 1
Four typical scenarios
Section 1 Why is Testing Necessary?
3


Figure 1.2, are not unusual. The specific increases vary considerably, with Boehm
reporting cost increases of 1: 5 (from requirements to after release) for simple systems
to as high as 1:100 for complex systems. If you are curious about the economics of
software testing and other quality-related activities, you can see [Gilb and Graham
1993], [Black 2009] or [Black 2004].
Defects may result in failures, or they may not, depending on inputs and other
conditions. In some cases, a defect can exist that will never cause a failure in actual
use, because the conditions that could cause the failure can never arise. In other cases,
a defect can exist that will not cause a failure during testing, but which always results
in failures in production. This can happen with security, reliability, and performance
defects especially, if the test environments do not closely replicate the production
environment(s).
It can also happen that expected and actual results do not match for reasons other
than a defect. In some cases, environmental conditions can lead to unexpected results
that do not relate to a software defect. Radiation, magnetism, electronic fields, and
pollution can damage hardware or firmware, or simply change the conditions of the
hardware or firmware temporarily in a way that causes the software to fail.
1.1.3 The role of testing, and its effect on quality
Since software and the associated work products are written by fallible humans, all of
these work products will always have defects. Where there are defects, there are risks
of failure. While nothing can reduce the level of risk to zero, we certainly can
– and
should
– try to reduce risk to an acceptable level prior to releasing the software to
customers and users.
Testing is part of how these risks of failure can be reduced. If the software and its
associated work products (including requirements specifications, design specifica-
tions, documentation, etc.) are subjected to the kind of rigorous, systematic testing
described in this book and in the Foundation syllabus, the testers are more likely to
find defects in some areas, while reducing the risk in other areas by determining that
Requirement
Cost to Repair
1X
2X
4X
8X
16X
Design
Code/Unit
Test
Independent
Test
After
Release
F I G U R E 1 . 2
Multiplicative increases in cost
Quality The degree to
which a component,
system or process meets
specified requirements
and/or user/customer
needs and expectations.
Risk A factor that could
result in future negative
consequences; usually
expressed as impact and
likelihood.
4
Chapter 1 Fundamentals of testing


the software works properly under the tested conditions. Developers and others on
the project teams can then debug the system, removing the defects found.
Testing does not change the quality of the system under test directly. When
testing finds defects and those defects are repaired, the quality of the system is
increased. However, debugging, not testing, is the activity that changed the quality
of the system (see Section 1.2 below).
Testing does provide a way of measuring the system
’s quality. The rate of defect
discovery, the number of known defects, the extent of test coverage, and the percentage
of tests which have passed all reflect on the quality of the system. If the tests find few
or no defects (assuming we followed proper testing approaches such as those described
in this book), or if all of the defects found are resolved, then we can have confidence in
the system. When a properly designed test is run, an unknown situation is changed into
a known situation, which reduces the level of risk to the quality of the product.
At this juncture, let us point out that a properly designed set of tests should
measure the quality of the system in terms of both functional and non-functional
characteristics. The specific characteristics tested depend on what matters in terms of
quality for the particular system under test. We
’ll discuss functional and non-
functional test types further in Chapter 2. You can find more information on func-
tional and non-functional quality characteristics in
‘Software Engineering – Software
Product Quality
’ [ISO 9126].
Testing also provides a learning opportunity that allows for improved quality if
lessons are learned from each project. If root cause analysis is carried out for the
defects found on each project, the team can improve its software development
processes to avoid the introduction of similar defects in future systems. Through
this simple process of learning from past mistakes, organizations can continuously
improve the quality of their processes and their software.
Testing thus plays an essential supporting role in delivering quality software.
However, testing by itself is not sufficient. Testing should be integrated into a
complete, team-wide and software process-wide set of activities for quality assurance.
Proper application of standards, training of staff, the use of retrospectives to learn
lessons from defects and other important elements of previous projects, rigorous and
appropriate software testing: all of these activities and more should be deployed by
organizations to assure acceptable levels of quality and quality risk upon release.
1.1.4 How much testing is enough?
Selecting which test conditions to cover is a fundamental problem of testing. As will
be discussed later in this chapter and often in this book, the number of possible test
cases is infinite for all but the simplest systems. Given immortality and unlimited
resources, we could conceivably test forever. However, in the real world, we can only
select a finite number of test cases for design, implementation, and execution.
Instead of trying to find every possible test case, an impossible ideal, we should
focus on what tests give us the greatest value by covering the most important parts of
the system. Coverage can be measured in a number of ways. In this book, we will talk
about coverage of requirements, coverage of code structures, and coverage of risks to
the quality of the product (including risks derived from technical, safety, and business
considerations).
We could say that sufficient coverage is achieved when we balance what we should
cover against project constraints such as time and budget. We should also ensure that
testing provides sufficient information to the project and product stakeholders, so that
False-pass result: A test
result which fails to
identify the presence of a
defect that is actually
present in the test object.
False-negative result:
See false-pass result.
Section 1 Why is Testing Necessary?
5


they can decide whether to proceed with the project or with release. All three of these
areas
– our analysis of what should be covered, the limitations on what can be covered,
and the stakeholders
’ specific needs for information – are to some extent in tension, in
that we may have to give up something in one area in order to increase what we achieve
in one or both of the other areas.
Testing always involves trade-offs. At some point, the various risks associated with the
project will have reached some acceptable level, one understood by the various project
stakeholders. We will discuss this issue of risk and how it influences testing in Chapter 5.
In some cases, software testing is not just a good way to reduce risks to the quality
of the system to an acceptable level; testing can be required to meet contractual or
legal requirements, or industry-specific standards. The authors have clients in the
medical systems business, and those clients are subject to regulations that require a
certain degree and rigor of testing. For companies writing software used on com-
mercial aviation, the US Federal Aviation Administration requires a certain level of
structural test coverage, a topic which we
’ll discuss in Chapter 4.
1 . 2
W H A T I S T E S T I N G ?
SYLLABUS LEARNING OBJECTIVES FOR
1.2 WHAT IS TESTING? (K2)
LO-1.2.1 Recall the common objectives of testing. (K1)
LO-1.2.2 Provide examples for the objectives of testing in different
phases of the software life cycle. (K2)
LO-1.2.3 Differentiate testing from debugging. (K2)
In this section, we will review the common objectives of testing and the activities
that allow us to achieve those objectives. We
’ll explain how testing helps us to find
defects, provide confidence and information, and prevent defects.
As you read this section, you
’ll encounter the terms confirmation testing,
debugging, requirement, re-testing, review, test case, test control, test design
specification, testing, and test objective.
An ongoing misperception about testing is that it only involves running tests.
Specifically, some people think that testing involves nothing beyond carrying out
some sequence of actions on the system under test, submitting various inputs along the
way, and evaluating the observed results. Certainly, these activities are one element of
testing
– specifically, these activities make up the bulk of the test execution activities –
but there are other activities involved in the test process.
While we
’ll discuss the test process in more detail later in this chapter (in section 1.4),
let
’s look briefly at some of the major activities in the test process:
l
Test planning: In test planning, we establish (and update) the scope, approach,
resources, schedule, and specific tasks in the intended test activities that comprise
the rest of the test process. Test planning should identify test items, the features
to be tested and not tested, the roles and responsibilities of the participants and
stakeholders, the relationship between the testers and the developers of the test
items, the extent to which testing is independent of development of these work
6
Chapter 1 Fundamentals of testing


items (see section 1.5 below), the test environments required, the appropriate test
design techniques, entry, and exit criteria, and how we’ll handle project risks
related to testing. Test planning often produces, as a deliverable work product, a
test plan. Test planning is discussed in Chapter 5.
l
Test control: While test planning is essential, things don’t always go according to
plan. In test control, we develop and carry out corrective actions to get a test project
back on track when we deviate from the plan. Test control is discussed in Chapter 5.
l
Test analysis: In test analysis, we identify what to test, choosing the test conditions
we need to cover. These conditions are any item or event that we can and should
verify using one or more test cases. Test conditions can be functions, transactions,
features, quality attributes, quality risks, or structural elements. Test analysis is
discussed in Chapter 4.
l
Test design: In test design, we determine how we will test what we decided to test
during test analysis. Using test design techniques, we transform these general test
conditions and the general testing objectives from the test plan into tangible test
cases at the appropriate level of detail. Test design generally, and specific test design
techniques, are discussed in Chapter 4.
l
Test implementation: In test implementation, we carry out the remaining activities
required to be ready for test execution, such as developing and prioritizing our test
procedures, creating test data, and setting up test environments. These elements of test
implementation are covered in Chapter 4. In many cases, we want to use automated
test execution as part of our test process. In such cases, test implementation includes
preparing test harnesses and writing automated test scripts. These elements of test
implementation are covered in Chapter 6.
l
Test execution: In test execution, we run our tests against the test object (also
called the system under test).
l
Checking results: As part test execution, we see the actual results of the test case,
the consequences and outcomes. These include outputs to screens, changes to data,
reports, and communication messages sent out. We must compare these actual
results against expected results to determine the pass/fail status of the test. Defining
expected results is discussed in Chapter 4, while managing test execution,
including checking of results, is discussed in Chapter 5.
l
Evaluating exit criteria: At a high level, exit criteria are a set of conditions that
would allow some part of a process to complete. Exit criteria are usually defined
during test planning by working with the project and product stakeholders to
balance quality needs against other priorities and various project constraints. Such
criteria ensure that everything that should be done has been done before we declare
some set of activities finished. Specifically, test exit criteria help us report our results
(as we can report progress against the criteria) as well as helping us plan when to
stop testing. Establishing and evaluating exit criteria are discussed in Chapter 5.
l
Test results reporting: In test results reporting, we want to report our progress
against exit criteria, as described above. This often involves details related to the
status of the test project, the test process, and quality of the system under test.
We
’ll discuss test results reporting in Chapter 5.
l
Test closure: Test closure involves collecting test process data related to the various
completed test activities in order to consolidate our experience, re-useable testware,
important facts, and relevant metrics. Test closure is discussed in section 1.4 below.
Test design
specification A
document specifying the
test conditions (coverage
items) for a test item, the
detailed test approach
and identifying the
associated high level test
cases.
Test control A test
management task that
deals with developing
and applying a set of
corrective actions to get a
test project on track
when monitoring shows
a deviation from what
was planned.
Test case A set of input
values, execution
preconditions, expected
results and execution
postconditions,
developed for a particular
objective or test
condition, such as to
exercise a particular
program path or to verify
compliance with a
specific requirement.
Test objective A reason
or purpose for designing
and executing a test.
Section 2 What is Testing?
7


Notice that there are major test activities both before and after test execution. In
addition, in the ISTQB definition of software testing, you’ll see that testing includes
both static and dynamic testing. Static testing is any evaluation of the software or
related work products (such as requirements specifications or user stories) that
occurs without executing the software itself. Dynamic testing is an evaluation of that
software or related work products that does involve executing the software. As such,
the ISTQB definition of testing not only includes a number of pre-execution and post-
execution activities that non-testers often do not consider
‘testing’, but also includes
software quality activities (e.g. requirements, reviews and static analysis of code) that
non-testers (and even sometime testers) often do not consider
‘testing’ either.
The reason for this broad definition is that both dynamic testing (at whatever level)
and static testing (of whatever type) often enable the achievement of similar project
objectives. Dynamic testing and static testing also generate information that can help
achieve an important process objective; that of understanding and improving the
software development and testing processes. Dynamic testing and static testing are
complementary activities, each able to generate information that the other cannot.
The following are some objectives for testing given in the Foundation Syllabus:
l
Finding defects, such as the identification of failures during test execution that
lead to the discovery of the underlying defects.
l
Gaining confidence in the level of quality, such as when those tests considered
highest risk pass and when the failures that are observed in the other tests are
considered acceptable.
l
Providing information for decision-making, such as satisfaction of entry or exit
criteria.
l
Preventing defects, such as when early test activities such as requirements reviews
or early test design identify defects in requirements specifications that are
removed before they cause defects in the design specifications and subsequently
the code itself. Both reviews and test design serve as a verification of these test
basis documents that will reveal problems that otherwise would not surface until
test execution, potentially much later in the project.
These objectives are not universal. Different test viewpoints, test levels, and test
stakeholders can have different objectives. While many levels of testing, such as
component, integration and system testing, focus on discovering as many failures as
possible in order to find and remove defects, in acceptance testing the main objective
is confirmation of correct system operation (at least under normal conditions) along
with building confidence that the system meets its requirements.
When done to evaluate a software package that might be purchased or integrated
into a larger software system, the main objective of testing might be the assessment of
the quality of the software. Defects found may not be fixed, but rather might support a
conclusion that the software be rejected.
Testing can focus on providing stakeholders with an evaluation of the risk of releasing
the system at a given time. Evaluating risk can be part of a mix of objectives, or can be an
objective of a separate level of testing, as when testing a safety critical system.
During maintenance testing, our objectives often include checking whether devel-
opers have introduced any regressions (i.e. new defects not present in the previous
version) while making changes. Some forms of testing, such as operational testing,
focus on assessing system characteristics such as reliability, security, performance or
availability.
Testing The process
consisting of all lifecycle
activities, both static and
dynamic, concerned with
planning, preparation
and evaluation of
software products and
related work products to
determine that they
satisfy specified
requirements, to
demonstrate that they
are fit for purpose and to
detect defects.
Requirement A
condition or capability
needed by a user to solve
a problem or achieve an
objective that must be
met or possessed by a
system or system
component to satisfy a
contract, standard,
specification, or other
formally imposed
document.
Review An evaluation
of a product or project
status to ascertain
discrepancies from
planned results and to
recommend
improvements. Examples
include management
review, informal review,
technical review,
inspection, and
walkthrough.
8
Chapter 1 Fundamentals of testing


Let
’s end this section by saying what testing is not, but is often thought to be.
Testing is not debugging. While dynamic testing often locates failures which are
caused by defects, and static testing often locates defects themselves, testing does not
fix defects. It is during debugging, a development activity, that a member of the project
team finds, analyzes and removes the defect, the underlying cause of the failure. After
debugging, there is a further testing activity associated with the defect, which is called
confirmation testing or re-testing. This activity ensures that the fix does indeed
resolve the failure. In terms of roles, dynamic and static testing are testing roles,
debugging is a development role, and confirmation testing is again a testing role.
1 . 3
S E V E N T E S T I N G P R I N C I P L E S
SYLLABUS LEARNING OBJECTIVES FOR
1.3 SEVEN TESTING PRINCIPLES (K2)
LO-1.3.1 Explain the seven principles in testing. (K2)
In this section, we will review seven fundamental principles of testing which have
been observed over the last 40 years. These principles, while not always understood
or noticed, are in action on most if not all projects. Knowing how to spot these
principles, and how to take advantage of them, will make you a better tester.
As you read this section, you
’ll encounter the terms complete testing, exhaus-
tive testing and test strategy.
The following subsections will review each principle, using the principle name as
the subsection title for easy correlation to the syllabus. In addition, you can refer to
Table 1.1 for a quick reference of the principles and their text, as written in the syllabus.
1.3.1 Testing shows the presence of defects
As mentioned in the previous section, one typical objective of many testing efforts is
to find defects. Many testing organizations that the authors have worked with are
quite effective at doing so. One of our clients consistently finds, on average, 99.5%
of the defects in the software it tests. In addition, the defects left undiscovered are
less important and unlikely to happen frequently in production. Sometimes, it turns
out that this test team has indeed found 100% of the defects that would matter to
customers, as no previously-unreported defects are reported after release.
However, no test team, test technique, or test strategy can achieve 100% defect
detection effectiveness. Thus, it is important to understand that, while testing can
show that defects are present, it cannot prove that there are no defects left undiscov-
ered. Of course, as testing continues, we reduce the likelihood of defects that remain
undiscovered, but eventually a form of Zeno
’s paradox takes hold. Each additional
test run may cut the risk of a remaining defect in half, but only an infinite number of
tests can cut the risk down to zero with such a mathematical series.
That said, testers should not despair or let the perfect be the enemy of the good.
While testing can never prove that the software works, it can reduce the remaining
level of risk to product quality to an acceptable level, as mentioned before. In any
endeavour worth doing, there is some risk. Software projects
– and software testing –
are endeavours worth doing.
Debugging The process
of finding, analyzing and
removing the causes of
failures in software.
Confirmation testing
(re-testing) Testing that
runs test cases that failed
the last time they were
run, in order to verify the
success of corrective
actions. [Note: While the
Glossary uses re-testing as
the preferred term, this
preference is out of step
with ordinary usage and
with the actual English-
language definition of
‘re-testing’.]
Test strategy A high-
level description of the
test levels to be
performed and the
testing within those levels
for an organization or
program (one or more
projects).
Section 3 Seven Testing Principles
9


1.3.2 Exhaustive testing is impossible
This principle is closely related to the previous principle. For any real-sized system,
anything beyond the trivial software constructed in first-year software engineering
courses, the number of possible test cases is either infinite or so close to infinite as to
be practically innumerable.
Infinity is a tough concept for the human brain to comprehend or accept, so let
’s
use a couple of examples. One of our clients mentioned that they had calculated the
number of possible internal data value combinations in the Unix operating system as
greater than the number of known molecules in the universe by four orders of
magnitude. They further calculated that, even with their fastest automated tests, just
T A B L E 1 . 1
Testing principles
Principle 1:
Testing shows
presence of
defects
Testing can show that defects are present, but cannot prove
that there are no defects. Testing reduces the probability of
undiscovered defects remaining in the software but, even if
no defects are found, it is not a proof of correctness.
Principle 2:
Exhaustive
testing is
impossible
Testing everything (all combinations of inputs and
preconditions) is not feasible except for trivial cases. Instead
of exhaustive testing, risk analysis and priorities should be
used to focus testing efforts.
Principle 3:
Early testing
To find defects early, testing activities shall be started as early as
possible in the software or system development life cycle,
and shall be focused on defined objectives.
Principle 4:
Defect
clustering
Testing effort shall be focused proportionally to the expected
and later observed defect density of modules. A small
number of modules usually contains most of the defects
discovered during pre-release testing, or is responsible for
most of the operational failures.
Principle 5:
Pesticide
paradox
If the same tests are repeated over and over again, eventually
the same set of test cases will no longer find any new
defects. To overcome this
‘pesticide paradox’, test cases
need to be regularly reviewed and revised, and new and
different tests need to be written to exercise different parts
of the software or system to find potentially more defects.
Principle 6:
Testing is
context
dependent
Testing is done differently in different contexts. For example,
safety-critical software is tested differently from an
e-commerce site.
Principle 7:
Absence-of-
errors
fallacy
Finding and fixing defects does not help if the system built is
unusable and does not fulfil the users
’ needs and
expectations.
Exhaustive testing
(complete testing) A
test approach in which
the test suite comprises
all combinations of input
values and preconditions.
10
Chapter 1 Fundamentals of testing


to test all of these internal state combinations would require more time than the
current age of the universe. Even that would not be a complete test of the operating
system; it would only cover all the possible data value combinations.
So, as mentioned in section 1.1, we are confronted with a big, infinite cloud of
possible tests; we must select a subset from it. One way to select tests is to wander
aimlessly in the cloud of tests, selecting at random, until we run out of time. While
there is a place for automated random testing, by itself it is a poor strategy. We
’ll
discuss testing strategies further in Chapter 5, but for the moment let
’s look at two.
One strategy for selecting tests is risk based testing. In risk based testing, we have a
cross-functional team of project and product stakeholders perform a special type of
risk analysis. In this analysis, stakeholders identify risks to the quality of the system,
and assess the level of risk (often using likelihood and impact) associated with each
risk item. We focus the test effort based on the level of risk, using the level of risk to
determine the appropriate number of test cases for each risk item, and also to sequence
the test cases.
Another strategy for selecting tests is requirements based testing. In requirements
based testing, testers analyze the requirements specification to identify test conditions.
These test conditions inherit the priority of the requirement they derive from. We
focus the test effort based on the priority to determine the appropriate number of test
cases for each requirement, and also to sequence the test cases.
1.3.3 Early testing
This principle tells us that we should start testing as early as possible in order to find
as many defects as possible. In addition, since the cost of finding and removing a
defect increases the longer that defect is in the system, early testing also means we
should minimize the cost of removing defects.
So, the first principle tells us that we can
’t find all the bugs, but rather can only
find some percentage of them. The second principle tells us that we can
’t run every
possible test. The third principle tells us to start testing early. What can we conclude
when we put these three principles together?
Imagine that you have a system with 1000 defects. Suppose we wait until the
very end of the project and run one level of testing, system test. You find and fix
90% of the defects. That still leaves 100 defects, which presumably will escape to
the customers or users.
Instead, suppose that you start testing early and continue throughout the lifecycle.
You perform requirements reviews, design reviews, and code reviews. You perform
unit testing, integration testing, and system testing. Suppose that, during each test
activity, you find and remove only 45% of the defects, half as effective as the previous
system test level. Nevertheless, at the end of the process, less than 30 defects remain.
Even though each test activity was only 45% effective at finding defects, the overall
sequence of activities was 97% effective.
In addition, defects removed early cost less to remove. Further, since much of the cost
in software engineering is associated with human effort, and since the size of a project
team is relatively inflexible once that project is underway, reduced cost of defects also
means reduced duration of the project. That situation is shown graphically in Figure 1.3.
Now, this type of cumulative and highly efficient defect removal only works if each
of the test activities in the sequence is focused on different, defined objectives. If we
simply test the same test conditions over and over, we won
’t achieve the cumulative
effect, for reasons we
’ll discuss in a moment.
Section 3 Seven Testing Principles 11


1.3.4 Defect clustering
This principle relates to something we discussed previously, that relying entirely
on the testing strategy of a random walk in the infinite cloud of possible tests is
relatively weak. Defects are not randomly and uniformly distributed throughout
the software under test. Rather, defects tend to be found in clusters, with 20% (or
less) of the modules accounting for 80% (or more) of the defects. In other words,
the defect density of modules varies considerably. While controversy exists about
why defect clustering happens, the reality of defect clustering is well-established.
It was first demonstrated in studies performed by IBM in the 1960s [Jones 2008].
We continue to see evidence of defect clustering in our work with clients.
Defect clustering is helpful to us as testers, because it provides a useful guide. If we
focus our test effort (at least in part) based on the expected (and ultimately observed)
likelihood of finding a defect in a certain area, we can make our testing more effective
and efficient, at least in terms of our objective of finding defects. Knowledge of and
predictions about defect clusters are important inputs to the risk based testing strategy
discussed earlier. In a metaphorical way, we can imagine that bugs are social creatures,
who like to hang out together in the dark corners of the software.
1.3.5 Pesticide paradox
This principle was coined by Boris Beizer [Beizer 1990]. He observed that, just as a
pesticide repeatedly sprayed on a field will kill fewer and fewer bugs each time it
’s
used, so too a given set of tests will eventually stop finding new defects when it
’s re-run
against a system under development or maintenance. If the tests don
’t provide adequate
coverage, this slowdown in defect finding will result in a level of false confidence and
Requir
ements
Defect
Removed
Design
Code/Unit T
est
Integration T
est
Time Savings of Early
Defect Removal
System T
est
F I G U R E 1 . 3
Time savings of early defect removal
12
Chapter 1 Fundamentals of testing


excessive optimism among the project team. The air will be let out of the balloon once
the system is released to customers and users, though.
Using the right test strategies is the first step towards achieving adequate coverage.
However, no strategy is perfect. You should plan to regularly review the test results
during the project, and revise the tests based on your findings. In some cases, you need
to write new and different tests to exercise different parts of the software or system.
These new tests can lead to discovery of previously-unknown defect clusters, which is a
good reason not to wait until the end of the test effort to review your test results and
evaluate the adequacy of test coverage.
The pesticide paradox is important when implementing the multilevel testing
discussed previously in regards to the principle of early testing. Simply repeating our
tests of the same conditions over and over will not result in good cumulative defect
detection. However, when used properly, each type and level of testing has its own
strengths and weaknesses in terms of defect detection, and collectively we can
assemble a very effective sequence of defect filters from them. After such a sequence
of complementary test activities, we can be confident that the test coverage set is
adequate, and that the remaining level of risk is acceptable.
1.3.6 Testing is context dependent
Our safety-critical clients test with a great deal of rigor and care
– and cost. When
lives are at stake, we must be extremely careful to minimize the risk of undetected
defects. Our clients who release software on the web, such as e-commerce sites, can
take advantage of the possibility to quickly change the software when necessary,
leading to a different set of testing challenges
– and opportunities. If you tried to apply
safety-critical approaches to an e-commerce site, you might put the company out of
business; if you tried to apply e-commerce approaches to safety-critical software, you
could put lives in danger. So the context of the testing influences how much testing
we do and how the testing is done.
1.3.7 Absence-of-errors fallacy
Throughout this section, we
’ve expounded the idea that a sequence of test activities,
started early, targeting specific and diverse objectives and areas of the system, can
effectively and efficiently find
– and help a project team to remove – a large
percentage of the defects. Surely that
’s all which is required to achieve project
success?
Sadly, it is not. Many systems have been built which failed in user acceptance testing
or in the marketplace. Some of these systems failed due to a high level of defects, such as
the Apple Newton. However, some systems had very low levels of defects, yet still failed.
Consider desktop computer operating systems. In the 1990s, as competition peaked
for dominance of the PC operating system market, Unix and its variants had higher
levels of quality than DOS and Windows. However, 20 years on, Windows dominates
the desktop marketplace. One major reason is that Unix and its variants were too
difficult for most users in the early 1990s.
Perhaps you are wondering where this leaves Apple. If usability is important, why
is the Mac
’s share of the desktop marketplace so low, given the MacOS reputation for
ease-of-use? The problem lies in Apple
’s failure to optimize MacOS for enterprise and
large-company use. Certain features treasured by system administrators are not present
in MacOS.
Section 3 Seven Testing Principles 13


Macs also suffer from a major problem, which, while not related to software
quality, creates an insurmountable obstacle for many CIOs and CFOs: unit price. With
organizations forced to refresh their desktop systems anywhere from two to three times
a decade, and with many large enterprises owning thousands upon thousands of
desktop systems, spending even $100 more than necessary on commoditized computer
hardware is simply a non-starter, no matter how well the system works.
1 . 4
F U N D A M E N T A L T E S T P R O C E S S
SYLLABUS LEARNING OBJECTIVES FOR
1.4 FUNDAMENTAL TEST PROCES S (K1)
LO-1.4.1 Recall the five fundamental test activities and respective tasks
from planning to closure (K1)
In this section, we will describe the fundamental test process and activities. These
start with test planning and continue through to test closure. For each part of the test
process, we
’ll discuss the main tasks of each test activity.
In this section, you
’ll also encounter the glossary terms coverage (test coverage),
exit criteria, incident, regression testing, test approach, test basis, test condition,
test data, test execution, test log, test monitoring, test plan, test procedure, test
suite, test summary report, and testware.
In section 1.2, we had an overview of testing activities throughout the lifecycle,
going beyond the usual understanding of testing as consisting simply of test execution.
Certainly, test execution is the most visible testing activity. However, as we saw in
section 1.3, effective and efficient testing requires properly planned and executed test
approaches, with tests designed and implemented to cover the proper areas of the
system, executed in the right sequence, and with their results reviewed regularly.
To help testers maximize the likelihood of such effective and efficient software
testing, the ISTQB has defined and published a fundamental test process consisting
of the following main activities:
l
Planning and control
l
Analysis and design
l
Implementation and execution
l
Evaluating exit criteria and reporting
l
Test closure activities
These activities are logically sequential, in the sense that tasks within each activity
often create the pre-conditions or precursor work products for tasks in subsequent
activities. However, in many cases, the activities in the process may overlap or take
place concurrently, provided that these dependencies are fulfilled.
You should not mistake the name given above, fundamental test process, to mean
‘the one and only way to test which never alters from one project to another and
always contains these and only these test tasks
’. We have found that most of these
activities, and many of the tasks within these activities, are carried out in some form or
another on most successful test efforts. However, you should expect to have to tailor
Test execution The
process of running a test
on the component or
system under test,
producing actual result(s).
Test approach The
implementation of the
test strategy for a specific
project. It typically
includes the decisions
made that follow based
on the (test) project
’s
goal and the risk
assessment carried out,
starting points regarding
the test process, the test
design techniques to be
applied, exit criteria and
test types to be
performed.
14
Chapter 1 Fundamentals of testing


the fundamental test process, its main activities, and the constituent tasks, based on the
organizational, project, process, and product needs, constraints, and other contextual
realities.
1.4.1 Test planning and control
As mentioned in section 1.2, planning involves defining the overall strategic and
tactical objectives of testing, as well as discovering and specifying the specific test
activities required to satisfy those objectives and the general mission of testing.
Metaphorically, you can think of test planning as similar to figuring out how to get
from one place to another. For small, simple, and familiar projects, finding the route
merely involves taking an existing map, highlighting the route, and jotting down the
specific directions. For large, complex, or new projects, finding the route can involve a
sophisticated process of creating a new map, exploring unknown territory, and blazing
a fresh trail.
To continue our metaphor, even with the best map and the clearest directions,
getting from one place to another involves careful attention, watching the dashboard,
minor (and sometimes major) course corrections, talking with our companions about
the journey, looking ahead for trouble, tracking progress towards the ultimate destina-
tion, and coping with finding an alternate route if the road we wanted is blocked. So, in
test control we continuously compare actual progress against the plan, adjust the plan,
report the test status and any necessary deviations from the plan, monitor test activities,
and take whatever actions are necessary to meet the mission and objectives of the
project. To some extent, test control involves re-planning, which should take into
account the feedback from these test monitoring and control activities.
We
’ll discuss test planning and control tasks in more detail in Chapter 5.
1.4.2 Test analysis and design
In test analysis and design, we transform the more general testing objectives defined
in the test plan into tangible test conditions and test cases. The way in which and
degree to which the test conditions and test cases are made tangible
– that is to say,
specifically documented
– depends on the needs of the testers, the expectations of the
project team, any applicable regulations, and other considerations. Test analysis and
design is discussed in more detail in Chapter 4.
During test analysis and design activities, we may have to perform the following
major tasks:
l
Review the test basis. We can say colloquially that the test bases are those
documents upon which we base our tests. The test basis can include
requirements and design specifications, risk analysis reports, the system design
and architecture, and interface specifications. The Foundation syllabus also
defines the software integrity level as a possible test basis. The software integrity
level is the degree to which software must comply with a set of stakeholder-
selected characteristics, such as software complexity, the risk assessment, the
required safety and security levels, desired performance and reliability, or cost,
which reflect the importance of the software to its stakeholders.
l
Evaluate the testability of the test basis and test objects, which can result in
reporting on any issues that might impede testing and adjusting the test plan to
deal with these issues. This task often occurs as part of or in parallel with the
Test plan A document
describing the scope,
approach, resources and
schedule of intended test
activities. It identifies
among others test items,
the features to be tested,
the testing tasks, who will
do each task, degree of
tester independence, the
test environment, the test
design techniques and
entry and exit criteria to be
used, and the rationale for
their choice, and any risks
requiring contingency
planning. It is a record of
the test planning process.
Test monitoring A test
management task that
deals with the activities
related to periodically
checking the status of a
test project. Reports are
prepared that compare
the actuals to that which
was planned.
Test condition An item
or event of a component
or system that could be
verified by one or more
test cases, e.g. a
function, transaction,
feature, quality attribute,
or structural element.
Test basis All documents
from which the
requirements of a
component or system can
be inferred. The
documentation on which
the test cases are based. If a
document can be amended
only by way of formal
amendment procedure,
then the test basis is called a
frozen test basis.
Section 4 Fundamental Test Process 15


review of the test basis, but it
’s important to see these as distinct so that this
important task is not forgotten.
l
Identify and prioritize specific test conditions based on analysis of the risks, test
items, the requirements and design specifications, and the behaviour and structure
of the software.
l
Design and prioritize high level (i.e. abstract or logical) test cases. Such test cases
give general guidance on inputs and expected results, but do not include the
specific inputs or expected results. For example, a high level test case might
specify testing the checkout function of an e-commerce application, but would not
include the particular inputs for specific fields or the exact appearance of screens
after the inputs are submitted.
l
Identify the necessary test data to support the test conditions and test cases as
they are identified and designed.
l
Design the test environment, including the set-up and any required infrastructure
and tools.
l
Create traceability between the test basis documents and the test cases. This
traceability should be bi-directional so that we can check which test basis
elements go with which test cases (and vice versa) and determine the degree of
coverage of the test basis by the test cases. Traceability is also very important for
maintenance testing, as we
’ll discuss in Chapter 2.
Which of these specific tasks applies to a particular project depends on various
contextual issues relevant to the project, which are discussed further in Chapter 5.
1.4.3 Test implementation and execution
In test implementation and execution, we specify test procedures (or test scripts). This
involves combining the test cases in a particular order, as well as including any other
information needed for test execution. This involves transforming the high level (or
abstract or logical) test cases into low level (concrete) test cases, which may be done more
formally and written into a test script, or it may be done
‘on the fly’ as a tester is executing
tests from a list of high level test conditions. Test implementation also involves setting up
the test environment. During test execution, of course, we run the tests.
During test implementation, we may have to perform the following major tasks:
l
Finalize, implement and prioritize the test cases.
l
Identify and create specific test data, which can take the form of inputs, data
resident in databases and other data repositories, and system configuration data.
l
Develop and prioritize test procedures, often using the test basis and test project
constraints to achieve the optimal order of test execution. Once we have
prioritized test procedures, we may need to create test suites from the test
procedures for efficient test execution.
l
If automation is to occur, prepare test harnesses and write automated test scripts.
Test automation is discussed in Chapter 6.
l
Verify that the test environment has been set up correctly, ideally before test
execution starts so that test environment issues do not impede test progress.
l
Verify and update the bi-directional traceability prepared previously, to make
certain that adequate coverage exists.
Test data Data that exists
(for example, in a database)
before a test is executed,
and that affects or is
affected by the component
or system under test.
Coverage (test
coverage) The degree,
expressed as a percentage,
to which a specified
coverage item has been
exercised by a test suite.
Test procedure
specification (test
procedure, test script,
manual test script) A
document specifying a
sequence of actions for
the execution of a test.
Test suite A set of several
test cases for a component
or system under test,
where the post condition
of one test is often used as
the precondition for the
next one.
16
Chapter 1 Fundamentals of testing


Ideally, all of these tasks are completed before test execution begins, because
otherwise precious, limited test execution time can be lost on these types of preparatory
tasks. One of our clients reported losing as much as 25% of the test execution period to
what they called
‘environmental shakedown’, which turned out to be comprised almost
entirely of test implementation activities that could have been completed before the
software was delivered.
During test execution, we may have to perform the following major tasks:
l
Execute the test procedures manually or with the use of automated test
execution tools, according to the planned sequence.
l
Compare actual results with expected results, observing where the actual and
expected results differ. These anomalies should be logged as incidents for
further investigation.
l
Log the outcome of test execution. This includes not only the anomalies
observed and the pass/fail status of the test cases, but also the identities and
versions of the software under test, test tools and testware.
l
Analyze the incidents in order to establish their cause. Causes of incidents can
include defects in the code, in which case we have a failure. Other incidents
result from defects in specified test data, in the test document, or simply a
mistake in the way the test was executed. Report the incidents as appropriate.
Some organizations track test defects (i.e. defects in the tests themselves) as
incidents, while others do not. Incident analysis and reporting is discussed in
Chapter 5.
l
As necessary, repeat test activities when actions are taken to resolve
discrepancies. For example, we might need to re-run a test that previously
failed in order to confirm a fix (confirmation testing). We might need to run a
corrected test. We might also need to run additional, previously-executed tests
to see whether defects have been introduced in unchanged areas of the
software or to see whether a fixed defect now makes another defect apparent
(regression testing).
As before, which of these specific tasks applies to a particular project depends on
various contextual issues relevant to the project, which are discussed further in Chapter 5.
1.4.4 Evaluating exit criteria and reporting
In evaluating exit criteria and reporting, we assess test execution against the
objectives which we defined in the test plan. We should do so for each test level
(as discussed in Chapter 2, Section 2).
During evaluation of exit criteria and reporting, we may have to perform the
following major tasks:
l
Check the test logs gathered during test execution against the exit criteria
specified in test planning.
l
Assess if more tests are needed or if the exit criteria specified should be changed.
l
Write a test summary report for stakeholders, as discussed in Chapter 5.
The specific evaluation and reporting tasks and deliverables that apply to a particular
project depends on various contextual issues relevant to the project, which are dis-
cussed further in Chapter 5.
Incident Any event
occurring that requires
investigation.
Testware Artifacts
produced during the test
process required to plan,
design, and execute tests,
such as documentation,
scripts, inputs, expected
results, set-up and clear-
up procedures, files,
databases, environment,
and any additional
software or utilities used
in testing.
Regression
testing Testing of a
previously tested
program following
modification to ensure
that defects have not
been introduced or
uncovered in unchanged
areas of the software, as
a result of the changes
made. It is performed
when the software or its
environment is changed.
Exit criteria The set of
generic and specific
conditions, agreed upon
with the stakeholders, for
permitting a process to
be officially completed.
The purpose of exit
criteria is to prevent a
task from being
considered completed
when there are still
outstanding parts of the
task which have not been
finished. Exit criteria are
used to report against
and to plan when to stop
testing.
Test log A chronological
record of relevant details
about the execution of
tests.
Section 4 Fundamental Test Process 17


1.4.5 Test closure activities (K1)
In test closure, we collect data from completed test activities to consolidate experi-
ence, testware, facts and numbers. Test closure activities should occur at major project
milestones. These can include when a software system is released, a test project is
completed (or cancelled), a milestone has been achieved, or a maintenance release has
been completed, though the specific milestones that involve closure activities should
be specified in the test plan.
During test closure, we may have to perform the following major tasks:
l
Check which planned deliverables have been delivered, and possibly create
any deliverables we might have missed.
l
Ensure that all incident reports are resolved, and possibly log change requests
for any that remain open.
l
Document the acceptance of the system, particularly as part of the closure of
the user acceptance test level.
l
Finalize and archive testware, the test environment and the test infrastructure
for later reuse.
l
Hand over the testware to the maintenance organization, if that is a different
group.
l
Analyze lessons learned to determine changes needed for future releases and
projects (i.e. perform a retrospective).
l
Use the information gathered to improve test maturity, especially as an input
to test planning for future projects.
The degree and extent to which test closure activities occur, and which specific
test closure activities do occur, depends on various contextual issues relevant to the
project, which are discussed further in Chapter 5.
1 . 5
T H E P S Y C H O L O G Y O F T E S T I N G
SYLLABUS LEARNING OBJECTIVES FOR 1.5
TH E PSYCHOLOGY OF TESTING (K2)
LO-1.5.1 Recall the psychological factors that influence the success of
testing (K1)
LO-1.5.2 Contrast the mindset of a tester and of a developer (K2)
In this section, we
’ll discuss the various psychological factors that influence testing
and its success. These include clear objectives for testing, the proper roles and balance
of self-testing and independent testing, clear, courteous communication and feedback
on defects. We
’ll also contrast the mindset of a tester and of a developer.
You
’ll find a few syllabus terms in this section, error guessing, indepen-
dence of testing and test policy.
As mentioned earlier, the ISTQB definition of software testing includes both
dynamic testing and static testing. Let
’s review the distinction again. Dynamic software
Test summary report A
document summarizing
testing activities and
results. It also contains an
evaluation of the
corresponding test items
against exit criteria.
18
Chapter 1 Fundamentals of testing


testing involves actually executing the software or some part of it, such as checking
an application-produced report for accuracy or checking response time to user input.
Static software testing does not execute the software but uses two possible
approaches: automated static analysis on the code (e.g. evaluating its complexity) or
on a document (e.g. to evaluate the readability of a use case) or reviews of code or
documents (e.g. to evaluate a requirement specification for consistency, ambiguity and
completeness).
While these are very different types of activities, they have in common their
ability to find defects. Static testing finds defects directly, while dynamic testing
finds evidence of a defect through a failure of the software to behave as expected.
Either way, people carrying out static or dynamic tests must be focused on the
possibility
– indeed, the high likelihood in many case – of finding defects. Indeed
many times finding defects is a primary objective of static and dynamic testing
activities.
That mindset is quite different from the mindset that a business analyst,
system design, architect, database administrator, or programmer must bring to
creating the work products involved in developing software. While the testers
(or reviewers) must assume that the work product under review or test is defective
in some way
– and it is their job to find those defects – the people developing
that work product must have confidence that they understand how to do so
properly.
This confidence in their understanding is in some sense necessary for developers.
They cannot proceed without it, but at the same time this confidence creates what
the Foundation syllabus refers to as the author bias. Simply put, the author of a work
product has confidence that they have solved the requirements, design, metadata or
code problem, at least in an acceptable fashion; however, strictly speaking, that is
false confidence. As we saw earlier, because human beings are fallible, all software
work products contain defects when initially created, and any one of those defects
could render the work product unfit for use.
While some developers are aware of their author bias when they participate in
reviews and perform unit testing of their own work products, that author bias acts
to impede their effectiveness at finding their own defects. The mental mistakes
that caused them to create the defects remain in their minds in most cases. When
proof-reading our own work, for example, we see what we meant, not what
we put!
In addition, many business analysts, system designers, architects, database admin-
istrators, and programmers do not know the review, static analysis, and dynamic testing
techniques discussed in the Foundation syllabus and this book. While that situation
is gradually changing, much of the self-testing by software work product devel-
opers is either not done or is not done as effectively as it could be. The principles
and techniques in the Foundation syllabus and this book are intended to help either
testers or others to be more effective at finding defects, both their own and those
of others.
A trained independent tester
– or better yet a trained, certified, independent test
team
– can overcome both of these limitations. Independent test teams tend to be
more effective at finding defects and failures. Capers Jones reports that unit testing
by developers tops out at 40 to 50% defect detection effectiveness, while we
regularly find independent test teams scoring 85% defect detection effectiveness.
Indeed, some of our best clients, those with trained, certified, independent test
teams, regularly score defect detection effectiveness of 95% and above.
Section 5 The Psychology of Testing 19


To be most effective at finding defects, a tester needs the right mindset. Looking
for defects and failures in a system calls for people with the following traits:
l
Curiosity. Good testers are curious about why systems behave the way they do
and how systems are built. When they see unexpected behaviour, they have a
natural urge to explore further, to isolate the failure, to look for more
generalized problems, and to gain deeper understanding.
l
Professional pessimism. Good testers expect to find defects and failures. They
understand human fallibility and its implications for software development.
(However, this is not to say that they are negative or adversarial, as we
’ll
discuss in a moment.)
l
A critical eye. Good testers couple this professional pessimism with a natural
inclination to doubt the correctness of software work products and their
behaviours as they look at them. A good tester has, as her personal slogan,
‘If in doubt, it’s a bug’.
l
Attention to detail. Good testers notice everything, even the smallest details.
Sometimes these details are cosmetic problems like font-size mismatches,
but sometimes these details are subtle clues that a serious failure is about to
happen. This trait is both a blessing and a curse. Some testers find that they
cannot turn this trait off, so they are constantly finding defects in the real
world
– even when not being paid to find them.
l
Experience. Good testers not only know a defect when they see one, they
also know where to look for defects. Experienced testers have seen a veritable
parade of bugs in their time, and they leverage this experience during all
types of testing, especially experience-based testing such as error guessing
(see Chapter 4).
l
Good communication skills. All of these traits are essential, but, without
the ability to effectively communicate their findings, testers will produce
useful information that will
– alas – be put to no use. Good communicators
know how to explain the test results, even negative results such as serious
defects and quality risks, without coming across as preachy, scolding or
defeatist.
A good independent tester has the skills, the training, the certification, and the
mindset of a professional tester, and of these four the most important
– and perhaps
the most elusive
– is the mindset. The best testers continuously strive to attain a
more professional mindset, and it is a lifelong journey.
All of this is not to say that software work product developers
– business
analysts, system designers, architects, database administrators, and programmers

should not review and test their own work. They certainly should. Quality is
everyone
’s responsibility. The presence of an independent test team or single tester
is not a signal to developers to abdicate their professional responsibilities to produce
the best quality work products they can. Abdicating responsibility for quality and
saying,
‘Hurrah, we have an independent test team now, so we don’t have to test our
own work, we can just let the testers find all the bugs
’, is a known worst-practice of
software development.
When highly-defective, barely functioning software is delivered to independent
test teams in higher levels of testing such as system test or system integration test,
such a level of bugginess often overwhelms the testing process and results in defect
detection effectiveness much lower than 85%. Since more defects are delivered in
Error guessing A test
design technique where
the experience of the
tester is used to
anticipate what defects
might be present in the
component or system
under test as a result of
errors made, and to
design tests specifically to
expose them.
20
Chapter 1 Fundamentals of testing


the first place, this situation results in a much higher number of defects delivered to
users and customers.
So, developer self-testing has an important role to play. Business analysts have
a deep understanding of the problem the software is to solve. Designers, system
architects, and database administrators have a deep understanding of how the system
fits together, and fits with other important systems such as databases. Programmers
have a deep understanding of the implementation and low-level design of the soft-
ware. For this reason, business analysts, system designers, architects, database admin-
istrators, and programmers should participate in reviews of their work products and
carry out static analysis of their work products. In addition, unit and component
integration testing is usually carried out by programmers, though independent testers
can play a role in these test levels.
It
’s also important to understand that independence of testing exists on a spectrum
running from lower to higher:
l
When tests are designed and possibly even executed by the software work
product developer who wrote the work product, this is a low level of
independence. As mentioned above, this kind of testing is necessary, but we
should have no illusions about achieving a high level of defect detection
effectiveness with such tests.
l
When tests are designed by someone other than the author, but someone
from within the development team, this does reduce the author bias to
some extent. However, group-think can exist within such teams, limiting
the independence of thought and the effectiveness of test design. In addition,
as noted above, there may be a lack of knowledge about how to test well.
l
When tests are designed by people from a different organizational group,
such as an independent test team or tester who specialize in usability or
performance testing, this is a high level of independence. As mentioned
earlier, such test teams can be highly effective defect detectors.
l
When tests are designed and executed by people from a different organization
or company, such as an outsource testing service provider or system
certification body (e.g. the FDA for pharmaceutical systems), this provides
the highest level of independence.
We
’ll revisit this issue of tester independence in Chapter 5.
Independence by itself doesn
’t guarantee successful testing. Testing activities
need clearly defined objectives, too, as people involved in testing will tend to look
to such objectives for direction during planning and other activities in the test
process. For example, if the main objective of user acceptance testing is to gain
confidence that the most-used business processes are working smoothly, a tester
who thinks the main objective is to find defects may concentrate on obscure areas
of the system instead of the main user paths. The tester may think they are doing
the right thing, but in fact they are not. This is why test objectives should be
clearly defined in a testing policy, ideally with effectiveness and efficiency
measures and goals for each objective, and these goals clearly communicated to
the testers.
Now, as we mentioned earlier, independence from the developers doesn
’t mean
an adversarial relationship with them. In fact, such a relationship is toxic
– often
fatally so
– to a test team’s effectiveness. For example, if testers are not careful about
the way they communicate, developers may perceive the identification of defects
Independence of
testing Separation of
responsibilities, which
encourages the
accomplishment of
objective testing.
Test policy A high level
document describing the
principles, approach and
major objectives of the
organization regarding
testing.
Section 5 The Psychology of Testing 21


(in reviews) and failures (during test execution) as a criticism of their work and in
fact of them personally. This can result in a perception that testing is a destructive
activity.
It is a particular problem when testers revel in being the bearer of bad news. For
example, one tester made a revealing
– and not very flattering – remark during an
interview with one of the authors. When asked what he liked about testing, he responded,
‘I like to catch the developers’. He went on to explain that, when he found a defect in
someone
’s work, he would go and demonstrate the failure on the programmer’s work-
station. He said that he made sure that he found at least one defect in everyone
’s work on
a project, and went through this process of ritually humiliating the programmer with each
and every one of his colleagues. When asked why, he said,
‘I want to prove to everyone
that I am their intellectual equal
’. This person, while possessing many of the skills and
traits one would want in a tester, had exactly the wrong personality to be a truly
professional tester.
Instead of seeing themselves as their colleagues
’ adversaries or social inferiors
out to prove their equality, testers must see themselves as teammates. In their special
role, testers provide essential services within the development organization. They
should ask themselves,
‘Who are the stakeholders in the work that I do as a tester?’
Having identified these stakeholders, they should ask each stakeholder group,
‘What
services do you want from the testing team, and how well are we doing?

While the specific services are not always defined, it is common that mature
development team members see testing as a constructive activity that helps the
organization manage its quality risks. In addition, wise developers know that study-
ing their mistakes and the defects they have introduced is the key to learning how to
get better. Further, smart software development managers understand that finding
and fixing defects during testing not only reduces the level of risk to the quality of
the product, it also saves time and money when compared to finding defects in
production. Working with stakeholders to define these services is an essential part of
defining the objectives, measures and goals for the test policy document mentioned
earlier.
Such clearly defined objectives and goals, combined with constructive styles of
communication on the part of test professionals, will help to avoid any negative
personal or group dynamics between testers and their colleagues in the development
team. Whenever defects are found by independent testers, whether during reviews,
static analysis, or dynamic testing, true testing professionals distinguish themselves
by demonstrating good interpersonal skills. True testing professionals communicate
facts about defects, progress and risks in a constructive way. While this is not
necessary, we have noticed that many of consummate testing professionals have
business analysts, system designers, architects, programmers, and other developers
with whom they work as close personal friends.
Certainly, having good communication skills is a complex topic, well beyond the
scope of a book on fundamental testing techniques. However, we can give you some
basics for good communication with your development teammates:
l
First of all, remember to think of your colleagues as teammates, not as
opponents or adversaries. The way you regard people has a profound effect on
the way you treat them. You don
’t have to think in terms of kinship or
achieving world peace, but you should keep in mind that everyone on the
development team has the common goal of delivering a quality system, and
must work together to accomplish that.
22
Chapter 1 Fundamentals of testing


l
Next, recognize that your colleagues have pride in their work, just as you do,
and as such you owe them a tactful communication about defects you have
found. It
’s not really any harder to communicate your findings, especially
the potentially embarrassing findings, in a neutral, fact-focused way. In fact,
you
’ll find that, if you avoid criticizing people and their work products, but
instead keep your written and verbal communications objective and factual,
you also will avoid a lot of unnecessary conflict and drama with your
colleagues.
l
In addition, before you communicate these potentially embarrassing
findings, mentally put yourself in the position of the person who created
the work product. How are they going to feel about this information? How
might they react? What can you do to help them get the essential message
that they need to receive without provoking a negative emotional reaction
from them?
l
Finally, keep in mind the psychological element of cognitive dissonance.
Cognitive dissonance is a defect
– or perhaps a feature – in the human brain
that makes it difficult to process unexpected information, especially bad news.
So, while you might have been clear in what you said or wrote, the person on
the receiving end might not have clearly understood. Cognitive dissonance is a
two-way street, too, and it
’s quite possible that you are misunderstanding
someone
’s reaction to your findings. So, before assuming the worst about
someone and their motivations, instead confirm that the other person has
understood what you have said and vice versa.
The softer side of software testing is often the harder side to master. A tester may
have adequate or even excellent technique skills and certifications, but if they do not
have adequate interpersonal and communication skills, they will not be an effective
tester. Such soft skills can be improved with training and practice.
1 . 6
C O D E O F E T H I C S
SYLLABUS LEARNING OBJECTIVES FOR 1 .6 CODE OF
ETHICS
Note: At this time, no learning objectives are provided for this section,
nor is an overall section K-level defined. You should remember the code
of ethics.
In this section, we
’ll briefly introduce you to the ISTQB code of ethics. There are no
Syllabus terms for this section.
As a software tester, as in any other profession, you will from time to time
encounter ethical challenges. On the one hand, you are likely to have access to
confidential and privileged information, or to be in the position to harm someone
’s
interests. On the other hand, you are likely to have opportunities to advance good
causes. So, a code of ethics will help guide your decisions and choose the best-
possible outcome.
The ISTQB has derived its code of ethics from the ACM and IEEE code of
ethics. The ISTQB code of ethics is shown in Table 1.2.
Section 6 Code of Ethics 23


T A B L E 1 . 2
ISTQB Code of Ethics
PUBLIC
Certified software testers shall act consistently with the public interest.
CLIENT AND EMPLOYER
Certified software testers shall act in a manner that is in the best interests of their
client and employer, consistent with the public interest.
PRODUCT
Certified software testers shall ensure that the deliverables they provide (on the
products and systems they test) meet the highest professional standards
possible.
JUDGMENT
Certified software testers shall maintain integrity and independence in their
professional judgment.
MANAGEMENT
Certified software test managers and leaders shall subscribe to and promote an
ethical approach to the management of software testing.
PROFESSION
Certified software testers shall advance the integrity and reputation of the
profession consistent with the public interest.
COLLEAGUES
Certified software testers shall be fair to and supportive of their colleagues, and
promote cooperation with software developers.
SELF
Certified software testers shall participate in lifelong learning regarding the
practice of their profession and shall promote an ethical approach to the
practice of the profession.
24
Chapter 1 Fundamentals of testing


C H A P T E R R E V I E W
Let
’s review what you have learned in this chapter.
From Section 1.1, you should now be able to explain why testing is necessary
and support that explanation with examples and evidence. You should be able to
give examples of negative consequences of a software defect or bug for people,
companies, and the environment. You should be able to contrast a defect with its
symptoms, the anomalies caused by defects. You should be able to discuss the ways
in which testing fits into and supports higher quality. You should know the glossary
terms bug, defect, error, fails (false-fail result, false-positive result), failure,
fault, mistake, passed (false-negative result, false-pass result), quality and risk.
From Section 1.2, you should now know what testing is. You should be able to
remember the common objectives of testing. You should be able to describe how
testing can find defects, provide confidence and information and prevent defects.
You should know the glossary terms confirmation testing, debugging, re-testing,
requirement, review, test case, test control, test design specification, testing and
test objective.
You should be able to explain the fundamental principles of testing, discussed in
Section 1.3. You should know the glossary terms complete testing, exhaustive
testing and test strategy.
From Section 1.4, you should now recognize the fundamental test process. You
should be able to recall the main testing activities related to test planning and control,
analysis and design, implementation and execution, evaluating exit criteria and
reporting, and test closure. You should know the glossary terms coverage (test
coverage), exit criteria, incident, regression testing, test approach, test basis, test
condition, test data, test execution, test log, test monitoring, test plan, test
procedure, test suite, test summary report and testware.
From Section 1.5, you now should be able to explain the psychology of testing
and how people influence testing success. You should recall the importance of clear
objectives, the right mix of self-testing and independent testing and courteous,
respectful communication between testers and others on the project team, especially
about defects. You should be able to explain and contrast the mindsets of testers and
programmers and why these differences can lead to conflicts. You should know the
glossary terms error guessing, independence of testing and test policy.
Finally, from section 1.6, you should understand the ISTQB Code of Ethics.
Chapter Review 25


S A M P L E E X A M Q U E S T I O N S
Question 1 A company recently purchased a
commercial off-the-shelf application to automate their
bill-paying process. They now plan to run an
acceptance test against the package prior to putting it
into production. Which of the following is their most
likely reason for testing?
a. To build confidence in the application.
b. To detect bugs in the application.
c. To gather evidence for a lawsuit.
d. To train the users.
Question 2 According to the ISTQB Glossary, the
word
‘bug’ is synonymous with which of the
following words?
a. Incident.
b. Defect.
c. Mistake.
d. Error.
Question 3 According to the ISTQB Glossary, a risk
relates to which of the following?
a. Negative feedback to the tester.
b. Negative consequences that will occur.
c. Negative consequences that could occur.
d. Negative consequences for the test object.
Question 4 Ensuring that test design starts during
the requirements definition phase is important to
enable which of the following test objectives?
a. Preventing defects in the system.
b. Finding defects through dynamic testing.
c. Gaining confidence in the system.
d. Finishing the project on time.
Question 5 A test team consistently finds between
90% and 95% of the defects present in the system
under test. While the test manager understands that
this is a good defect-detection percentage for her test
team and industry, senior management and executives
remain disappointed in the test group, saying that the
test team misses too many bugs. Given that the users
are generally happy with the system and that the
failures which have occurred have generally been low
impact, which of the following testing principles is
most likely to help the test manager explain to these
managers and executives why some defects are likely
to be missed?
a. Exhaustive testing is impossible.
b. Defect clustering.
c. Pesticide paradox.
d. Absence-of-errors fallacy.
Question 6 According to the ISTQB Glossary,
regression testing is required for what purpose?
a. To verify the success of corrective actions.
b. To prevent a task from being incorrectly
considered completed.
c. To ensure that defects have not been introduced by
a modification.
d. To motivate better unit testing by the
programmers.
Question 7 Which of the following is most
important to promote and maintain good relationships
between testers and developers?
a. Understanding what managers value about testing.
b. Explaining test results in a neutral fashion.
c. Identifying potential customer work-arounds for
bugs.
d. Promoting better quality software whenever
possible.
Question 8 Which of the statements below is the
best assessment of how the test principles apply
across the test life cycle?
a. Test principles only affect the preparation for
testing.
b. Test principles only affect test execution activities.
c. Test principles affect the early test activities such
as review.
d. Test principles affect activities throughout the test
life cycle.
26
Chapter 1 Fundamentals of testing


