National key projects



tải về 3.07 Mb.
trang9/13
Chuyển đổi dữ liệu01.06.2018
Kích3.07 Mb.
#39203
1   ...   5   6   7   8   9   10   11   12   13






BASIC INFORMATION ON THE PROJECT FORM

  1. Project type: Transport infrastructure

  1. Project name: Internal road connecting Canal 5 - Canal 7

  1. Location: Urban Area in the North-West of Hồ Chí Minh City

  1. Land area to be used: 4.33 ha

  1. Total investment: VND 239 billion

  1. Form of investment: PPP- BT contract

  1. Project objectives: Investing in infrastructure under the approved planning, facilitating the development of the North-Western Urban Area

  1. General information on the project: Already approved by the City People’s Committee in the list of investment projects in form of BT at Decision No. 5754/QD-UBND dated 12/11/2012. Current land status: not yet finished in land compensation and clearance.

  1. Photo:



  1. Contact agency: North-Western Urban Area Management Board






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Transport infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project name: Road connecting Bình Thái Intersection to Phạm Văn Đồng road

(Project name)

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 1,324 billion (including site clearance VND 1,012 billion)

(The expected investment capital, denominated in VND and USD)

  • Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

  • General information: Road length: 1,989km; Cross section in phase 1: 67m (2m slope + 2m road-side + 9.5m pavement + 1.5m road-side + 37m empty space + 1.5m road-side + 9.5m pavement + 2m road-side + 2m slope).

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Transport infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: Road connecting An Lạc Intersection to Nguyễn Văn Linh road

(Project name)

  • Location: Bình Tân District, District 8, Bình Chánh District

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 6,059 billion (including site clearance VND 4,200 billion)

(The expected investment capital, denominated in VND and USD)

  • Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

  • General information: 02 lanes at each side with: the road length of about 5.3km, Cross section: 60m (by the completion phase will have 10 lanes (04 lanes in the middle, 06 lanes on two sides))

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Transport infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: Nguyễn Hữu Cảnh road

(Project name)

Location: Bình Thạnh District, District 1 (Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 527 billion

(The expected investment capital, denominated in VND and USD)

  • Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

  • General information: Repairing a road of length 3.78km, width from 35m to 50m

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Transport infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: Road along the bank of Sài Gòn River

(Project name)

Location: Bình Thạnh District, District 1.

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 696 billion

(The expected investment capital, denominated in VND and USD)

  • Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

  • General information:

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Transport infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: The interchange at Trường Sơn road – road connecting Tân Sơn Nhất, Bình Lợi, the outer belt road

(Project name)

Location:

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 772 billion

(The expected investment capital, denominated in VND and USD)

  • Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

  • General information: Phase 1: Constructing a 1-way direct overpass (steel bridge) in Y shape from Trường Sơn road (length: 99.66m, width: 11.5m) to the national station (length: 99.66m, width: 8m) and 1 branch into the international station (length: 219m, width: 8m). Phase 2: Constructing a subway crossing Trường Sơn road from the national station toward Hồng Hà with width of 6.5m, length in closed section of 40m, in the open section of 100m for each end and retaining wall of 60m for each end, total length of the subway: 390m (including retaining dike)

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Urban technical infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: The Investment project to replace the system of urban lights with a system of power-saving intelligent lights

(Project name)

Location:

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 2,111 billion

(The expected investment capital, denominated in VND and USD)

  • Investment type: BLT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Replacing all the old system of urban lights with capacities of 70-400W with power-saving intelligent Led lights with capacity of 30-185W.

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Urban technical infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: Tân Hóa - Lò Gốm Basin Wastewater Collection and Treatment System

(Project name)

Location:

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 5,100 billion

(The expected investment capital, denominated in VND and USD)

  • Investment type: BOT or BOT combined with BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Capacity in phase 1 (2020): 168,000m3/day. Capacity in phase 2 (2030) : 270.000m3/day

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Urban technical infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: Tân Bình Wastewater treatment plant

(Project name)

Location: Bình Tân District

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 6,500 billion

(The expected investment capital, denominated in VND and USD)

  • Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Capacity: 180,000m3/day

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Urban technical infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: West of Sài Gòn wastewater treatment plant

(Project name)

Location: Bình Tân District

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 2,400 billion (including site clearance of VND 800 billion)

(The expected investment capital, denominated in VND and USD)

  • Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Capacity in phase 1 (2020) : 138,000m3/day; Capacity in phase 2 (2030) : 230,000m3/day

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Urban technical infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: North of Sài Gòn wastewater treatment plant 1

(Project name)

Location: Bình Tân District

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 2,700 billion (including site clearance of VND 900 billion)

(The expected investment capital, denominated in VND and USD)

  • Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Capacity in phase 1 (2020) : 142,000m3/day; Capacity in phase 2 (2030) : 230,000m3/day

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Transport infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: Inter-provincial road 14 (Phạm Văn Hớn road)

(Project name)

Location: Hóc Môn District

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 2,100 billion (including site clearance of VND 1,200 billion)

(The expected investment capital, denominated in VND and USD)

  • Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Road length 4.5km; Cross section: 40m

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Transport infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: Trịnh Thị Miếng Road (new Inter-provincial road 15)

(Project name)

Location: Hóc Môn District

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 512 billion

(The expected investment capital, denominated in VND and USD)

  • Investment type: BOT or BOT combined with BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Road length 6 km; Cross section: 35m

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Transport infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: Inter-provincial road 15 (from Xáng bridge to Bến Nảy bridge)

(Project name)

Location: Củ Chi District

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 3,119 billion (including site clearance of VND 1,126 billion)

(The expected investment capital, denominated in VND and USD)

  • Investment type: BOT or BOT combined with BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Road length 11.9 km; Cross section: 35m

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)






PROJECT INFORMATION FORM

(Project information form)

  • Project type: Transport infrastructure

(Project type: for example: Infrastructure - Urban Railway, Infrastructure - Ports, Housing, Health care...).

  • Project Name: Inter-provincial road l5 (from Bến Nảy bridge to Inter-provincial road 7 bridge)

(Project name)

Location: Củ Chi District

(Location)

  • Area square:

(Total land, water surface to be used)

  • Projected Investment: VND 2828 billion (Including site clearance of VND 990 billion)

(The expected investment capital, denominated in VND and USD)

  • Investment type: BOT or BOT combined with BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

  • Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Road length 10.45 km; Cross section: 35m

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

  • Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration ... (PC format, quality and size enough for printing) 

  • Contact agency: City People's Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

Каталог: HoatDongAnh
HoatDongAnh -> ĐỀ CƯƠng báo cáo kết quả ĐÓng góP Ý kiến của nhân dâN ĐỐi với dự thảo bộ luật dân sự (SỬA ĐỔI) A. NỘi dung chính của báo cáO
HoatDongAnh -> Ủy ban thưỜng vụ quốc hội chính phủ ĐOÀn chủ TỊch ủy ban trung ưƠNG
HoatDongAnh -> Ủy ban nhân dân cộng hòa xã HỘi chủ nghĩa việt nam thành phố HỒ chí minh độc lập Tự do Hạnh phúc
HoatDongAnh -> Ủy ban nhân dân thành phố HỒ chí minh
HoatDongAnh -> Ban thưỜng trực số: 03 /hd-mttq-btt cộng hòa xã HỘi chủ nghĩa việt nam
HoatDongAnh -> CỘng hòa xã HỘi chủ nghĩa việt nam độc lập –Tự do – Hạnh phúc
HoatDongAnh -> Ủy ban nhân dân cộng hòa xã HỘi chủ nghĩa việt nam thành phố HỒ chí minh độc lập Tự do Hạnh phúc
HoatDongAnh -> Ủy ban nhân dân thành phố HỒ chí minh
HoatDongAnh -> QuyếT ĐỊnh về việc ban hành Quy định cơ chế quản lý đầu tư và xây dựng, quản lý nguồn vốn đầu tư tại các xã thực hiện Chương trình
HoatDongAnh -> Ủy ban nhân dân cộng hòa xã HỘi chủ nghĩa việt nam

tải về 3.07 Mb.

Chia sẻ với bạn bè của bạn:
1   ...   5   6   7   8   9   10   11   12   13




Cơ sở dữ liệu được bảo vệ bởi bản quyền ©hocday.com 2024
được sử dụng cho việc quản lý

    Quê hương