500kV TRANSMISSION LINES BUILT OVER THE PERIOD FROM 2011 TO 2020



No.

Project name

Number of Circuits x km

Number of Circuits x kmNumber of Circuits x kmkm

Notes

 

Transmission lines built over the period from 2011 to 2020

 

Northern area

 

 

 

1443

 

1

Son La – Hiep Hoa

2

x

286

572

2011

2

Quang Ninh – Hiep Hoa

2

x

140

280

 

3

Quang Ninh - Mong Duong

2

x

25

50

2013

4

Pho Noi – turn at Quang Ninh – Thuong Tin

4

x

10

40

 

5

Vung Ang – turn at Ha Tinh – Da Nang

4

x

18

72

 

6

Son La - Lai Chau

2

x

180

360

 

7

Hiep Hoa - Dong Anh - Pho Noi

1

x

69

69

 

8

Increase in the capacity of the capacitors along the part Nho Quan – Ha Tinh

 

 

 

 

2000A or above

 

Central area

 

 

 

1074

 

1

Pleiku – My Phuoc – Cau Bong

2

x

437

874

 

2

HatXan - Pleiku

2

x

100

200

 

3

Increase in the capacity of the capacitors along the part Ha Tinh – Da Nang

 

 

 

 

2000A or above

 

Southern area

 

 

 

1316

 

1

Song May – Tan Dinh

2

x

41

82

2012

2

Phu My – Song May

2

x

66

132

2012

3

Vinh Tan – Song May

2

x

235

470

Connected to Vinh Tan 2 TPP

4

Splitting point - Cau Bong

4

x

1

4

Transitted 2 circuits of current 500kv lines

5

Splitting point - Duc Hoa

4

x

8

32

Transitted 2 circuits of current 500kv lines

6

Song May – Tan Uyen

2

x

22

44

Using big cable

7

My Tho - Duc Hoa

2

x

60

120

Connected to Duyen Hai & Long Phu TPPs

8

Duyen Hai – My Tho TPP

2

x

113

226

Connected to Duyen Hai 1 TPP

9

Long Phu – O Mon TPP

2

x

84

168

Connected to Long Phu 1 TPP

10

O Mon – Thot Not

2

x

16

32

 

11

Splitting point - My Tho

4

x

1

4

Splitting points on the 2 transmission lines O Mon – Phu Lam and Nha Be

12

Increase in the capacity of the capacitors along the part PleiKu – Dak Nong – Phu Lam and the part PleiKu – Di Linh – Tan Dinh

 

 

 

 

2000A or above

13

Phu My 4 – Phu My

2

x

1

2

Replace with bigger cable

 

Substation built over the period from 2016 to 2020

 

Northern area

 

 

 

2015

 

1

Bac Ninh – splitting point Dong Anh - Pho Noi

2

x

5

10

 

2

Splitting point Bac Ninh - Quang Ninh – Hiep Hoa

2

x

32

64

 

3

Tay Ha Noi - Thuong Tin

2

x

24

48

 

4

500kV Transmission line for importing power from China

350

350350350

DC shall be considered to be used

5

Vinh Yen – Tay Ha Noi converter station

2

x

70

140

In case using DC to import power from China.

6

Tay Ha Noi – splitting point Viet Tri – Hiep Hoa (Vinh Yen)

2

x

60

120

If the 500kV power has not been imported from China.

7

Dong Phu Yen – Tay Ha Noi

2

x

110

220

 

8

Dong Phu Yen – splitting point Son La – Viet Tri

4

x

20

80

Connected to Dong Phu Yen HAPP

9

Nho Quan - Thuong Tin

1

x

75

75

For circuit 2

10

Long Bien – splitting point Thuong Tin – Pho Noi

2

x

5

10

 

11

Thang Long TPP – splitting point Quang Ninh – Pho Noi

2

x

5

10

Connected to Thang Long TPP

12

Thai Binh – Pho Noi switching substation

2

x

60

120

 

13

Thai Binh - Nam Dinh TPP switching substation

2

x

72

144

 

14

Thai Binh – Hai Phong switching substation

2

x

40

80

 

15

Nghi Son – splitting point Nho Quan – Ha Tinh

4

x

50

200

 

16

Quang Trach TPP – Vung Ang

2

x

25

50

 

17

Nam Dinh TPP – Thanh Hoa

2

x

72

144

 

18

Quynh Lap TPP – Thanh Hoa

2

x

75

150

 

 

Central area

 

 

 

630

 

1

Van Phong TPP – Ninh Thuan NPP 1 – Vinh Tan TPP

2

x

195

390

Connected to Van Phong 1 TPP

2

Hue – splitting point Ha Tinh – Da Nang

4

x

5

20

 

3

Bac Ai HAPP - splitting point Van Phong – Ninh Thuan NPP 1

4

x

35

140

 

4

Quang Tri TPP – splitting point Ha Tinh – Da Nang

4

x

20

80

 

 

Southern area

 

 

 

1894

 

1

Vinh Tan Electricity Center – Song May

2

x

235

470

Circuits 3, 4 – Connected to the project finished sooner (Vinh Tan 3 or Van Phong 1)

2

Ninh Thuan 1 NPP – Binh Duong 1

2

x

250

500

Connected to Ninh Thuan 1 NPP

3

Long Thanh – splitting point Phu My – Song May

2

x

16

32

 

4

Dong Nai – splitting point Phu My – Song May

4

x

18

72

 

5

Son My electricity center – Dong Nai switching substation

2

x

53

106

Connected to Son My 1 TPP

6

My Phuoc – Cu Chi

2

x

25

50

 

7

Kien Luong TPP - Thot Not

2

x

107

214

Connected to Kien Luong TPP

8

Thot Not - Duc Hoa

2

x

145

290

 

9

My Phuoc – splitting point Pleiku – Cau Bong

4

x

5

20

 

10

Splitting point Song May – Tan Dinh – Binh Duong 1

4

x

5

20

 

11

Song Hau TPP – My Tho

2

x

60

120

be built in case the Song Hau 1 TPP project is commenced sooner than expected