1.6.3. Certain warning signs may be incorporated into directional signs; for further details see
Chapter 7.
1.6.4. Detailed guidance on the use of warning signs at road works is given in Chapter 8, and
for the approach to signalled junctions and crossings in Chapter 6.
1.6.5. To prevent the proliferation of obsolete signs, and clutter, Schedule 13 stipulates that the
temporary sign to diagram 7014 “NEW ROUNDABOUT AHEAD” (S13‑6‑37) and its variants,
and the sign to diagram 790 “NEW LEVEL CROSSING AHEAD” (S14‑2‑67) must only be
displayed for a maximum period of three months after completion of works. A remove by date
must be placed on the back of the sign. See also
Chia sẻ với bạn bè của bạn: |