APPENDIX III



LIST OF MODERATE AND MINOR HYDROELECTRIC POWER GENERATION PROJECTS
(Enclosed with the Decision No. 1208/QĐ-TTg dated July 21, 2011 of the Prime Minister)

No

Project name

Installed capacity (MW)

Investor

 

Projects expected to be commenced in 2011

280,5

 

1

Muong Hum HPS

32

Son Vu Co.

2

Su Pan 2 HPS

34,5

IPP

3

Huong Dien HPS #3

27

HD investment joint-stock company

4

Song Giang 2 HPS

37

IPP

5

Minor HPSs

150

 

 

Projects expected to be commenced in 2012

657

 

1

Ta Thang HPS

60

IPP

2

Nam Phang HPS

36

IPP

3

Nam Toong HPS

34

IPP

4

Ngoi Hut 2 HPS

48

IPP

5

Nam Muc HPS

44

IPP

6

Van Chan HPS

57

IPP

7

Song Bung 4A HPS

49

IPP

8

Song Tranh 3 HPS

62

IPP

9

Nho Que 1 HPS

32

IPP

10

Chiem Hoa HPS

48

IPP

11

Song Bung 5 HPS

49

IPP

12

Minor HPSs

138

 

 

Projects expected to be commenced in 2013

401,5

 

1

Ba Thuoc I HPS

60

IPP

2

Nam Pan 5 HPS

34,5

IPP

3

Nam Cun HPS

40

IPP

4

Song Bac HPS

42

IPP

5

Nhan Hac HPS

45

IPP

6

Minor HPSs

180

 

 

Projects expected to be commenced in 2014

655

 

1

Nho Que 2 HPS

48

IPP

2

Long Tao HPS

42

IPP

3

Bac Me HPS

45

IPP

4

Chi Khe HPS

41

IPP

5

Song Nam – Song Bac HPS

49

IPP

6

Tra Khuc 1 HPS

36

IPP

7

Song Tranh 4 HPS

48

IPP

8

La Ngau HPS

46

La Ngau hydropower joint-stock company

9

Minor HPSs

300

 

 

Projects expected to be commenced in 2015

384

 

1

Song Lo 6 HPS

44

IPP

2

Song Tranh 5 HPS

40

IPP

3

Thanh Son HPS

40

IPP

4

Phu Tan 2 HPS

60

IPP

5

Minor HPSs

200

 

 

Projects expected to be commenced in 2016

355

 

1

Thanh Son HPS

37

IPP

2

Ban Mong HPS

60

IPP

3

A Lin HPS

63

IPP

4

Dak My 3 HPS

45

IPP

5

Minor HPSs

150

 

 

Projects expected to be commenced in 2017

354

 

1

Dak My 1 HPS

54

IPP

2

Minor HPSs

300

 

 

APPENDIX IV:

LIST OF ELECTRICAL GRID PROJECTS EXPECTED TO BE BUILT OVER THE PERIOD FROM 2011 TO 2020
(Enclosed with the Decision No. 1208/QĐ-TTg dated July 21, 2011 of the Prime Minister)

500kV SUBSTATIONS BUILT OVER THE PERIOD FROM 2011 TO 2020



No.

Project name

Number of transformers x MVA

Number of transformers x MVA Number of transformers x MVA Capacity - MVA

Notes

 

Substation built over the period from 2011 to 2020

 

Northern area

Northern areaNorthern areaNorthern area6750

 

1

Nho Quan

1

x

450

450

Install transformer 2

2

Ha Tinh

1

x

450

450

Install transformer 2

3

Hiep Hoa

2

x

900

1800

Newly constructed

4

Pho Noi

2

x

900

1800

Newly constructed

5

Viet Tri

1

x

450

450

Newly constructed

6

Vung Ang

2

x

450

900

Connected to Vung Ang 1

7

Quang Ninh

1

x

450

450

Install transformer 2

8

Lai Chau

1

x

450

450

Be considered to build in order to gather the minor HPSs in the area

 

Central area

Central areaCentral areaCentral area900

 

1

Thanh My

2

x

450

900

Newly constructed

 

Southern area

Southern areaSouthern areaSouthern area9450

 

1

Phu Lam

1

x

900

900

Replace transformer 1

2

Song May

2

x

600

1200

2013

3

Cau Bong

2

x

900

1800

Have 3 transformers

4

Duc Hoa

1

x

900

900

 

5

Tan Uyen

1

x

900

900

Rename Thu Duc Bac substation

6

Thot Not

1

x

600

600

 

7

My Tho

1

x

900

900

 

8

O Mon

1

x

450

450

Install transformer 2

9

Long Phu

1

x

450

450

Shall be built if the progress of the 500kV transmission line Long Phu – O Mon is late compared with the progress of Long Phu TPPs 1, 2

10

Duyen Hai

1

x

450

450

 

11

Vinh Tan

2

x

450

900

Connected to Vinh Tan 2

 

Substation built over the period from 2016 to 2020

 

Northern area

Northern areaNorthern areaNorthern area13100

 

1

Thuong Tin

2

x

900

1800

Replace transformer

2

Nho Quan

1

x

900

900

Replace transformer 1

3

Viet Tri

1

x

900

900

Install transformer 2

4

Vinh Yen converter station

 

 

 

2000

Built in concurrence with the progress of importating power from China (3000 ~ 4000 MV ); details are in the investment project.

5

Dong Anh

2

x

900

1800

Newly constructed

6

Tay Ha Noi

1

x

900

900

Newly constructed

7

Long Bien

2

x

900

1800

Newly constructed

8

Thai Binh switching substation

 

 

 

 

Swithching substation (need preparation for installing 2 Transformers)

9

Nghi Son

2

x

450

900

Connected to Nghi Son 2 TPP

10

Bac Ninh

2

x

600

1200

Newly constructed (with 03 Transformers)

11

Hai Phong

1

x

900

900

Newly constructed

 

Central area

Central areaCentral areaCentral area2400

 

1

Hue

1

x

600

600

Install transformer 1

2

Doc Soi

1

x

450

450

Install transformer 2

3

Da Nang

1

x

900

900

Replace transformer 1

4

Van Phong

1

x

450

450

Connected to Van Phong

 

Southern area

Southern areaSouthern areaSouthern area11250

 

1

Phu Lam

1

x

900

900

Replace transformer 2

2

Nha Be

2

x

900

1800

Replace 2 Transformers

3

Tan Uyen

1

x

900

900

Install transformer 2

4

My Phuoc

1

x

900

900

expected to be commenced in 2016

5

Dong Nai

 

 

 

 

Switching substation (need preparation for installing 3 Transformers)

6

Cu Chi

2

x

900

1800

 

7

Binh Duong 1

1

x

900

900

Connected to Ninh Thuan 1 NPP

8

Long Thanh

2

x

900

1800

Newly constructed

9

Duc Hoa

1

x

900

900

Install transformer 2

10

My Tho

1

x

900

900

Install transformer 2

11

Kien Luong TPP

1

x

450

450

 


tải về 2.28 Mb.

Chia sẻ với bạn bè của bạn:
1   2   3   4   5   6   7   8   9   ...   19




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương