Ovrrbu-bts. Pdf



tải về 0.71 Mb.
Chế độ xem pdf
trang24/30
Chuyển đổi dữ liệu23.11.2023
Kích0.71 Mb.
#55767
1   ...   20   21   22   23   24   25   26   27   ...   30
BASE TRANSCEIVER STATION

AirLink 8000
1/30/00
BASE TRANSCEIVER STATION
Release 1.00
2 - 29
1.16.3 Monitoring CPE Activities 
The following gives information on activities generated by the CPE.
1.16.3.1 Radio Base Unit Antenna system
The RBU is capable of operation with a family of omni or directional antennas to support a particular
requirement (see table 3.2.1.6-1).
1.16.3.2 Base Transceiver Station
The Base Transceiver Station configuration is designed for deployment into an environment with
marginal environmental control (e.g., shelter). The unit is completely modular allowing for the easy
removal and replacement of the functional modules. Cable I/O is accessible from the front of the unit,
except for the antenna cable, which is accessible from the top. All FRUs are hot swappable.
1.16.3.3 Controls and Indicators
Controls and indicators for the Radio Base Unit are located on the front panel of the unit. To the extent
possible, a series of LED’s starting from the power distribution module visually directs the operator from
cabinet to drawer to failing replaceable module.
1.16.3.4 On/Off switch
A system power on/off switch (circuit breaker) is provided to protect a circuit overload condition and is
configured to prevent accidental shut down.
1.16.3.5 Base Transceiver Station Alarms
The Base Transceiver Station has alarms indicating “critical” level conditions regarding the Radio Port
equipment operation. 
A Rack Alarm is provided that provides both contact closure and a red LED visual indication of any FRU
failure. A receiving attention switch, latch and indicator are provided that causes a green LED to light and
removes the rack alarm.
1.16.3.6 The Customer Premises Equipment (CPE)
The CPE consists of three major subsystems, the Subscriber Unit (SU), the Network Terminating Unit
(NTU), and the Uninterruptable Power Supply (UPS). Each component is located in different areas of the
installation site. The SU is mounted outside at a high point on the building or on a ridged pole. The NTU
is located outside of the home/building on a wall at or near the point of entry of the UPS and subscriber
cabling. The UPS is located inside the home/building near (within 6 feet) the point where prime source
power is available.

tải về 0.71 Mb.

Chia sẻ với bạn bè của bạn:
1   ...   20   21   22   23   24   25   26   27   ...   30




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương