Instruction Manual ct-t1



tải về 3.13 Mb.
Chế độ xem pdf
trang10/34
Chuyển đổi dữ liệu19.07.2022
Kích3.13 Mb.
#52680
1   ...   6   7   8   9   10   11   12   13   ...   34
90225-1.30 Instruction Manual CT-T1

 4. Quick Start Guide
4.1 Measurement Setup
Before starting a measurement, connect the CT under test to the CT-T1 as shown in the Figure 1.
The measurement results can be stored in the CT-T1 Archive and also can be printed by the 
internal printer. If the Auto Print Results option is selected, the results will be printed automatically 
after the measurement.
90225-1.30 Instruction Manual CT-T1
Page 11 of 62
Figure 1: Example measurement setup of a CT under test with 3 taps for turns ratio measuring. The primary
winding of the CT is connected to the High Current Side of CT-T1 with H-cable and the secondary winding
taps of the CT are connected to the Low Current Side of CT-T1 with X-cables.
CAUTION !
CAUTION !
Please always connect the safety ground before starting any measurements.


4.2 Measurement Process 
1. Configure the CT-T1 to measure the 
example setup depicted in Figure 1. Turn 
on the CT-T1 and you will be presented 
with the tap configuration.
2. Press Info to see the "Rated Current" 
screen. Enter the appropriate values based
on CT specifications.
3. The properties of the current transformer
to be tested can be entered in the 
"Nameplate" screen.
4. If the CT under test is sensitive and 
certain voltage or current values must not 
be exceeded, these limits can be set in the 
"Limits" tab. Then press OK when you 
enter the required information 
90225-1.30 Instruction Manual CT-T1
Page 12 of 62


5. The grid can be used directly to select 
the windings. However, in this case you 
can also tap the X3 button to select the 
corresponding windings. Finally press and 
hold the Start button to start the test.
6. The Degauss process starts. In this step 
the voltage is increased until the slope is 
flat enough. Please note the red area on 
the top of the graph that would disappears 
when the Surveillance Switch is pressed.
7. During the Excitation process, the 
voltage is slowly decreased until the slope 
is steep enough and the graph is extended.
Please keep holding down the Surveillance
Switch as long as the voltage is above 50V.
8. The Turns ratio is measured at different 
voltages below the detected Knee point. 
Please keep holding down the Surveillance
Switch during this step as the voltage might
be increased above 50V depending on the 
detected Knee point.
90225-1.30 Instruction Manual CT-T1
Page 13 of 62


9. The second winding is measured in the 
same way. Starting with another Degauss 
process.
10. The Excitation curve for the second 
winding is drawn on the same diagram.
11. The measurement process is 
completed with the Turns ratio 
determination for the winding X2-X3.
12. The results are shown after all 
measurements have been concluded. The 
first winding is highlighted in red and the 
values are listed on the right.
90225-1.30 Instruction Manual CT-T1
Page 14 of 62


13. The second winding can be highlighted 
using the < and > buttons on the top.
14. After pressing Back ,the available 
results are marked with bule flags in the 
Main screen.

tải về 3.13 Mb.

Chia sẻ với bạn bè của bạn:
1   ...   6   7   8   9   10   11   12   13   ...   34




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương