  1. Project type: Bridge - road

  1. Project title:

Constructing high line No. 2

3. Location:

District 10, District 11, Bình Chánh District



4. Total length: about 11,8 km

5. Project objectives:

Constructing a high-above radial axis from the central area toward the West of the city



6. The expected investment capital: VND 21,490 billion (equivalent to US$ 977 million)

7. General information on the project

Under Decision no. 568/QD-TTg, the direction of the highway no. 2 is fixed as follows: crosses highway no. 1 at the interchange of Cha Cả Mausoleum, then goes along Bùi Thị Xuân road, cross Nhiêu Lộc - Thị Nghè Canal at bridge no. 5, goes along hamlet no. 656 Cách Mạng Tháng Tám, through Bắc Hải road - hamlet no. 2 Thiên Phước road - hamlet no. 654 Âu Cơ road - along Đầm Sen park - Bàu Trâu ditch, goes along Bàu Trâu ditch (border between District 6 and Tân Phú District), pass Phan Anh road and Tân Hòa Đông road to turn into Chiến Lược road, goes along Chiến Lược road to Mã Lò road before turning into Inter-village road no. 2 and ends at the interchange of NH 1 (Belt road no. 2). The Line No. 2 is about 11.8 km long, passing Districts 3, 6, 10, 11, Tân Bình, Bình Tân.



8. Form of investment: PPP, ODA.

9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451


10. NB:

General plan has already been available








  1. Project type: Bridge - road

  1. Project title:

Constructing high line No. 3

3. Location:

District 5, District 7, District 10



4. Total length: about 8,1 km

5. Project objectives:

Constructing a high-above radial axis from the central area toward the South of the city



6. The expected investment capital: VND 14,756 billion (equivalent to US$ 671 million)

7. General information on the project

Under Decision No. 568/QD-TTg, the direction of the highway No. 3 is fixed as follows: from the interchange of the highway No. 2 at Thành Thái road, the highway goes along Thành Thái road, passes Tô Hiến Thành road. Then, continue going along Thành Thái road to Thành Thái intersection and 3 Thang 2 road, turns left into Lý Thái Tổ road to Lý Thái Tổ 7-intersection; from Lý Thái Tổ 7-intersection, the highway coincides with roads Lý Thái Tổ – Nguyễn Văn Cừ to Nguyễn Văn Cừ - Trần Hưng Đạo intersection. From Nguyễn Văn Cừ - Trần Hưng Đạo intersection, the highway goes along Nguyễn Văn Cừ for about 100m then turns left along Nguyễn Văn Cừ road, passes Võ Văn Kiệt avenue, Bến Nghé ditch and Kênh Tẻ ditch, goes along the right bank of Ông Lớn ditch for about 450m. From here the highway goes along Ông Lớn ditch to nearly Ông Lớn bridge then merges into the main axis road of Trung Sơn area (road 9A) to connect into Nguyễn Văn Linh road. Length: ~ 8.1km.



8. Form of investment: PPP, ODA.

9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451


10. NB:

General plan has already been available








  1. Project type: Bridge - road

  1. Project title:

Constructing high line No. 4

3. Location:

District 3, District 12, Bình Thạnh District and Gò Vấp District



4. Total length: about 7,3 km

5. Project objectives:

Constructing a high-above radial axis from the central area toward the North of the city



6. The expected investment capital: VND 20,300 billion (equivalent to US$ 923 million)

7. General information on the project

Under Decision No. 568/QD-TTg, the direction of the highway no. 4 is fixed as follows: starts from NH 1 (crosses the highway no. 5), the highway goes along Vườn Lài road, crosses Vàm Thuật river at Lang ditch and North-South railway (at Đen Bridge), next, the highway goes along Phan Chu Trinh road and planned to extend and pass by Mỹ Phước condominium, ends by crossing highway No. 1 at Điện Biên Phủ road. Total length: about 7.30 km.



8. Form of investment: PPP, ODA.

9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451


10. NB:

General plan has already been available








  1. Project type: Bridge - road

  1. Project title:

Upgrading and expanding An Dương Vương – Phan Anh – Bình Long – Hương Lộ 3 road system

3. Location:

District 6, 8, Bình Tân and Tân Phú



4. Total length:

5. Project objectives:

Enhancing traffic ability



6. The expected investment capital: VND 10,000 billion (equivalent to US$ 455 million)

7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Investment scale:

- Length: 10.65 km;

- Cross section: 6 lanes, limit: 30m.


8. Form of investment: BT

9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451







  1. Project type: Bridge - road

  1. Project title:

Enhancement and expansion of Provincial Highway 15 (from the North West of Tân Chánh Hiệp - Ngã Ba Bàu intersection), Dist.12

3. Location:

District 12 and Củ Chi District



4. Total length:

5. Project objectives:

Perfecting the local traffic system, contributing to the economic - social development of the area across Provincial Highway 15.



6. The expected investment capital: VND 1,999 billion (equivalent to US$ 91 million)

7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Total length 11.9km, Cross section 35m (06 lanes + 3m long median strips + 2x3.75m of pavement).


8. Form of investment: BOT, BOT combined with BT (BOT should be prioritized)

9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451







  1. Project type: Bridge - road

  1. Project title:

Upgrading and Repairing Đặng Thúc Vịnh road (provincial highway 9)

3. Location:

Hóc Môn District



4. Total length:

5. Project objectives:

Resolving traffic issues, solidifying and developing traffic infrastructures in Hóc Môn District



6. The expected investment capital: VND 1,813 billion (equivalent to US$ 82 million)

7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

5.200m x 40m


8. Form of investment: BT

9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451







  1. Project type: Bridge - road

  1. Project title:

Construction of connecting road from Eastern ring road - Hanoi highway (Bình Thái road - Eastern ring road

3. Location:

District 9, Thủ Đức District.



4. Total length:

5. Project objectives:

Completing the regional traffic system. Enhancing traffic ability in the city’s Eastern gateway.



6. The expected investment capital: VND 1,581 billion (equivalent to US$ 72 million)

7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Total length: 3,820m, Cross section 67m (stage 1: constructing two side roads, each includes 02 lanes + 33m for reservation in between).


8. Form of investment: BT, PPP and other feasible forms of investment.

9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451


10. NB:

Estimated expense for compensation of land clearance is about VND 2000 billion, the Department of Transportation and Communication of Hồ Chí Minh City is organizing the appraisal of the project.








  1. Project type: Bridge - road

  1. Project title:

Upgrading and expanding Provincial Highway 15 (from Highway 7 Bridge to Bến Súc bridge)

3. Location:

Củ Chi District.



4. Total length:

5. Project objectives:

Perfecting the local traffic system, contributing to the economic - social development of the area across Provincial Highway 15.



6. The expected investment capital: VND 1,536 billion (equivalent to US$ 70 million)

7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Length: 10.58km, Cross section 35m (06 lanes + 3m median strips + 2x3.75m pavement).


8. Form of investment: BOT, BOT combined with BT (BOT should be prioritized)

9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451


10. NB:

Estimated expense for compensation of land clearance is about VND 999.81 billion.








  1. Project type: Bridge - road

  1. Project title:

Upgrading and expanding Provincial Highway 15 in Củ Chi province (from Xáng bridge to Bến Súc bridge)

3. Location:

Củ Chi District.



4. Total length:

5. Project objectives:

Perfecting the local traffic system, contributing to the economic - social development of the area across Provincial Highway 15



6. The expected investment capital: VND 6000 billion (equivalent to US$ 2703 million)

7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Total length: 35km. Cross section: 35m (including 06 lanes + 3m median strips + 2 lanes x 3.75m).


8. Form of investment: BOT, BOT combined with BT (BOT should be prioritized)

9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451







  1. Project type: Bridge - road

  1. Project title:

Constructing a road in parallel with Nguyễn Văn Tạo road

3. Location:

Nhà Bè District



4. Total length:

7. Project objectives:

Meeting the need of transport and urbanization development in Hiệp Phước Harbor Industrial and Urban Zone



5. The expected investment capital: VND 1,200 billion (equivalent to US$ 55 million)

8. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Investment scale:

- Road length: 4.5km

- Cross section: 60m


6. Form of investment: BT (mainly mining soil)

8. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451







  1. Project type: Bridge - road

  1. Project title:

Upgrading and expanding Provincial Highway 9

3. Location:

Củ Chi District



4. Total length:

5. Project objectives:

Enhancing traffic ability



6. The expected investment capital: VND 1,200 billion (equivalent to US$ 55 million)

7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Investment scale:

- Road length: 5.7 km

- Cross section: 40m


8. Form of investment: BT

9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451







  1. Project type: Bridge - road

  1. Project title:

Constructing the Northwestern radial road (from Long An dike to Vĩnh Lộc industrial zone)

3. Location:

Bình Tân District, Bình Chánh District



4. Total length:

5. Project objectives:

Completing the regional traffic system.



6. The expected investment capital: VND 5,000 billion (equivalent to US$ 227 million)

7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

total leng: 8km


8. Form of investment: BT (mainly exploiting land fund)

9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451







  1. Project type: Bridge - road

  1. Project title:

Constructing Ba Diem Cross-road (Highway No. 1 and Phan Văn Hớn Road)

3. Location:

District 12, Hóc Môn District



4. Total length:

5. Project objectives:

Addressing the traffic congestion at the intersection



  1. The expected investment capital: VND 408 billion (equivalent to US$ 19 million)

  1. General information on the project

Building a crossover in the direction of Highway 1, which is 246m long and 18.6m wide

  1. Form of investment: BT (mainly exploiting land fund)

  1. Contact address:

Urban Traffic Control Section No. 3

Каталог: HoatDongAnh
HoatDongAnh -> ĐỀ CƯƠng báo cáo kết quả ĐÓng góP Ý kiến của nhân dâN ĐỐi với dự thảo bộ luật dân sự (SỬA ĐỔI) A. NỘi dung chính của báo cáO
HoatDongAnh -> Ủy ban thưỜng vụ quốc hội chính phủ ĐOÀn chủ TỊch ủy ban trung ưƠNG
HoatDongAnh -> Ủy ban nhân dân cộng hòa xã HỘi chủ nghĩa việt nam thành phố HỒ chí minh độc lập Tự do Hạnh phúc
HoatDongAnh -> Ủy ban nhân dân thành phố HỒ chí minh
HoatDongAnh -> Ban thưỜng trực số: 03 /hd-mttq-btt cộng hòa xã HỘi chủ nghĩa việt nam
HoatDongAnh -> CỘng hòa xã HỘi chủ nghĩa việt nam độc lập –Tự do – Hạnh phúc
HoatDongAnh -> Ủy ban nhân dân cộng hòa xã HỘi chủ nghĩa việt nam thành phố HỒ chí minh độc lập Tự do Hạnh phúc
HoatDongAnh -> Ủy ban nhân dân thành phố HỒ chí minh
HoatDongAnh -> QuyếT ĐỊnh về việc ban hành Quy định cơ chế quản lý đầu tư và xây dựng, quản lý nguồn vốn đầu tư tại các xã thực hiện Chương trình
HoatDongAnh -> Ủy ban nhân dân cộng hòa xã HỘi chủ nghĩa việt nam

tải về 3.07 Mb.

Chia sẻ với bạn bè của bạn:
1   2   3   4   5   6   7   8   9   ...   13




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương