III
|
Onshore high-pressure gas pipeline system and gas distribution station
|
|
|
|
|
1
|
LFS Long Hai – GPP2 gas transmission pipeline
|
2019
|
7
|
9
|
26
|
2
|
GPP2 – GDC Phu My gas transmission pipeline
|
2019
|
7
|
30
|
30
|
3
|
Ethane transmission pipeline for connection between ethane fractionation plant to Long Son petrochemical refining complex
|
2019
|
300,000 tons
|
23
|
8
|
4
|
GPP2 – Thi Vai LPG transmission pipeline
|
2019
|
|
24
|
8
|
5
|
GPP2 – Thi Vai condensate transmission pipeline
|
2019
|
|
24
|
6
|
6
|
Improvement/ alteration of Thi Vai port storage facility
|
2019
|
|
|
|
7
|
Improvement/ alteration of GDC Phu My
|
2019
|
|
|
|
8
|
Alteration of GDS Nhon Trach, Hiep Phuoc
|
2019
|
|
|
|
IV
|
Low-pressure gas/CNG/LNG pipeline system
|
|
|
|
|
1
|
Phu My 2, Phu My 3 - Cai Mep low-pressure gas pipeline system for distribution of gases to households for industrial uses
|
2019
|
0.1 – 0.5
|
30
|
6 - 10
|
2
|
Gas supply pipeline system for Hiep Phuoc industrial park (2nd stage) - Long Hau
|
2017
|
0.3
|
20
|
6 - 8
|
3
|
Gas supply pipeline system for Nhon Trach industrial park (2nd stage) – Ong Keo
|
2017
|
0.3
|
-
|
-
|
4
|
Gas supply pipeline system for household uses at Long Thanh district’s IPs
|
2019
|
0.2
|
-
|
-
|
5
|
Gas supply system for Nhon Duc – Phuoc Kien – Phu My Hung – Thu Thiem (HCMC) residential zones
|
2020
|
0.3
|
-
|
-
|
6
|
Gas (CNG/LNG) supply pipeline system for Long Thanh airport
|
2020 - 2025
|
0.2
|
-
|
-
|
7
|
Gas supply pipeline system for Tan Thanh’s residential zones
|
2020
|
0.1
|
-
|
-
|
V
|
Gas treatment plant
|
|
|
|
|
1
|
Dinh Co (GPP2) gas treatment plant integrated with ethane fractionation complex
|
2019
|
7
|
-
|
-
|
2
|
Ethane fractionation plant at Dinh Co (integrated with GPP2)
|
2019
|
2
|
-
|
-
|
3
|
LNG plant and system for supply of gases to means of transport
|
2018
|
0.17 – 0.33
|
-
|
-
|
No.
|
Name of pipeline
|
Operation commencement period
|
Expected capacity (billion m3/year)
|
Length (km)
|
Diameter (inch)
|
I
|
Main offshore high-pressure gas pipeline system
|
|
|
|
|
1
|
Gas transmission pipeline system from Phu Khanh basin to Binh Thuan/ Ba Ria – Vung Tau province
|
2030 - 2035
|
3
|
250
|
20
|
2
|
Gas transmission pipeline system from Tu Chinh – Vung May basin to Nam Con Son 1/ Nam Con Son 2
|
2030 - 2035
|
2
|
150
|
18
|
II
|
Gas gathering pipelines
|
|
|
|
|
1
|
Ha Ma Xam – Rong/ Doi Moi gas gathering pipeline
|
2026 - 2035
|
0.3
|
18
|
12
|
2
|
Doi Nau – Ha Ma Xam gas gathering pipeline
|
2026 - 2035
|
0.15
|
25
|
10
|
3
|
Rong Vi Dai (Block 11-2) – Rong Doi gas field gathering pipeline
|
2026 - 2035
|
0.26
|
15
|
12
|
4
|
12C gas field (Block 12E) – Rong Doi gas gathering pipeline
|
2026 - 2035
|
0.47
|
20
|
16
|
5
|
Thien Nga gas field (Block 12W) – Chim Sao/ Dua gas gathering pipeline
|
2026 - 2035
|
0.26
|
10
|
10
|
6
|
Gas gathering pipeline from gas wells at Block 06.1, 05-2 & 05-3, 11-2 to Nam Con Son 1
|
2026 - 2035
|
1.8
|
60
|
16
|
7
|
Gas gathering pipeline from Than Nong gas field, Block 04-1, 04-2, 04-3, 05-1 to Nam Con Son 2 gas pipeline
|
2026 - 2035
|
1.4
|
50
|
16
|
No.
|
Project
|
Operation commencement period
|
Expected capacity (billion m3/year)
|
Length (km)
|
Diameter (inch)
|
I
|
Main offshore high-pressure gas pipeline system
|
|
|
|
|
1
|
Block B – O Mon gas transmission pipeline system
|
2021 - 2022
|
6.4
|
292
|
28
|
2
|
Pipeline (from KP209 of Block B pipeline) for supplementary supply of gases to PM3 – Ca Mau
|
2020
|
2.4
|
37
|
18
|
II
|
Gas gathering pipeline system
|
|
|
|
|
1
|
Khanh My – BOD WHP/BOA CPP gas transmission pipeline
|
2020
|
2.2
|
20
|
20
|
2
|
Dam Doi gas field – Khanh My pipeline
|
2020
|
0.65
|
7.5
|
12
|
3
|
Hoa Mai gas field – Dam Doi gathering pipeline
|
2020
|
0.4
|
14
|
8
|
4
|
U Minh/Minh Hai gas field – Khanh My pipeline
|
2022
|
1.1
|
23
|
16
|
5
|
Nam Du gas field – U Minh/Minh Hai pipeline
|
2024
|
0.5
|
27
|
12
|
III
|
Onshore high-pressure gas pipeline system
|
|
|
|
|
1
|
Block B gas transmission pipeline from the landfall point to the landfall station (LFS) & GDS Kien Giang
|
2021
|
6.4
|
30
|
28
|
2
|
Block B – O Mon gas transmission pipeline from Kien Giang to O Mon
|
2021
|
6.4
|
72
|
22
|
3
|
Low-pressure gas supply system in Ca Mau
|
After 2021
|
0.1 – 0.2
|
15 - 25
|
6 - 10
|
4
|
Low-pressure gas supply system in Can Tho
|
After 2025
|
0.1 – 0.3
|
20 - 30
|
6 - 10
|
5
|
Low-pressure gas supply system in Kien Giang
|
After 2025
|
0.1 – 0.3
|
30 - 50
|
8 - 12
|
IV
|
Gas treatment plant
|
|
|
|
|
1
|
Gas treatment plant in Ca Mau
|
2017
|
2.2
|
|
|
2
|
Gas treatment plant in Kien Giang
|
2021 - 2025
|
6.4
|
|
|
No.
|
Project
|
Operation commencement period
|
Expected capacity (million ton/year)
|
Length (km)
|
Diameter (inch)
|
I
|
Storage unit at LNG import terminal
|
|
|
|
|
1
|
Thi Vai LNG storage unit
|
2020 - 2022
|
1 - 3
|
|
|
2
|
Southwest region (Ca Mau) LNG storage unit – 1st stage
|
2022 - 2025
|
1
|
|
|
3
|
Son My (Binh Thuan) LNG storage unit – 1st stage
|
2023 - 2025
|
1 - 3
|
|
|
4
|
Southeast region LNG storage unit (maybe in Tien Giang province)
|
2022 - 2025
|
4 - 6
|
|
|
II
|
Regasification pipelines
|
|
|
|
|
1
|
Gas pipeline from the existing Thi Vai LNG regasification storage unit – the existing GDC
|
2020 - 2022
|
4.5 billion m3/year
|
12
|
18
|
2
|
Southwest LNG storage unit – Ca Mau pipeline
|
2022 - 2025
|
5 billion m3/year
|
85
|
20 - 28
|
3
|
Gas pipeline from Son My LNG storage unit to Son My electricity center
|
2023 - 2025
|
5 – 11 billion m3/year
|
10
|
38 - 45
|