CHAPTER TWO
Testing throughout the
software life cycle
T
esting is not a stand-alone activity. It has its place within a software development
life cycle model and therefore the life cycle applied will largely determine how
testing is organized. There are many different forms of testing. Because several
disciplines, often with different interests, are involved in the development life cycle, it
is important to clearly understand and define the various test levels and types. This
chapter discusses the most commonly applied software development models, test levels
and test types. Maintenance can be seen as a specific instance of a development
process. The way maintenance influences the test process, levels and types and how
testing can be organized is described in the last section of this chapter.
2 . 1
S O F T W A R E D E V E L O P M E N T M O D E L S
SYLLABUS LEARNING OBJECTIVES FOR 2 .1 SOFTWARE
DEVELOPMENT MODELS (K2)
LO-2.1.1 Explain the relationship between development, test activities
and work products in the development life cycle, by giving
examples using project and product types. (K2)
LO-2.1.2 Recognize the fact that software development models
must be adapted to the context of project and product
characteristics. (K1)
LO-2.1.3 Recall characteristics of good testing that are applicable to
any life cycle model. (K1)
In this section, we
’ll discuss software development models and how testing fits into
them. We
’ll discuss sequential models, focusing on the V-model approach rather
than the flawed
‘test at the end’ waterfall. We’ll discuss iterative and incremental
types of models such as prototyping, Rapid Application Development (RAD),
Rational Unified Process (RUP) and agile development. We
’ll finish with a discus-
sion of the common aspects of fitting testing into a lifecycle.
As we go through this section, watch for the Syllabus terms agile mani-
festo, agile software development, Commercial Off-The-Shelf (COTS),
incremental development model, integration, iterative development model,
performance, requirement, test level, validation, verification, and V-model.
You
’ll find these terms defined in the glossary.
27


The development process adopted for a project will depend on the project aims and
goals. There are numerous development life cycles that have been developed in order
to achieve different required objectives. These life cycles range from lightweight and
fast methodologies, where time to market is of the essence, through to fully controlled
and documented methodologies where quality and reliability are key drivers. Each of
these methodologies has its place in modern software development and the most
appropriate development process should be applied to each project. The models
specify the various stages of the process and the order in which they are carried out.
The life cycle model that is adopted for a project will have a big impact on the
testing that is carried out. Testing does not exist in isolation; test activities are highly
related to software development activities. It will define the what, where, and when
of our planned testing, influence regression testing, and largely determine which test
techniques to use. The way testing is organized must fit the development life cycle
or it will fail to deliver its benefit. If time to market is the key driver, then the testing
must be fast and efficient. If a fully documented software development life cycle,
with an audit trail of evidence, is required, the testing must be fully documented.
In every development life cycle, a part of testing is focused on verification testing and
a part is focused on validation testing. Verification is concerned with evaluating a work
product, component or system to determine whether it meets the requirements set. In fact,
verification focuses on the question
‘Is the deliverable built according to the specifica-
tion?
’. Validation is concerned with evaluating a work product, component or system to
determine whether it meets the user needs and requirements. Validation focuses on the
question
‘Is the deliverable fit for purpose, e.g. does it provide a solution to the problem?’.
2.1.1 V-model
Before discussing the V-model, we will look at the model which came before it.
The waterfall model (in Figure 2.1) was one of the earliest models to be designed. It
has a natural timeline where tasks are executed in a sequential fashion. We start at
the top of the waterfall with a feasibility study and flow down through the various
project tasks finishing with implementation into the live environment. Design flows
through into development, which in turn flows into build, and finally on into test.
Testing tends to happen towards the end of the project life cycle so defects are
detected close to the live implementation date. With this model it has been difficult
to get feedback passed backwards up the waterfall and there are difficulties if we
need to carry out numerous iterations for a particular phase.
The V-model was developed to address some of the problems experienced using
the traditional waterfall approach. Defects were being found too late in the life cycle,
as testing was not involved until the end of the project. Testing also added lead time
due to its late involvement. The V-model provides guidance that testing needs to
begin as early as possible in the life cycle, which, as we
’ve seen in Chapter 1, is one
of the fundamental principles of structured testing. It also shows that testing is not
only an execution-based activity. There are a variety of activities that need to be
performed before the end of the coding phase. These activities should be carried out
in parallel with development activities, and testers need to work with developers
and business analysts so they can perform these activities and tasks and produce a
set of test deliverables. The work products produced by the developers and business
analysts during development are the basis of testing in one or more levels. By
starting test design early, defects are often found in the test basis documents. A good
practice is to have testers involved even earlier, during the review of the (draft) test
Verification
Confirmation by
examination and
through provision of
objective evidence that
specified requirements
have been fulfilled.
Validation
Confirmation by
examination and through
provision of objective
evidence that the
requirements for a
specific intended use or
application have been
fulfilled.
V-model A framework
to describe the software
development lifecycle
activities from
requirements
specification to
maintenance. The
V-model illustrates how
testing activities can be
integrated into each
phase of the software
development lifecycle.
28
Chapter 2 Testing throughout the software life cycle


basis documents. The V-model is a model that illustrates how testing activities
(verification and validation) can be integrated into each phase of the life cycle.
Within the V-model, validation testing takes place especially during the early stages,
e.g. reviewing the user requirements, and late in the life cycle, e.g. during user
acceptance testing.
Although variants of the V-model exist, a common type of V-model uses four
test levels. The four test levels used, each with their own objectives, are:
l
component testing: searches for defects in and verifies the functioning of
software components (e.g. modules, programs, objects, classes, etc.) that are
separately testable;
l
integration testing: tests interfaces between components, interactions to
different parts of a system such as an operating system, file system and hardware
or interfaces between systems;
l
system testing: concerned with the behaviour of the whole system/product as
defined by the scope of a development project or product. The main focus of
system testing is verification against specified requirements;
l
acceptance testing: validation testing with respect to user needs, requirements, and
business processes conducted to determine whether or not to accept the system.
The various test levels are explained and discussed in detail in Section 2.2.
In practice, a V-model may have more, fewer or different levels of development
and testing, depending on the project and the software product. For example, there
may be component integration testing after component testing and system integra-
tion testing after system testing. Test levels can be combined or reorganized
depending on the nature of the project or the system architecture. For the integration
need, wish,
policy, law
User
requirements
System
requirements
Global
design
Detailed
design
Implementation
Testing
F I G U R E 2 . 1
Waterfall model
Test level A group of
test activities that are
organized and managed
together. A test level is
linked to the
responsibilities in a
project. Examples of test
levels are component
test, integration test,
system test and
acceptance test.
Integration The process
of combining
components or systems
into larger assemblies.
Section 1 Software Development Models 29


of a commercial off-the-shelf (COTS) software product into a system, a purchaser
may perform only integration testing at the system level (e.g. integration to the
infrastructure and other systems) and at a later stage acceptance testing. This
acceptance testing can include both testing of system functions but also testing of
quality attributes such as performance and other non-functional tests. The accep-
tance testing may be done from the perspective of the end user and may also be done
from an operation point of view.
Note that the types of work products mentioned in Figure 2.2 on the left side of
the V-model are just an illustration. In practice they come under many different
names. References for generic work products include the Capability Maturity Model
Integration (CMMi) or the
‘Software life cycle processes’ from ISO/IEC 12207. The
CMMi is a framework for process improvement for both system engineering and
software engineering. It provides guidance on where to focus and how, in order to
increase the level of process maturity [Chrissis et al. 2004]. ISO/IEC 12207 is an
integrated software life cycle process standard.
2.1.2 Iterative life cycles
Not all life cycles are sequential. There are also iterative or incremental life cycles
where, instead of one large development time line from beginning to end, we cycle
through a number of smaller self-contained life cycle phases for the same project. As
with the V-model, there are many variants of iterative life cycles.
A common feature of iterative approaches is that the delivery is divided into
increments or builds with each increment adding new functionality. The initial
increment will contain the infrastructure required to support the initial build func-
tionality. The increment produced by an iteration may be tested at several levels as

tải về 6.34 Mb.

Chia sẻ với bạn bè của bạn:
  1   2   3   4   5   6   7   8   9   ...   25




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương