Lucent Optical Management System (oms) Release


Alcatel-Lucent - Proprietary



tải về 2.06 Mb.
Chế độ xem pdf
trang62/528
Chuyển đổi dữ liệu18.05.2022
Kích2.06 Mb.
#51991
1   ...   58   59   60   61   62   63   64   65   ...   528
365312875R5.2 V1 LUCENT OPTICAL MANAGEMENT

Alcatel-Lucent - Proprietary
See notice on first page
3-23


connections.
The total number of managed NEs in an area can be tunneled through the level 2
subdomain with regard to the maximum number of manager connections that can
be forwarded by a node. Only the shortest inter-area route between two partition
repair capable nodes in an area has to be taken into account.

The manager connections that are received, encapsulated and forwarded into a
partition-repair tunnel, are counted as normal connections. If 100 manager
connections can be tunneled in case of a failure, the related partition designated
node must be capable of forwarding 100 manager connections.

All areas can be provisioned to have one or more partition repair capable nodes.
Each area with one or more partition repair capable nodes requires an extra entry in
the routing table (RIB), because of initial selection of a partition repair designated
node per area.

Avoid the use of partition repair capable NEs in large areas.
A DCN network design that selects small level-1 areas to use partition repair, while
the large areas are rings that need no partition repair, will be easier to understand.
Also it is easier to check that all rules are obeyed.

The maximum number of partition repair capable NEs in a network is 49.
All partition designated nodes in the level 2 subdomain require an additional entry
in the routing table of the other partition designated nodes. Up to 49 additional
entries are available, which are all used after a single failure when all 8 areas have
partition repair capable nodes and one of those areas is partitioned.
Partitioning restrictions
A maximum of nine partition repair capable NEs per area is allowed. This implies that
the partition repair capable NEs can terminate a maximum of eight partition repair
tunnels. A single cable cut may imply many fiber cuts, of which more than 7 of those
fiber cuts may imply partitioning of the same area. A fiber cut between two DWDM
nodes may imply a cut of many DCC channels. The network design shall not use
tải về 2.06 Mb.

Chia sẻ với bạn bè của bạn:
1   ...   58   59   60   61   62   63   64   65   ...   528




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương